Indian Army Speedometer, Ignition Coil & Related Parts Tender 2026 – Military Affairs Department, India
Indian Army
PUNE, MAHARASHTRA
Bid Publish Date
25-Jan-2026, 12:18 pm
Bid End Date
04-Feb-2026, 1:00 pm
Location
Progress
Quantity
14
Category
Pressure Plate, Army Bus
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for multiple army bus components including pressure plate, belt tensioner, door glass, solenoids, combination switch, field coil assy, ALS items and related parts. The BoQ comprises 6 items, with no explicit quantities publikly stated. The contract allows a +/- 25% quantity variation and extended delivery timeline calculated from the original period, with minimum 30 days. Post-award, bidders must submit Detailed Design Drawings within 5 days and receive buyer approval within 7 days or risk schedule adjustments. An OEM with positive net worth and suitable turnover is required. A 5-year warranty is mandated from final acceptance or installation completion. Unique emphasis on drawing approvals and option-driven delivery.
Option Clause enables 25% quantity variation during and after award
5-year warranty from final acceptance or after commissioning
Positive net worth and minimum three-year turnover required
Not explicitly detailed in the provided terms; ensure to verify with tender documents and OEM certification while planning payment milestones
Delivery periods may be extended based on the option clause and drawings approval timelines; failure to approve drawings may trigger schedule adjustments without LD
Penalties not explicitly stated; delivery schedule risks managed through extension provisions and drawing-based approvals
Positive net worth as per last audited financial statement
Minimum average annual turnover for last 3 years as per bid requirements
OEM authorization from the original equipment manufacturer
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PUNE, MAHARASHTRA
Indian Army
KOLKATA, WEST BENGAL
Indian Army
Ajmer, RAJASTHAN
Indian Army
Ajmer, RAJASTHAN
Indian Army
BARAMULLA, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Pressure Plate, Army Bus | Pressure Plate, Army Bus | 2 | nos | 312fwc | 30 |
| 2 | Belt Tensioner, Tata | Belt Tensioner, Tata | 1 | nos | 312fwc | 30 |
| 3 | Combination Switch, RE | Combination Switch, RE | 1 | nos | 312fwc | 30 |
| 4 | Field Coil Assy, Army Bus | Field Coil Assy, Army Bus | 1 | nos | 312fwc | 30 |
| 5 | Door Glass, ALS | Door Glass, ALS | 8 | nos | 312fwc | 30 |
| 6 | Solenoid, ALS | Solenoid, ALS | 1 | nos | 312fwc | 30 |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Key insights about WEST BENGAL tender market
Bidders should prepare OEM authorization, GST and PAN, audited turnover statements for last 3 years, and design drawings/technical compliance certificates. Ensure positive net worth and submit 5-year OEM warranty certificates at delivery. Follow the option clause for quantity variations and obtain buyer approval for Detailed Design Drawings within 5 days of award.
Submit GST registration, PAN, at least 3 years of experience certificates, audited financial statements or CA certificate indicating turnover, OEM authorization, technical bid, and OEM warranty certificates. Also provide Detailed Design Drawings within 5 days of award and any applicable EMD documents as per terms.
The tender emphasizes OEM warranty for 5 years, positive net worth, and minimum turnover for the last 3 years. Detailed Design Drawings must be approved within 5 days, with modification lists provided within 7 days, and quantity variations limited to ±25% as per option clause.
Delivery is linked to Drawing approval; if Buyer delays approval, the delivery period is refixed without Liquidated Damages for that delay. Approved drawings establish the baseline for fabrication and supply schedules.
The Purchaser may increase or decrease order quantity up to 25% at contract placement and during the contract currency, with delivery extension calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
A 5-year OEM warranty is mandatory from final acceptance or after installation completion. OEM warranty certificates must be submitted at delivery, and the seller must guarantee rectification of any breakdown during the warranty period at consignee location.
Bidders must show positive net worth as per last audited financials and meet the minimum average annual turnover over the last 3 years as specified in the bid document, verified via audited balance sheets or CA certificates.
Submit Detailed Design Drawings within 5 days of award; Buyer will approve or provide a modification list within 7 days. All supplied goods must conform to the approved drawings with communicated modifications applied during fabrication.
Indian Army
📍 AMBALA, HARYANA
Indian Army
📍 BANGALORE, KARNATAKA
Indian Army
Indian Army
📍 IMPHAL WEST, MANIPUR
Indian Army
📍 GURDASPUR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS