TenderDekho Logo
GEM

Indian Army Procurement of Mechanical Components (Oil Seal, Washer, O Ring, Valve) Tender Lalitpur UP 2026

Bid Publish Date

17-Jun-2026, 8:04 pm

Bid End Date

27-Jun-2026, 9:00 pm

Progress

Issue17-Jun-2026, 8:04 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

32

Category

OIL SEAL

Bid Type

Single Packet Bid

Key Highlights

  • Specific: 25% quantity flex for order during contract and currency
  • Advance sample process: 5 days for submission, 5 days for buyer feedback
  • Delivery timing recalculation based on extended quantities with minimum 30 days
  • No explicit EMD amount disclosed; comply with standard government deposit
  • Military supplier readiness for OEM approvals and sample-based bulk manufacturing

Categories 8

Tender Overview

The Indian Army under the Department Of Military Affairs invites bids for a complete set of mechanical components including OIL SEAL, WASHER, GROVING, BUSH, O RING, VALVE, PLATE, STANER, SCREW, PRE GUAGE, VALVE PIN, and NOZZLE. Location: LALITPUR, UTTAR PRADESH 284122. Estimated value and exact quantities are not disclosed; tender scope covers 12 items with multiple line items likely pending BOQ finalization. The procurement emphasizes standardization and compatibility with military-grade assemblies, with a robust option clause to adjust quantities by up to 25% during contract execution. The contract requires advance sample approval before bulk manufacturing, with a 5-day window for both submission and modification discussion. A rigorous supply regime is expected to align with approved samples and contract specifications. The terms also provide for potential delivery-time adjustments when options are exercised, ensuring predictable scheduling for military logistics.

Technical Specifications & Requirements

  • Product names: OIL SEAL, WASHER, GROVING, BUSH, O RING, VALVE, PLATE, STANER, SCREW, PRE GUAGE, VALVE PIN, NOZZLE.
  • Key process terms: advance sample approval required; 5 days for sample submission and 5 days for modification replies.
  • Delivery framework: delivery period adjusted based on additional quantity vs original quantity; minimum 30 days otherwise.
  • Quality/assembly compliance: references to contract specifications framework; bulk supply only after approved sample.
  • No explicit technical standards listed; emphasis on conformance to buyer’s specifications and supply chain readiness.

Terms, Conditions & Eligibility

  • EMD: not disclosed in data; bidders must comply with standard procurement security deposits per contract terms.
  • Quantity flexibility: up to 25% increase/decrease in ordered quantity during execution.
  • Advance sample: mandatory approval prior to bulk production; initial sample to be submitted within 5 days of award; modifications within 5 days.
  • Penalties/LD: not specified; risk of contract termination if major deviations found in samples.
  • Delivery: schedule to be recalculated if sample approval is delayed; extended delivery period may apply.
  • Documentation: bidders should be prepared to submit typical government procurement documents and OEM/quality compliance proofs as required by buyer’s terms.

Key Specifications

  • Product family: mechanical components list (oil seals, washers, rings, valves, screws, nozzles)

  • Advance sample submission: 5 days from contract award

  • Sample approval cycle: 5 days for buyer feedback

  • Delivery window: implied by original vs additional quantity; minimum 30 days

  • Quality framework: conformance to contract specifications; bulk supply post-approval

Terms & Conditions

  • Quantity may be increased/decreased by up to 25% during contract

  • Advance sample approval required before bulk manufacturing

  • Delivery period adjustments apply if sample approval is delayed

Important Clauses

Payment Terms

Not specified in data; bidders should expect standard government payment terms per contract

Delivery Schedule

Delivery period linked to quantity adjustments; minimum 30 days if extended due to option clause

Penalties/Liquidated Damages

Not explicitly stated; non-conformance may trigger contract termination at buyer’s discretion

Bidder Eligibility

  • Experience in supplying mechanical components to government/military bodies

  • Financial stability evidenced by audited statements

  • Ability to provide OEM authorizations and sample-based approval readiness

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

OIL SEAL , WASHER , GROVING , BUSH , O RING , VALVE , PLATE , STANER , SCREW , PRE GUAGE , VALVE PIN COMPLETE , NOZZLE

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9483911.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

valve,valve seal kit,push button,bush,bearing bushing,oil pump,o ring kit,cylinder head gasket

Indian Army

KACHCHH, GUJARAT

Posted: 11 July 2025
Closed: 26 July 2025
GEM

Cam bush,Thrust washer,Oil nozzle spray,Oil seal,V belt,V belt,Tappet valve,Ring sealing top,Ring s

Indian Army

Posted: 15 July 2025
Closed: 25 July 2025
GEM

Hose,Bracket,Bushing,Seal Dust,Bolt,O Ring,Hose,Hose,Seal Oil,Rod,Yoke,Lever RH,Lever RH,Rod,Screw,

Indian Army

DIMAPUR, NAGALAND

Posted: 1 May 2025
Closed: 29 May 2025
GEM

NOZZLE,THRUST WASHER,DELIVERY VALVE,ELEMENT,OIL SEAL

Indian Army

FIROZPUR, PUNJAB

Posted: 19 December 2024
Closed: 9 January 2025
GEM

Setscrew socket,Ring Retaining,Shim,Washer,Key,Key,Nut-Bearing,Shim,Shim,Seal O-Ring,Lock Washer,Lo

Indian Coast Guard

JAGATSINGHAPUR, ODISHA

Posted: 28 October 2025
Closed: 28 November 2025
GEM

Bill of Quantities (BOQ) 12 Items Sign in for GEM prices

#1

OIL SEAL

OIL SEAL

3 pieces Delivery: 15 days
#2

WASHER

WASHER

6 pieces Delivery: 15 days
#3

GROVING

GROVING

3 meter Delivery: 15 days
#4

BUSH

BUSH

3 pieces Delivery: 15 days
#5

O RING

O RING

8 pieces Delivery: 15 days
#6

VALVE

VALVE

2 pieces Delivery: 15 days
#7

PLATE

PLATE

1 pieces Delivery: 15 days
#8

STANER

STANER

1 pieces Delivery: 15 days
#9

SCREW

SCREW

2 pieces Delivery: 15 days
#10

PRE GUAGE

PRE GUAGE

1 pieces Delivery: 15 days
#11

VALVE PIN COMPLETE

VALVE PIN COMPLETE

1 pieces Delivery: 15 days
#12

NOZZLE

NOZZLE

1 pieces Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

- GST registration certificate

2

- PAN card

3

- Experience certificates demonstrating relevant supply history

4

- Financial statements (last 3 years preferred)

5

- EMD document or security deposit as applicable

6

- Technical bid documents and compliance statements

7

- OEM authorization certificates (if applicable)

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

What documents are required for the Indian Army tender in Lalitpur

Bidders must submit GST registration, PAN, experience certificates, financial statements, EMD/security deposit, technical compliance documents, and OEM authorizations. Ensure sample readiness for advance approval and provide any required manufacturer certifications to qualify for bulk supply.

How to bid for oil seal and valve components for the Indian Army

Prepare a full technical bid, ensure OEM approvals are in place, and submit the advance sample within 5 days of award. Include quantity flexibility awareness (up to 25%), and confirm delivery schedules align with extended periods arising from option clauses.

What are the sample submission timelines for advance approval

Submit the advance sample within 5 days of contract award. The buyer will respond with approval or a modification list within 5 days. If approvals delay, the delivery period may be replanned with no LD for the delay period.

What standards or certifications are required for military components

While explicit standards are not listed, ensure conformance to the contract specifications framework and provide OEM authorization and quality certifications as per the buyer’s terms for bulk manufacturing after approval.

What is the delivery timeframe if quantities increase under the option clause

The additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. The purchaser may extend this duration up to the original delivery period.

What is the EMD amount for this Lalitpur tender

The EMD amount is not disclosed in the provided data; bidders should prepare to submit the standard EMD/security deposit as per buyer terms and consistent with government procurement practices.

Similar Tenders

5 found
Urgent

Indian Air Force Valve Parts Tender West Delhi 2026 - 25-Item Seal Rings, Banjo Bolts, Oilless Filters ISO/IS 550 Compliant 2026

Indian Air Force

📍 WEST DELHI, DELHI

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

Seal Oil,Hose 1,Hose 2,Hose 3,Hose 4,Hose 5,Switch Press,Valve Pilot

Bharat Coking Coal Limited

📍 DHANBAD, JHARKHAND

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM

Indian Army Jammu Procurement of Mechanical Spares Tender 2026 ISO 9001 Compliant 2026

Indian Army

📍 JAMMU, JAMMU & KASHMIR

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

GASKIT,PISTON STD,RING SET PISTON STD,BEARING CONNECTING ROD,JOINT ASSY UNIVERSAL,OIL SEAL,ASSY TIE

Indian Army

📍 ALWAR, RAJASTHAN

Est: ₹1
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Shaft,Knob,Governor Assy,Stainer,Hose,Nipple,Lamp Assembly,Horn,Cutting Edge,End Bit,End Bit,Washer

Indian Army

📍 JALANDHAR, PUNJAB

Est: ₹3.0 L
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM