CACA COOLER ASSY. (WITHOUT BLOWER
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bid Publish Date
11-Jul-2026, 10:39 am
Bid End Date
21-Jul-2026, 11:00 am
Location
Progress
Quantity
100
Bid Type
Two Packet Bid
This tender from Bharat Heavy Electricals Limited (BHEL) seeks the supply of CACA COOLER ASSEMBLY (WITHOUT BLOWER). The scope references only a single item category with no BOQItems listed and provides an EMD/estimated value unknown. The contract allows the purchaser to adjust quantities by up to 25%, during both initial and extended periods, with delivery calculated as a function of increased quantity. Pre/post inspection arrangements are outlined, with post-receipt inspection at BHEL Bhopal site and pre-dispatch inspection at supplier premises if selected. Compliance with uploaded certificates is mandatory, and a Material Test Certificate must accompany the supply.
Key differentiators include the option clause on quantity, risk-managed delivery timelines, and mandatory lab verification via the buyer’s testing for acceptance.
CACA COOLER ASSEMBLY (WITHOUT BLOWER) - product name/state
Quantity/BOQ: Not specified (0 items listed)
EMD/Estimated value: Not disclosed
Certification/Testing: Material Test Certificate (MTC) required
Inspection: Post-Receipt at BHEL Bhopal; Pre-dispatch at supplier premises if ATC chosen
Delivery: Quantity variation up to 25%; extended period calculation with minimum 30 days
Option clause permits ±25% quantity variation at contract; delivery timing adjusts accordingly
Post-receipt inspection at BHEL Bhopal; MTC mandatory for acceptance
Non-compliance or delivery delays allow Purchaser to terminate contract
No explicit payment terms stated; refer to ATC for discount/advance payment options and invoicing.
Delivery starts from last date of original delivery order; extended time uses formula with minimum 30 days.
Termination right exists for delays; specific LD not detailed in available data.
Eligibility to supply CACA cooler assemblies
Proven delivery capability for similar components
Compliance with uploading required certificates and MTC
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
CACA COOLER ASSY. (WITHOUT BLOWER)
Advisory Bank
State Bank of India
ePBG Percentage
5%
ePBG Duration (Months)
14
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
24
Delivery Locations
1
Delivery Cities
Bhopal
Delivery Pincodes
462022
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Arun Kumar | 462022,BHARAT HEAVY ELECTRICAL LTD, PIPLANI | Bhopal | Madhya Pradesh | 462022 | - | 24 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
BHOPAL, MADHYA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates in similar assemblies
Financial statements or turnover proof
EMD/Security deposit (as applicable by ATC)
Technical bid documents and certifications
OEM authorization letters (if applicable)
Material Test Certificate (MTC) to accompany shipment
Any certificates requested by ATC/Corrigendum
Key insights about MADHYA PRADESH tender market
Bidders must prepare registrations, upload GST and PAN, provide experience certificates for similar assemblies, and submit required certificates per ATC. Ensure MTC accompanies the shipment. The contract allows ±25% quantity variation and delivery timing based on the original delivery period with a minimum extension of 30 days.
Submit GST registration, PAN card, experience certificates for similar cooler assemblies, financial statements, EMD/ security deposit as applicable, OEM authorizations, technical bid documents, and Material Test Certificate. Ensure all certificates align with ATC/Corrigendum requirements.
Pre-dispatch inspection may occur at the supplier premises if selected by ATC; post-receipt inspection is conducted at BHEL Bhopal. The Material Test Certificate will be used by the buyer lab to determine acceptance.
The terms require Material Test Certificate with procurement; while explicit IS/ISO standards are not listed, ensure all supplied components pass buyer lab verification as acceptance criterion.
Delivery extension uses the formula (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. The purchaser can extend within the contracted rates.
The purchaser can terminate the contract or portion thereof for non-compliance, delayed delivery, or misrepresentation. This includes failure to deliver or replace rejected materials promptly.
Acceptance hinges on buyer lab results from the Material Test Certificate and compliance with post-receipt inspection at BHEL Bhopal. Pre-dispatch inspection may occur if ATC specifies.
Demonstrate prior experience in similar assemblies, furnish financial stability documentation, provide OEM authorizations if applicable, and attach all mandatory certificates and MTC with the bid submission.
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Bharat Heavy Electricals Limited (bhel)
📍 BHOPAL, MADHYA PRADESH
Haryana Board Corporation
📍 PANIPAT, HARYANA
Sign up now to access all documents
Main Document
OTHER
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS