Indian Army Department Of Military Affairs Tapper Roller Bearing ALS Bearing Inner Brake Pad Front Speedometer Cable Relays 12V 24V 5 Years 2026
Indian Army
KOLKATA, WEST BENGAL
Bid Publish Date
04-Feb-2026, 8:20 pm
Bid End Date
14-Feb-2026, 9:00 pm
Location
Progress
Quantity
20
Category
Rear drop link rod LBPV
Bid Type
Two Packet Bid
A tender has been published for Indian Army Rear drop link rod LBPV, Front hub bearing inner, Front hub bearing outer, Door lock LH, Door lock RH, Door lock rear, Brake calliper assy rear, Front calliper brake pipe, Bonnet catch cable, Fuel filter assy with mounting, Clutch plate assy, Pressure plate assy in DODA, JAMMU & KASHMIR. Quantity: 20 by. Submission Deadline: 14-02-2026 21: 00: 00. Check eligibility and apply.
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
KOLKATA, WEST BENGAL
Indian Army
HISAR, HARYANA
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
Sri Ganganagar, RAJASTHAN
Controller General Of Defence Accounts
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Rear drop link rod LBPV | Good | 2 | nos | indraneel@2025 | 15 |
| 2 | Front hub bearing inner | Good | 2 | nos | indraneel@2025 | 15 |
| 3 | Front hub bearing outer | Good | 2 | nos | indraneel@2025 | 15 |
| 4 | Door lock LH | Good | 2 | nos | indraneel@2025 | 15 |
| 5 | Door lock RH | Good | 2 | nos | indraneel@2025 | 15 |
| 6 | Door lock rear | Good | 2 | nos | indraneel@2025 | 15 |
| 7 | Brake calliper assy rear | Good | 1 | nos | indraneel@2025 | 15 |
| 8 | Front calliper brake pipe | Good | 2 | nos | indraneel@2025 | 15 |
| 9 | Bonnet catch cable | Good | 1 | nos | indraneel@2025 | 15 |
| 10 | Fuel filter assy with mounting | Good | 2 | nos | indraneel@2025 | 15 |
| 11 | Clutch plate assy | Good | 1 | nos | indraneel@2025 | 15 |
| 12 | Pressure plate assy | Good | 1 | nos | indraneel@2025 | 15 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Additional Doc 4 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Assam Rifles
Assam Rifles
Indian Army
📍 WEST DELHI, DELHI
Assam Rifles
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS