Indian Army Department Of Military Affairs Carburator Assembly Spark Plug Fuel Hose Bid Jalpaiguri West Bengal 2026
Indian Army
JALPAIGURI, WEST BENGAL
Bid Publish Date
08-Jul-2026, 10:11 am
Bid End Date
18-Jul-2026, 11:00 am
Location
Progress
Quantity
7
Category
STARTING ROPE
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, seeks procurement of multiple engine-related components including STARTING ROPE, CYLINDER BLOCK ASSEMBLY, SPARK PLUG, WATER PUMP, CARBURETOR ASSEMBLY, CARBURETOR PIPE, and AVR. The scope is strictly for supply of goods with potential quantity adjustments up to 25% during contract execution. The buyer mandates a non-disclosure obligation and requires a functional service centre within the state of each consignee location if on-site warranty applies. This tender emphasizes post-award inspection flexibility via an independent inspection body and a robust support/escalation framework for bid management. The lack of explicit BOQ quantities signals a flexible, supply-only contract with conditional delivery timelines tied to order quantities. This opportunity is positioned for suppliers capable of meeting defense procurement standards, with emphasis on traceable supply chain commitments and timely delivery. The tender hints at defense-grade components that may require OEM authorizations and dedicated service infrastructure.
Product names: STARTING ROPE, CYLINDER BLOCK ASSEMBLY, SPARK PLUG, WATER PUMP, CARBURETOR ASSEMBLY, CARBURETOR PIPE, AVR
Category: Engine components for military equipment
Quantities: up to +25% variation during contract; delivery period linked to original order; minimum extension 30 days
Standards/Compliance: IS/IS0 standards not specified; bidders to demonstrate OEM authorizations and service capability
Testing/Inspection: Optional independent inspection body available; pre/post-dispatch checks may be used
Warranty/Support: On-site carry-in warranty contingent on component type; service centers required within consignee states
Option Clause allows ±25% quantity adjustment and extended delivery period with calculated timelines
Mandatory NDA to protect contract specifics and design details
Functional Service Centre in each consignee state or establishment within 30 days of award
Payment release contingent on documentary evidence of service centre availability; no fixed advance terms specified in data
Delivery period aligned to last date of original delivery order; additional time formula is (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Not explicitly detailed; standard defense procurements imply LDs for late delivery and performance shortfalls; bidders should seek clarification
Experience in supplying engine components to defense or government entities
Demonstrable service center capability within each consignee state or plan to establish within 30 days
Compliance with non-disclosure and OEM authorization requirements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
STARTING ROPE , CYLINDER BLOCK ASSY , SPARK PLUG WATER PUMP , CARBURETOR ASSY , SPARK PLUG , CARBURETOR PIPE , AVR
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JALPAIGURI, WEST BENGAL
Indian Army
Indian Army
UDHAMPUR, JAMMU & KASHMIR
Indian Army
GURDASPUR, PUNJAB
Indian Army
Tender Results
Loading results...
STARTING ROPE
STARTING ROPE
CYLINDER BLOCK ASSY
CYLINDER BLOCK ASSY
SPARK PLUG WATER PUMP
SPARK PLUG WATER PUMP
CARBURETOR ASSY
CARBURETOR ASSY
SPARK PLUG
SPARK PLUG
CARBURETOR PIPE
CARBURETOR PIPE
AVR
AVR
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | STARTING ROPE | STARTING ROPE | 1 | nos | [email protected] | 15 | |
| 2 | CYLINDER BLOCK ASSY | CYLINDER BLOCK ASSY | 1 | nos | [email protected] | 15 | |
| 3 | SPARK PLUG WATER PUMP | SPARK PLUG WATER PUMP | 1 | nos | [email protected] | 15 | |
| 4 | CARBURETOR ASSY | CARBURETOR ASSY | 1 | nos | [email protected] | 15 | |
| 5 | SPARK PLUG | SPARK PLUG | 1 | nos | [email protected] | 15 | |
| 6 | CARBURETOR PIPE | CARBURETOR PIPE | 1 | nos | [email protected] | 15 | |
| 7 | AVR | AVR | 1 | nos | [email protected] | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar engine-component supply
Financial statements (annual reports, balance sheet)
EMD/Security deposit documentation as per bidding terms
Technical bid documents and certifications
OEM authorization certificates (where applicable)
Non-disclosure declaration on bidder’s letter head
Proof of functional Service Centre establishment or plan to establish within 30 days
Bidders must submit GST registration, PAN, experience certificates for similar supply, financial statements, EMD, technical compliance, OEM authorizations, and the NDA on bidder letterhead. Ensure documentary evidence of a functional service center or a plan to establish within 30 days of award.
Prepare a complete technical bid with part specifications, OEM authorization, and service capabilities. Include EMD details and confirm quantities can adjust up to 25% per contract. Include the NDA and evidence of service support in consignee locations; submit within the bid submission window.
Delivery terms allow a ±25% quantity variation at contract placement and during the currency, with the extended period calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Ensure full compliance before signing contract.
Bidder must provide a dedicated toll-free service line and an escalation matrix. If no service center exists, establish one within 30 days of award and submit documentary evidence. Carry-in or on-site warranty terms depend on component type.
Buyer may use an authorized inspection authority or independent third-party body for pre/post-dispatch checks. An institutional buyer may appoint its own inspector; independent inspection helps mitigate risk and ensures contractual conformance of equipment and documentation.
Bidders must upload a non-disclosure declaration on their letter head, agreeing not to disclose contract details, specifications, or samples to third parties. Violations may incur legal action per applicable rules and contract terms.
Payment terms are aligned to delivery acceptance and documentary proof of service capability. Specific advance or milestone terms are not stated; bidders should clarify payment milestones in their bid and ensure alignment with supplier center readiness.
No explicit standards listed; bidders should provide OEM authorizations and demonstrate capability for defense-grade component supply. Emphasize service-center readiness, NDA compliance, and traceability for military equipment parts.
Indian Army
📍 GURDASPUR, PUNJAB
Indian Army
📍 KATHUA, JAMMU & KASHMIR
Indian Army
📍 KANGRA, HIMACHAL PRADESH
Indian Army
Indian Air Force
📍 LEH, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS