Spider Bearing,Pressure Horn Relay,Rear Mirror assy,Pneumatic pressure valve,Brake booster assy rea
Indian Army
BARAMULLA, JAMMU & KASHMIR
Bid Publish Date
01-Jul-2026, 11:26 am
Bid End Date
11-Jul-2026, 12:00 pm
Location
Progress
Quantity
6
Category
HEAD LAMP RELAY 12V
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for multiple automotive sub-assemblies including HEAD LAMP RELAY 12V, GEAR LEVER KNOB, SPIDER BEARING, SELF FIELD COIL ASSY, FUEL PUMP ASSY, and HYD BOOSTER UNION. The BoQ lists 6 items, with no explicit quantity details published, and an estimated value not disclosed. Bidders must meet OEM turnover criteria and provide ISO 9001 certification, with options to scale quantities by up to 25% during contract execution. This procurement targets established suppliers in defense-grade components with proven supply capability and compliance with quality standards relevant to military hardware.
Product names: HEAD LAMP RELAY 12V, GEAR LEVER KNOB, SPIDER BEARING, SELF FIELD COIL ASSY, FUEL PUMP ASSY, HYD BOOSTER UNION
Standards: ISO 9001 certification required for bidder or OEM
Quantities: 25% quantity variation tolerance during and within contract
Delivery: delivery period calculated from last date of original delivery order; extended period rules apply
OEM considerations: OEM turnover criteria; bunch bids require higher-valued OEM meet turnover
Documentation: mandatory certificates and turnover evidence uploaded with bid
25% +/- quantity adjustment allowed during contract and currency with proportional delivery extension
Bidder and OEM must hold ISO 9001; turnover documentation required for last 3 years
Delivery timelines based on last original delivery date; extended delivery uses prescribed formula
Detailed payment terms not disclosed; bidders should expect standard defense procurement terms with compliance to contract rates and delivery milestones
Delivery period starts from last date of original delivery order; extra time calculated as (increased quantity ÷ original quantity) × original delivery period, with minimum 30 days
Penalties/LD terms not specified in provided data; bidders should refer to bid document for LD percentages and cap limits
Must meet turnover criteria for last 3 financial years
OEM turnover criterion if bidding on behalf of OEM
ISO 9001 certification required for bidder or OEM
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
HEAD LAMP RELAY 12V , GEAR LEVER KNOB , SPIDER BEARING , SELF FIELD COIL ASSY , FUEL PUMP ASSY , HYD BOOSTER UNION
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Indian Army
EAST SIKKIM, SIKKIM
Indian Army
DARJEELING, WEST BENGAL
Indian Army
Tender Results
Loading results...
HEAD LAMP RELAY 12V
HEAD LAMP RELAY 12V
GEAR LEVER KNOB
GEAR LEVER KNOB
SPIDER BEARING
SPIDER BEARING
SELF FIELD COIL ASSY
SELF FIELD COIL ASSY
FUEL PUMP ASSY
FUEL PUMP ASSY
HYD BOOSTER UNION
HYD BOOSTER UNION
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | HEAD LAMP RELAY 12V | HEAD LAMP RELAY 12V | 1 | nos | smbehera | 15 | |
| 2 | GEAR LEVER KNOB | GEAR LEVER KNOB | 1 | nos | smbehera | 15 | |
| 3 | SPIDER BEARING | SPIDER BEARING | 1 | nos | smbehera | 15 | |
| 4 | SELF FIELD COIL ASSY | SELF FIELD COIL ASSY | 1 | nos | smbehera | 15 | |
| 5 | FUEL PUMP ASSY | FUEL PUMP ASSY | 1 | nos | smbehera | 15 | |
| 6 | HYD BOOSTER UNION | HYD BOOSTER UNION | 1 | nos | smbehera | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization certificate (if bidding on behalf of OEM)
ISO 9001 certification document
Technical bid/compliance certificates as per bid document
Bidders must satisfy turnover requirements for the last three financial years, provide ISO 9001 certification, and upload OEM authorizations where applicable. Include GST, PAN, audited financials, and turnout certificates with the bid. Ensure compliance with 25% quantity adjustment and delivery-date calculations per ATC.
Submit GST certificate, PAN card, last 3 years audited financials or CA turnover certificates, ISO 9001 certificate, OEM authorization (if applicable), and technical bid documents. Also provide certificates for each item in the BoQ such as head lamp relay and fuel pump assembly.
The purchaser may increase or decrease quantity up to 25% at contract and during currency. Delivery time adjusts using (increased quantity ÷ original quantity) × original delivery period, with a minimum 30 days, and can extend delivery up to the original period.
The bidder or OEM must hold ISO 9001 certification. No explicit IS standards are listed in the available data; ensure ISO 9001 compliance and provide relevant certificates with the bid.
The BoQ includes six items: HEAD LAMP RELAY 12V, GEAR LEVER KNOB, SPIDER BEARING, SELF FIELD COIL ASSY, FUEL PUMP ASSY, and HYD BOOSTER UNION; exact quantities are not published, but the total item count is six.
Extended delivery is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. If the original period is shorter than 30 days, the extended period equals the original.
OEMs must demonstrate average turnover over the last three years, provide audited statements or CA certificates, and hold ISO 9001 certification. Bids with OEMs lacking turnover evidence or ISO 9001 may be rejected; fleet-wide authorization may be required for all items.
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 DEHRADUN, UTTARAKHAND
Indian Army
📍 KANPUR NAGAR, UTTAR PRADESH
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Air Force
📍 CHANDIGARH, CHANDIGARH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS