Custom Bid for Services - TOTAL PRICE (INCLUDING APPLICABLE GST) IN PLUS OR MINUS OR EQUAL TO with
Gail India Limited
RAIGAD, MAHARASHTRA
Bid Publish Date
27-Nov-2025, 4:07 pm
Bid End Date
12-Jan-2026, 12:00 pm
Location
Progress
Quantity
48
Category
Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 01 Items
Bid Type
Two Packet Bid
Bharat Petroleum Corporation Ltd invites bids through GeM for a multi-item security equipment procurement with 48 BOQ items (N/A quantities listed). The contract embeds a 25% quantity option at contracted rates and allows extension of delivery time proportional to increased quantity, subject to a minimum 30 days. MSE purchase preference applies to eligible manufacturers, with price matching opportunities for L-1 bidders within defined margins. Inspection will follow RFQ terms uploaded on GeM. This opportunity targets suppliers capable of scalable supply and adherence to GeM terms.
Product/service names: security equipment procurement (as per BOQ in RFQ)
Quantities: not disclosed in excerpt; 48 items in BOQ
Estimated value: not specified
Experience: prior similar security equipment supply preferred
Standards/Compliance: to be confirmed in RFQ terms and any ISI/ISO references if applicable
Delivery: extension terms apply via option clause; minimum 30 days for added quantity
Inspection: per RFQ documents on GeM
Quantity variation up to 25% at contracted rates with proportional delivery time
MSE purchase preference eligibility for goods (manufacturers) and services eligibility for service providers
Inspection and RFQ terms govern bid conditions; GeM RFQ overrides general terms
Payment terms to be as per RFQ/GeM Terms; specifics not provided in excerpt
Delivery period scales with quantity via formula; minimum 30 days for added quantity
Not specified in provided data; to be confirmed in RFQ terms
Manufacturer status required for MSE purchase preference for goods
Service provider eligibility for services (be the service provider of offered service)
Compliance with RFQ terms and GeM portal terms; inspection requirements
Gail India Limited
RAIGAD, MAHARASHTRA
Bharat Earth Movers Limited (beml)
KOLAR, KARNATAKA
Gail India Limited
RAIGAD, MAHARASHTRA
Gail India Limited
AURAIYA, UTTAR PRADESH
Bharat Earth Movers Limited (beml)
KOLAR, KARNATAKA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 01 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 2 | Total Transportation charges up to Project Site including GST for GROUP 01 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 3 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 01 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 4 | Per diem rate of Supervision Charges including GST for GROUP 01 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 5 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 02 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 6 | Total Transportation charges up to Project Site including GST for GROUP 02 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 7 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 02 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 8 | Per diem rate of Supervision Charges including GST for GROUP 02 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 9 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 03 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 10 | Total Transportation charges up to Project Site including GST for GROUP 03 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 11 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 03 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 12 | Per diem rate of Supervision Charges including GST for GROUP 03 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 13 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 04 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 14 | Total Transportation charges up to Project Site including GST for GROUP 04 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 15 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 04 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 16 | Per diem rate of Supervision Charges including GST for GROUP 04 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 17 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 05 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 18 | Total Transportation charges up to Project Site including GST for GROUP 05 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 19 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 05 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 20 | Per diem rate of Supervision Charges including GST for GROUP 05 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 21 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 06 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 22 | Total Transportation charges up to Project Site including GST for GROUP 06 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 23 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 06 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 24 | Per diem rate of Supervision Charges including GST for GROUP 06 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 25 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 07 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 26 | Total Transportation charges up to Project Site including GST for GROUP 07 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 27 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 07 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 28 | Per diem rate of Supervision Charges including GST for GROUP 07 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 29 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 08 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 30 | Total Transportation charges up to Project Site including GST for GROUP 08 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 31 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 08 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 32 | Per diem rate of Supervision Charges including GST for GROUP 08 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 33 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 09 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 34 | Total Transportation charges up to Project Site including GST for GROUP 09 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 35 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 09 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 36 | Per diem rate of Supervision Charges including GST for GROUP 09 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 37 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 10 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 38 | Total Transportation charges up to Project Site including GST for GROUP 10 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 39 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 10 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 40 | Per diem rate of Supervision Charges including GST for GROUP 10 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 41 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 11 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 42 | Total Transportation charges up to Project Site including GST for GROUP 11 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 43 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 11 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 44 | Per diem rate of Supervision Charges including GST for GROUP 11 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
| 45 | Total Basic Supply Price on FOT despatch point basis, including GST for GROUP 12 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 46 | Total Transportation charges up to Project Site including GST for GROUP 12 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 47 | Total Mandatory Spares price on FOT Project Site basis including GST for GROUP 12 Items | AS PER MR | 1 | lot | bprepbuyer3 | 180 |
| 48 | Per diem rate of Supervision Charges including GST for GROUP 12 Items | AS PER MR | 1 | day | bprepbuyer3 | 180 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar security equipment procurements
Financial statements / turnover evidence
EMD documents (as per RFQ terms)
Technical bid documents aligned to RFQ specifications
OEM authorizations or distributorship certificates if applicable
Any inspection/test reports referenced in RFQ
Extended Deadline
12-Jan-2026, 12:00 pm
Opening Date
12-Jan-2026, 12:30 pm
Extended Deadline
05-Jan-2026, 12:00 pm
Opening Date
05-Jan-2026, 12:30 pm
Extended Deadline
31-Dec-2025, 12:00 pm
Opening Date
31-Dec-2025, 12:30 pm
Extended Deadline
29-Dec-2025, 12:00 pm
Opening Date
29-Dec-2025, 12:30 pm
Extended Deadline
19-Dec-2025, 12:00 pm
Opening Date
19-Dec-2025, 12:30 pm
Key insights about MADHYA PRADESH tender market
Bidders must submit GST registration, PAN, experience certificates for similar procurements, financial statements, EMD documents, and OEM authorizations if applicable. Technical bids should align with RFQ specifications uploaded on GeM, and inspection terms will follow the RFQ. Ensure all documents reflect current corporate details.
The option clause allows up to 25% increase in bid quantity at contracted rates; delivery time extends proportionally using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Extended periods may be kept within the original delivery window by BPCL.
MSE preference applies if the bidder is the manufacturer of the offered goods. Traders are excluded. If L-1 is not an MSE but an MSE seller quotes within L-1+15%, they may match and receive up to 25% of the total value under policy margins.
Inspection details are defined in the RFQ terms uploaded on GeM. Bidders must comply with these inspection clauses, which may include testing, conformity checks, and documentation reviews for each item in the 48-item BOQ.
Exact BOQ quantities are provided in the RFQ documents on GeM portal. The excerpt lists 48 items with N/A quantities, so refer to the official RFQ for itemized quantities, unit measurements, and scope of supply per item.
The tender may require ISI or other recognized standards as per RFQ. Exact standard citations (e.g., IS 550, ISO 9001) will be specified in the RFQ documents; bidders should ensure compliance and submit related certificates with the bid.
Deadline details are published in the GeM RFQ for this BPCL procurement. Check the GeM portal for bid opening dates, submission timelines, and any late bid penalties as defined in the RFQ terms.
Prepare OEM authorization letters for offered products, ensure product is compliant with RFQ requirements, attach technical compliance certificates, and provide manufacturer-issued documentation proving capability to supply across all 48 items as per RFQ.
Gail India Limited
📍 AURAIYA, UTTAR PRADESH
Gail India Limited
📍 GAUTAM BUDDHA NAGAR, UTTAR PRADESH
Gail India Limited
📍 AURAIYA, UTTAR PRADESH
Gail India Limited
Indian Oil Corporation Limited
📍 BEGUSARAI, BIHAR
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS