Assistance in coal bunkering,Assistance in upkeep of SGP and GTG HRSG,Shifting of mill rejects ston
National Fertilizers Limited (nfl)
BATHINDA, PUNJAB
Progress
Quantity
15597
Category
Assistance in coal bunkering
Bid Type
Two Packet Bid
National Fertilizers Limited (nfl) has released a public tender for Assistance in coal bunkering, Assistance in upkeep of SGP and GTG HRSG, Shifting of mill rejects stones, Removal and disposal of sludge silt muck, Shut down man days, Supply of manpower during exigency, Cleaning of Control Rooms and Office areas of SG and PP section, complete external cleaning without scaffolding, complete external cleaning with scaffolding in BATHINDA, PUNJAB. Quantity: 15597. Submission Deadline: 30-07-2026 15: 00: 00. Download documents and apply online.
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Assistance in coal bunkering , Assistance in upkeep of SGP and GTG HRSG , Shifting of mill rejects stones , Removal and disposal of sludge silt muck , Shut down man days , Supply of manpower during exigency , Cleaning of Control Rooms and Office areas of SG and PP section , complete external cleaning without scaffolding , complete external cleaning with scaffolding
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
National Fertilizers Limited (nfl)
BATHINDA, PUNJAB
N/A
KOTA, RAJASTHAN
N/A
KOTA, RAJASTHAN
N/A
KOTA, RAJASTHAN
N/A
KOTA, RAJASTHAN
Tender Results
Loading results...
Assistance in coal bunkering
Assistance in coal bunkering
Assistance in upkeep of SGP and GTG HRSG
Assistance in upkeep of SGP and GTG HRSG and upkeep of both coal bunkering systems
Shifting of mill rejects stones
Shifting of mill rejects stones removed from conveyors ash below EP hoppers chimney spilled coal under junction towers crusher house gravity take up pulleys of conveyors including conveyor belts in tractor trolleys to the directed places inside outside the premises of factory
Removal and disposal of sludge silt muck
Removal and disposal of sludge silt muck etc from open surface drains storm water drains within the battery limit of SGP HRSG and MHP including Pipe trenches slurry line trenches and ash settling pits
Shut down man days
Shut down man days One Shut down man day is equivalent to 36 man days
Supply of manpower during exigency
Supply of manpower during exigency for smooth running of plant
Cleaning of Control Rooms and Office areas of SG and PP section
Cleaning of Control Rooms and Office areas of SG and PP section Cleaning of Control Room office areas associated DCS cabinet areas Engg stations of GTG HRSG SGP MHP and Wagon Tippler 26 days a month
complete external cleaning without scaffolding
Complete cleaning of Economizer
complete external cleaning without scaffolding
Complete cleaning of Air pre-heater
complete external cleaning without scaffolding
Cleaning of water wall tubes
complete external cleaning without scaffolding
Cleaning of Super heaters and bank tubes
complete external cleaning without scaffolding
Cleaning of Pent House
complete external cleaning without scaffolding
Cleaning of ESPs Old
complete external cleaning without scaffolding
Cleaning of ESPs New
complete external cleaning without scaffolding
Cleaning of Goose Necks
complete external cleaning without scaffolding
Cleaning of Wind Box
complete external cleaning with scaffolding
Complete cleaning of Economizer
complete external cleaning with scaffolding
Complete cleaning of Air pre-heater
complete external cleaning with scaffolding
Cleaning of water wall tubes
complete external cleaning with scaffolding
Cleaning of Super heaters and bank tubes
complete external cleaning with scaffolding
Cleaning of Pent House
complete external cleaning with scaffolding
Cleaning of ESPs Old
complete external cleaning with scaffolding
Cleaning of ESPs New
complete external cleaning with scaffolding
Cleaning of Goose Necks
complete external cleaning with scaffolding
Cleaning of Wind Box
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Assistance in coal bunkering | Assistance in coal bunkering | 4,388 | operations | [email protected] | 365 | |
| 2 | Assistance in upkeep of SGP and GTG HRSG | Assistance in upkeep of SGP and GTG HRSG and upkeep of both coal bunkering systems | 7,717 | operations | [email protected] | 365 | |
| 3 | Shifting of mill rejects stones | Shifting of mill rejects stones removed from conveyors ash below EP hoppers chimney spilled coal under junction towers crusher house gravity take up pulleys of conveyors including conveyor belts in tractor trolleys to the directed places inside outside the premises of factory | 2,463 | trolleys | [email protected] | 365 | |
| 4 | Removal and disposal of sludge silt muck | Removal and disposal of sludge silt muck etc from open surface drains storm water drains within the battery limit of SGP HRSG and MHP including Pipe trenches slurry line trenches and ash settling pits | 50 | trolleys | [email protected] | 365 | |
| 5 | Shut down man days | Shut down man days One Shut down man day is equivalent to 36 man days | 10 | rate per shutdown manday | [email protected] | 365 | |
| 6 | Supply of manpower during exigency | Supply of manpower during exigency for smooth running of plant | 930 | rate per manday | [email protected] | 365 | |
| 7 | Cleaning of Control Rooms and Office areas of SG and PP section | Cleaning of Control Rooms and Office areas of SG and PP section Cleaning of Control Room office areas associated DCS cabinet areas Engg stations of GTG HRSG SGP MHP and Wagon Tippler 26 days a month | 12 | man months | [email protected] | 365 | |
| 8 | complete external cleaning without scaffolding | Complete cleaning of Economizer | 2 | number of boilers | [email protected] | 365 | |
| 9 | complete external cleaning without scaffolding | Complete cleaning of Air pre-heater | 2 | number of boilers | [email protected] | 365 | |
| 10 | complete external cleaning without scaffolding | Cleaning of water wall tubes | 2 | number of boilers | [email protected] | 365 | |
| 11 | complete external cleaning without scaffolding | Cleaning of Super heaters and bank tubes | 2 | number of boilers | [email protected] | 365 | |
| 12 | complete external cleaning without scaffolding | Cleaning of Pent House | 2 | number of boilers | [email protected] | 365 | |
| 13 | complete external cleaning without scaffolding | Cleaning of ESPs Old | 2 | number of boilers | [email protected] | 365 | |
| 14 | complete external cleaning without scaffolding | Cleaning of ESPs New | 2 | number of boilers | [email protected] | 365 | |
| 15 | complete external cleaning without scaffolding | Cleaning of Goose Necks | 2 | number of boilers | [email protected] | 365 | |
| 16 | complete external cleaning without scaffolding | Cleaning of Wind Box | 2 | number of boilers | [email protected] | 365 | |
| 17 | complete external cleaning with scaffolding | Complete cleaning of Economizer | 1 | number of boilers | [email protected] | 365 | |
| 18 | complete external cleaning with scaffolding | Complete cleaning of Air pre-heater | 1 | number of boilers | [email protected] | 365 | |
| 19 | complete external cleaning with scaffolding | Cleaning of water wall tubes | 1 | number of boilers | [email protected] | 365 | |
| 20 | complete external cleaning with scaffolding | Cleaning of Super heaters and bank tubes | 1 | number of boilers | [email protected] | 365 | |
| 21 | complete external cleaning with scaffolding | Cleaning of Pent House | 1 | number of boilers | [email protected] | 365 | |
| 22 | complete external cleaning with scaffolding | Cleaning of ESPs Old | 1 | number of boilers | [email protected] | 365 | |
| 23 | complete external cleaning with scaffolding | Cleaning of ESPs New | 1 | number of boilers | [email protected] | 365 | |
| 24 | complete external cleaning with scaffolding | Cleaning of Goose Necks | 1 | number of boilers | [email protected] | 365 | |
| 25 | complete external cleaning with scaffolding | Cleaning of Wind Box | 1 | number of boilers | [email protected] | 365 |
Discover companies most likely to bid on this tender
Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Eastern Coalfields Limited
📍 GODDA, JHARKHAND
E-IN-C BRANCH - MILITARY ENGINEER SERVICES
📍 MUMBAI SUBURBAN, MAHARASHTRA
Eastern Coalfields Limited
📍 GODDA, JHARKHAND
Western Coalfields Limited
📍 NAGPUR, MAHARASHTRA
E-IN-C BRANCH - MILITARY ENGINEER SERVICES
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS