Indian Army Mounting Eng Front and Related Components Tender Jalandhar Punjab 2025
Indian Army
JALANDHAR, PUNJAB
Bid Publish Date
21-Jun-2026, 12:25 pm
Bid End Date
01-Jul-2026, 1:00 pm
Location
Progress
Quantity
14
Category
Mounting Eng Front
Bid Type
Two Packet Bid
The procurement entity is the Indian Army under the Department Of Military Affairs. The contract covers multiple component categories, including Mounting Eng Front, Clutch Master Cyl Assy, Bolt 12X90 Aluminum Welding, Wiper Blade Front/Rear, Speedo Sensor AGB, STG MTG Combination Switch, Brake Shoe Assy, and Door Operating Handle Mechanism Right. The BOQ lists 9 items across unspecified quantities, with no explicit estimated value or EMD disclosed. The tender emphasizes standardization and delivery linked to approved drawings and samples, signaling a highly design-controlled fabrication regime. A key differentiator is the option clause allowing up to 25% quantity variation at contracted rates, plus a minimum delivery-time formula. The tender appears to prioritize adherence to approved design outputs and staged approvals to protect specification integrity.
Product/service names: Mounting Eng Front, Clutch Master Cyl Assy, Bolt 12X90 Aluminum Welding, Wiper Blade Front, Wiper Blade Rear, Speedo Sensor AGB, STG MTG Combination Switch, Brake Shoe Assy, Door Operating Handle Mechanism Right
Quantities: 9 items in BOQ with unspecified values
EMD/estimated value: Not disclosed in data
Delivery: Based on approval timeline; minimum extension 30 days for option-based quantity increases
Standards/certifications: Not specified in data; expect design-approval and OEM-authorized manufacturing compliance
Testing/quality: Sample approval before bulk manufacturing; deviations may lead to contract termination
Option-based quantity variation up to 25% with contract rates and delivery recalculation rules
Detailed Design Drawings required within 5 days of award with buyer approval or modification list
Advance sample approval within 5 days; bulk supply must conform to approved sample
Not specified in data; bidders should seek clarification on schedule linked to milestones and sample approvals
Delivery timeline adjusts with drawing approvals and sample approvals; minimum extension 30 days for option quantity increases
LD terms not specified; may be stated in final contract—bidders should confirm during bid process
Ability to perform design-driven fabrication consistent with buyer-approved drawings
Compliance readiness for vendor-code prerequisites (PAN, GSTIN, cancelled cheque, EFT mandate)
Capability to deliver within revised timelines after drawing/ sample approvals
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Mounting Eng Front , Clutch Master Cyl Assy , Bolt 12X90 - Aluminum Welding , Wiper Blade Frt , Speedo Sensor AGB , STG MTG Combination Switch , Brake Shoe Assy , Door Operating Handle Mech Right , Wiper Blade Rear
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
JALANDHAR, PUNJAB
Indian Army
PANCHKULA, HARYANA
Indian Army
DARJEELING, WEST BENGAL
Indian Army
LEH, JAMMU & KASHMIR
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
Mounting Eng Front
Mounting Eng Front
Clutch Master Cyl Assy
Clutch Master Cyl Assy
Bolt 12X90 - Aluminum Welding
Bolt 12X90 - Aluminum Welding
Wiper Blade Frt
Wiper Blade Frt
Speedo Sensor AGB
Speedo Sensor AGB
STG MTG Combination Switch
STG MTG Combination Switch
Brake Shoe Assy
Brake Shoe Assy
Door Operating Handle Mech Right
Door Operating Handle Mech Right
Wiper Blade Rear
Wiper Blade Rear
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Mounting Eng Front | Mounting Eng Front | 1 | nos | srjco.48 | 21 | |
| 2 | Clutch Master Cyl Assy | Clutch Master Cyl Assy | 1 | nos | srjco.48 | 21 | |
| 3 | Bolt 12X90 - Aluminum Welding | Bolt 12X90 - Aluminum Welding | 4 | nos | srjco.48 | 21 | |
| 4 | Wiper Blade Frt | Wiper Blade Frt | 2 | nos | srjco.48 | 21 | |
| 5 | Speedo Sensor AGB | Speedo Sensor AGB | 1 | nos | srjco.48 | 21 | |
| 6 | STG MTG Combination Switch | STG MTG Combination Switch | 1 | nos | srjco.48 | 21 | |
| 7 | Brake Shoe Assy | Brake Shoe Assy | 2 | nos | srjco.48 | 21 | |
| 8 | Door Operating Handle Mech Right | Door Operating Handle Mech Right | 1 | nos | srjco.48 | 21 | |
| 9 | Wiper Blade Rear | Wiper Blade Rear | 1 | nos | srjco.48 | 21 |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled cheque copy
EFT Mandate copy certified by bank
Any existing OEM authorizations (if applicable)
Technical bid documents demonstrating capability for detailed design work
Vendor Code creation documents as requested
Corporate financial statements (as applicable by buyer)
Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate for vendor-code creation. Provide detailed design drawings within 5 days of award, and a pre-bulk advance sample within 5 days. Ensure compliance with buyer-approved drawings and anticipate a 25% quantity variation clause with adjusted delivery timelines.
Required documents include PAN Card copy, GSTIN copy, cancelled cheque, EFT mandate certified by bank, and any OEM authorizations if applicable. Also include technical bids demonstrating capability for detailed design work and company financials if requested by the buyer.
The option clause allows up to 25% quantity variation at contracted rates. Delivery time is recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days; if original period is under 30 days, extension equals original period.
Submit one advance sample within 5 days of award. Buyer approves or provides a modification list within 5 days. Bulk supply must match the approved sample; delays in sample approval may trigger delivery schedule adjustments without LD.
Submit Detailed Design Drawings within 5 days of award. Buyer will approve or list required modifications within 5 days. Production must align strictly to approved drawings; non-conforming fabrication may lead to rework or contract termination at buyer discretion.
The tender covers Mounting Eng Front, Clutch Master Cyl Assembly, Bolt 12X90 Aluminum Welding, Wiper Blades (Front and Rear), Speedo Sensor AGB, STG MTG Combination Switch, Brake Shoe Assembly, and Door Operating Handle Mechanism Right, across nine items in the BOQ.
The data does not specify exact standards; bidders should anticipate buyer-led compliance with design approvals, OEM authorizations, and typical manufacturing quality controls. Prepare to align with IS or organization-specific standards as defined during bid evaluation.
Key milestones include submission of vendor-code documents at bid stage, submission of Detailed Design Drawings within 5 days of award, and the advance sample within 5 days post-award. Ensure timelines are met to avoid delivery delays due to adjustment clauses.
Indian Army
📍 NAINITAL, UTTARAKHAND
Indian Army
📍 AMRITSAR, PUNJAB
Indian Army
📍 SOUTH WEST DELHI, DELHI
Indian Army
📍 TINSUKIA, ASSAM
Indian Army
📍 JAMNAGAR, GUJARAT
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS