Pulverizer
Assam Rifles
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is issued by the Co-operative Department Bihar for a Pulverizer (Q3) in PURNIA, BIHAR 854102. The tender does not list an explicit estimated value or EMD amount. A key differentiator is the Purchaser’s option to adjust quantities by up to 25%, with corresponding delivery time recalculations. The contract allows acceptance of increased quantities at contracted rates and defines delivery timelines based on the last delivery order date, including a minimum 30-day extension. The BOQ contains zero items, signaling potential direct specification or matched-works requirements. This tender targets suppliers capable of meeting general pulverization equipment needs and related certifications, under a state-level procurement framework. The absence of explicit dates or start/end windows suggests flexible bidding windows aligned to internal procurement calendars.
Quantity may be increased/decreased by up to 25% at contract placement with adjusted delivery time
Delivery period calculations require last date of original/extended delivery order and 30-day minimum extension
Bidders must submit standard procurement documents and comply with ATC terms
Not specified in data; bidders should verify post-bid payment schedule and any advance requirements
Delivery begins from last dated delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period with a 30-day minimum
Not described in data; bidders should confirm LD clauses during bid clarification
Experience in supplying pulverizers or similar processing equipment to government bodies
Demonstrated capability for installation and after-sales support
Financial stability and GST registration
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Pulverizer (Q3)
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Assam Rifles
N/a
Indian Air Force
GWALIOR, MADHYA PRADESH
N/A
NAVSARI, GUJARAT
Central Silk Board
MURSHIDABAD, WEST BENGAL
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Marerial Specification | Blade Material | Stainless Steel, Aluminium, PVC, HSS, alloy Steel |
| Marerial Specification | Material | Stainless Steel, Mild Steel, Metal, PVC, Plastic, Carbon Steel |
| Operating Efficiency | Machine Capacity ( Kg/Hr ) | 1-5, 1-15, 20-25, 20-50, 25-65, 65-125, 80-140, 60-125, 15-40, 50-100, 100-120, 50-300, 50-120, 80-400, 100-500, 100-700, 10 -250, 150-200, 180-250, 200-300, 300-550, 300-1500, 500-4500, 20 -500, 30-1000, 4500- 6000, 3 |
| Operating Efficiency | Motot Required | 2, 3, 5, 7.5, 10, 12.5, 15, 18.5, 20, 25, 30, 40, 50, 55, 60, 70, 80, 90, 100 |
| Operating Efficiency | Motor Speed, RPM | 1400, 1440, 1500, 1600, 1800, 2000, 2100, 2200, 2800, 2950, 3000, 3200, 3450, 3800, 3900, 4200, 4500, 4600, 5000, 5800, 6900, 8400, 9600 |
| Technical Specification and Properties | Type of Hammers | Stirrup, Bar, NA |
| Technical Specification and Properties | Type Rotor (Hammers) | Swing, Rigid, NA |
| Technical Specification and Properties | Automation Grade | Manual, Automatic, Semi-Automatic, Full Automatic |
| Technical Specification and Properties | No. Of Blades | 2 - 8 |
| Technical Specification and Properties | Driven Type | Motor, Pully, V-belt, Gear box, Electric |
| Size and Dimension | Height | 700 - 3200 |
| Size and Dimension | Chamber Size | 8, 10, 12, 14, 16, 20, 32, 36, 40, 42, 52, 5 |
| Size and Dimension | Length | 500 - 3200 |
| Size and Dimension | Weight | 30 - 900 |
| Size and Dimension | Width | 350 - 2800 |
| Size and Dimension | Grinding Disc Diameter, Inch | 5, 6, 7, 8, 10, 11, 13, 14, 15, 16, 17, 20, 28, 30, 32, 40, 48, NA, 6.88, 175 |
| Certification and standard | Cetificates | CE, ISO, NA |
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates for similar pulverizer supply
Financial statements (last 2–3 years)
EMD/Secure deposit as per tender norms
Technical bid documents confirming compliance with specifications
OEM authorization/certifications for pulverizer equipment
Any existing installation/after-sales support plan
Key insights about BIHAR tender market
Bidders should prepare GST, PAN, experience certificates, financial statements, and OEM authorizations. Ensure compliance with the Pulverizer (Q3) specifications, submit technical bid with blade material, rotor type, and motor details, and provide a valid EMD as per local norms. Verify ATC terms for quantity variation.
Required documents typically include GST certificate, PAN card, experience certificates for similar equipment, financial statements, EMD documentation, OEM authorizations, and technical compliance certificates. Prepare installation/maintenance plan and warranty terms to support bid submission and post-award service.
Key aspects include Machine Capacity (Kg/Hr), Motor Required and RPM, Blade Material, Type of Hammers, Rotor Type, Automation Grade, No. of Blades, Driven Type, and Grinding Disc Diameter. Although exact values are not listed, bidders must propose compliant configurations with these categories.
Delivery timing hinges on the original delivery order date with an option for extension. The formula for extra time is (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days. Confirm final timeline in the contract and ATC documents.
The tender data does not disclose a fixed EMD amount. Bidders should anticipate standard EMD requirements and confirm exact value and payment method during clarifications, ensuring readiness to submit DD/online EMD per government norms.
The data lists a generic Certificates field; bidders should provide OEM certifications, safety compliance certificates, and any IS/ISO certifications relevant to pulverizers. Obtain and attach certificates proving blade/material specifications and performance compliance per product category.
The purchaser may vary quantity by up to 25% during contract. The delivery period will adjust using the specified formula, with a minimum 30-day extension. Include contingency planning and scalable production capacity in the technical bid to mitigate schedule risk.
The BOQ shows zero items, indicating either a specifications-driven order or an upcoming schedule. Bidders should rely on the title/category and ATC terms to prepare a detailed technical bid, including material specs, motor and blade configurations, and installation plans.
Indian Army
📍 HYDERABAD, TELANGANA
Central Ayurveda Research Institute
📍 JHANSI, UTTAR PRADESH
Indian Council Of Agricultural Research (icar)
📍 CHATRA, JHARKHAND
Indo Tibetan Border Police (itbp)
📍 LUDHIANA, PUNJAB
Indian Army
📍 KANGRA, HIMACHAL PRADESH
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS