Complete Gear Box CSB-225
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
JHANSI, UTTAR PRADESH
Bid Publish Date
11-Jul-2026, 4:44 pm
Bid End Date
21-Jul-2026, 5:00 pm
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow, under the Uttar Pradesh Energy Department. Procurement: Complete gear box for CSB-315. Location: Jhansi, Uttar Pradesh 284001. Scope: Gear box component with no BOQ items listed or explicit quantities; ATC terms together with a bid option clause enabling up to 25% quantity variation. Value/EMD: Not disclosed in the available data. Unique aspect: Buyer reserves right to adjust orders and delivery timelines as per option clause, with extension rules defined. Key differentiator: Delivery-time calculus based on (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. This tender emphasizes flexibility in quantity and delivery under contract extensions.
Product/service name: Complete gear box for CSB-315
Estimated value: Not disclosed
Quantity: Not specified; subject to 25% variation per option clause
Delivery location: Jhansi, Uttar Pradesh
Delivery terms: As per option clause; minimum 30-day additional time
Standards/certifications: Not specified in tender data
Option to vary quantity up to 25% at contract award and during contract
Delivery period calculations include a minimum 30-day extension
Delivery starts from the last date of the original delivery order
Purchaser may increase/decrease order quantity up to 25% of bid quantity at contract placement and during contract at contracted rates.
Delivery period commences from the last date of the original delivery order; extended delivery time uses the formula (Increased quantity ÷ Original quantity) × Original delivery period with a 30-day minimum.
Not specified in the provided data; ATC document should be consulted for any LD or penalty terms.
Demonstrate capability to supply CSB-315 gear boxes within Jhansi, UP under UP energy department procurement
Submit GST, PAN, experience in similar gear box or mechanical component supply, and financial statements
Adhere to option clause delivery terms and any ATC-specified conditions
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Complete gear box for CSB-315
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Jhansi
Delivery Pincodes
284305
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Shailesh Chaurasia | 284305,Parichha Thermal Power Plant | Jhansi | Uttar Pradesh | 284305 | 1 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
JHANSI, UTTAR PRADESH
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
National Aluminium Company Limited, Bhubaneswar
KORAPUT, ODISHA
Indian Oil Corporation Limited
JAGATSINGHAPUR, ODISHA
Rourkela Steel Plant
SUNDERGARH, ODISHA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar gear box supply
Financial statements or turnover evidence
EMD/Security deposit documents per ATC
Technical compliance certificates (if any) referenced in ATC
OEM authorization or dealer/stockist authorization (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders should submit GST registration, PAN, experience certificates, financial statements, and EMD per ATC. Ensure compliance with the option clause allowing up to 25% quantity variation and align delivery timelines with the formula provided: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Required documents include GST registration, PAN, experience certificates for similar gear boxes, financial statements showing turnover, EMD documents, technical compliance certificates, and OEM authorizations if applicable. Ensure submission with the ATC-specific terms viewable in the attached document.
Delivery starts from the last date of the original delivery order. If quantity increases, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; extensions may reach the original delivery period.
The EMD amount is not disclosed in the provided tender data; bidders should refer to the ATC document attached with the tender for exact EMD requirements and payment method (DD/online) if specified.
No specific standards or certifications are listed in the available data. Bidders must review the ATC file for mandatory compliance and any supplier certifications referenced in the terms.
No deadline date is stated in the supplied data; delivery timelines are governed by the original delivery order and the option clause with the 30-day minimum extension rule.
The purchaser may increase or decrease contract quantity up to 25% at contract placement and during currency, at the contracted rates, enabling flexible procurement aligned with project needs.
The procuring organization is Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl), Lucknow, under the Uttar Pradesh Energy Department, conducting a gear box supply tender for CSB-315 in Jhansi.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
N/a
📍 PILIBHIT, UTTAR PRADESH
Bharat Petroleum Corporation Ltd
📍 MUMBAI, MAHARASHTRA
📍 BARDHAMAN, WEST BENGAL
Rourkela Steel Plant
📍 SUNDERGARH, ODISHA
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS