81.33.61.487.5,81.33.61.488.5,81.33.62.430.5,81.33.99.997.5,81.38.12.751.5,81.38.13.750.5,81.38.13.
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Progress
Quantity
31263
Category
81.33.92.121.7
Bid Type
Two Packet Bid
Bharat Petroleum Corporation Ltd invites bids for security equipment procurement in Ernakulam, Kerala. The scope includes 80 BOQ items with undefined individual specifications, targeting suppliers capable of meeting contract delivery within the option clause framework. The tender enforces a potential 25% quantity variation at order and during the contract period at contracted rates. Bidders should align with the ATC terms and demonstrate capability for flexible delivery timelines tied to the option clause. This opportunity demands rigorous supplier readiness and compliance with BPCL’s procurement norms while ensuring timely execution of varied quantity orders. The tender emphasizes statutory compliance, supplier reliability, and delivery discipline within Kerala’s procurement framework.
No explicit item-level specifications in the public data; rely on BOQ and ATC for exact items
Quantity variation up to 25% of bid quantity at contract placement and during currency
Delivery period calculations: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Original delivery period may be extended to cover the full contract duration as per option clause
20+ items likely clamped under 80 BOQ items; exact product categories to be confirmed via official documents
EMD amount and submission method to be confirmed in ATC
25% quantity variation permitted during contract lifecycle
Delivery period mechanics tied to original/extended orders with minimum 30 days
Details will be specified in the contract/ATC; vendors should anticipate standard government-style terms and verify any advance/milestone payments in BPCL ATC
Delivery timelines are linked to the last date of the original or extended delivery order; additional time computed via the option clause formula
Penalty provisions to be defined in final contract; bidders should review LD clauses in ATC and BPCL procurement guidelines
Evidence of prior experience in similar security equipment or related procurements
Demonstrated financial stability (audited statements for the last two years)
GST registration and valid corporate credentials
Compliance with BPCL ATC terms and OEM authorization requirements
Ability to handle 25% quantity variation without compromising delivery
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
81.33.92.121.7 , 81.38.61.182.7 , 81.38.61.185.7 , 81.38.61.260.7 , 81.38.61.286.7 , 81.38.61.302.5 , 81.38.57.960.5 , 81.38.61.220.7 , 81.33.92.101.7 , 81.33.92.281.7 , 81.38.61.040.5 , 81.38.61.207.7 , 81.38.61.212.5 , 81.38.61.319.5 , 81.38.19.357.5 , 81.38.21.003.5 , 81.38.57.741.5 , 81.38.57.966.5 , 81.38.61.261.5 , 81.33.92.521.7 , 81.38.61.178.7 , 81.38.19.238.5 , 81.38.57.735.5 , 81.33.92.201.7 , 81.33.92.262.7 , 81.38.22.105.5 , 81.38.61.073.5 , 81.38.49.004.5 , 81.38.19.532.5 , 81.38.61.200.5 , 81.38.61.217.5 , 81.38.61.913.5 , 81.38.19.530.5 , 81.38.61.067.5 , 81.38.61.069.7 , 81.38.22.107.5 , 81.38.22.129.5 , 81.33.62.187.7 , 81.38.93.004.5 , 81.38.22.106.5 , 81.38.57.883.5 , 81.38.57.895.5 , 81.38.61.063.5 , 81.38.61.080.7 , 81.38.42.453.5 , 81.38.42.452.5 , 81.38.63.064.5 , 81.38.76.364.5 , 81.38.49.003.5 , 81.38.19.517.5 , 81.38.22.123.5 , 81.41.19.500.5 , 81.38.96.258.5 , 81.41.19.505.5 , 81.78.10.687.5 , 81.03.20.512.5 , 81.03.20.513.5 , 81.03.20.514.5 , 81.03.20.515.5 , 81.03.20.524.5 , 81.38.16.322.5 , 81.38.24.001.5 , 81.38.96.693.5 , 81.38.96.935.5 , 81.38.96.938.5 , 81.38.96.942.5 , 81.38.96.943.5 , 81.78.10.717.5 , 81.78.10.718.5 , 81.78.10.719.5 , 81.78.10.720.5 , 81.33.60.763.5 , 81.33.62.340.7 , 81.38.18.055.5 , 81.38.19.528.5 , 81.38.93.040.5 , 81.38.61.050.5 , 81.33.61.463.5 , 81.38.22.120.5
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
ERNAKULAM, KERALA
Tender Results
Loading results...
81.33.92.121.7
STUDBAR WO byNUT A193GRB7 SEL LG2FT 12MM
81.38.61.182.7
STUD W NUT A193GRB7 by2H LG250MM DIA7 by8IN
81.38.61.185.7
STUD W NUT A193GRB7 by2H LG295MM DIA7 by8IN
81.38.61.260.7
STUD W NUT A193GRB7 by2H LG240MM 1 1 by8IN
81.38.61.286.7
STUD W NUT A193GRB7 by2H LG300MM 1 1 by4IN
81.38.61.302.5
STUD W NUT GRpointB7 8UN LG250MM DIA1point1 by4IN
81.38.57.960.5
STUD W NUT GRpointB7 METRIC LG375MM M33
81.38.61.220.7
STUD W NUT A193GRB7 by2H LG230MM DIA1IN
81.33.92.101.7
STUDBAR WO byNUT A193GRB7 SEL LG2FT 10MM
81.33.92.281.7
STUDBAR WO byNUT A193GRB7 SEL LG2FT 30MM
81.38.61.040.5
STUD W NUT GRpointB7 UNC LG165MM DIA1IN
81.38.61.207.7
STUD W NUT A193GRB7 by2H LG265MM DIA1IN
81.38.61.212.5
STUD W NUT GRpointB7 UNC LG190MM DIA1IN
81.38.61.319.5
STUD W NUT GRpointB7 8UN LG300MM 1point3 by8IN
81.38.19.357.5
STUD W NUT GRpointB7 METRIC LG550MM M48
81.38.21.003.5
STUD W NUT A193 GRB7 GR8point8 70MM M12
81.38.57.741.5
STUD W NUT GRpointB7 METRIC LG130MM M16
81.38.57.966.5
STUD W NUT GRpointB7 METRIC LG510MM M33
81.38.61.261.5
STUD W NUT GRpointB7 8UN LG250MM DIA1point1 by8IN
81.33.92.521.7
STUDBAR WO byNUT A193GRB7 11TPI 2FT 5 by8IN
81.38.61.178.7
STUD W NUT A193GRB7 by2H LG200MM DIA7 by8IN
81.38.19.238.5
STUD W 2NUT GRpointB7 by2H METRIC LG655MM M56
81.38.57.735.5
STUD W NUT GRpointB7 METRIC LG95MM M16
81.33.92.201.7
STUDBAR WO byNUT A193GRB7 SEL LG2FT 20MM
81.33.92.262.7
STUDBAR WO byNUT A193GRB7 8TPI 2FT 1point1 by8IN
81.38.22.105.5
STUD W 2NUT GRpointB7 UNC LG90MM DIA5 by8IN
81.38.61.073.5
STUD W NUT GRpointB7 UNC LG140MM DIA5 by8IN
81.38.49.004.5
STUD W NUT A320GRpointL7 UNC LG 110MM 5 by8IN
81.38.19.532.5
STUD W NUT GRpointB7 METRIC LG 320MM M24
81.38.61.200.5
STUD W NUT GRpointB7 UNC LG185MM DIA1IN
81.38.61.217.5
STUD W NUT GRpointB7 UNC LG215MM DIA1IN
81.38.61.913.5
STUD W NUT GRpointB7 by2H UNC LG175MM 1IN
81.38.19.530.5
STUD W NUT A193 GRB7 LG 100MM M16
81.38.61.067.5
STUD W NUT GRpointB7 UNC LG115MM DIA5 by8IN
81.38.61.069.7
STUD W NUT A193GRB7 by2H LG125MM DIA5 by8IN
81.38.22.107.5
STUD W NUT GRpointB7 UNC LG 165MM DIA5 by8 IN
81.38.22.129.5
STUD W NUT GRpointB7 8UN LG190MM DIA1point1 by8 IN
81.33.62.187.7
STUD A193GRB7 LG38MM M10 1point5P
81.38.93.004.5
STUD W NUT GRpointB7 by2H METRIC LG305MM M24
81.38.22.106.5
STUD W 2NUT A193GRB7 by2H LG150MM DIA5 by8IN
81.38.57.883.5
STUD W NUT GRpointB7 METRIC LG305MM M30
81.38.57.895.5
STUD W NUT GRpointB7 METRIC LG460MM M30
81.38.61.063.5
STUD W NUT GRpointB7 UNC LG100MM DIA5 by8IN
81.38.61.080.7
STUD W NUT A193GRB7 by2H LG200MM DIA5 by8IN
81.38.42.453.5
STUD W 2NUT GRpointB8 UNC LG120MM DIA5 by8IN
81.38.42.452.5
STUD W 2NUT GRpointB8 UNC LG180MM DIA5 by8IN
81.38.63.064.5
STUD W NUT A320GRpointL7 LG100MM 5 by8IN
81.38.76.364.5
STUD W NUT GRpointB7 8UN LG295MM DIA1point5 by8IN
81.38.49.003.5
STUD W NUT GRpointL7 UN8 LG 370MM 1point5 by8IN
81.38.19.517.5
STUD W NUT GRB7 by2H METRIC LG 150MM M20
81.38.22.123.5
STUD W NUT A193GRB7 by2H LG200MM DIA5 by8 IN
81.41.19.500.5
NUT HEX A194GR8T TYPE1 M10
81.38.96.258.5
STUD W NUT GRpointB16 8UN LG205MM 1point1 by8IN
81.41.19.505.5
NUT HEX A194GR8T M16
81.78.10.687.5
WASHER SA240 GRpoint321 STD M16
81.03.20.512.5
BOLT HEX A193 GRB8T M16 X 45L
81.03.20.513.5
BOLT HEX A193 GRB8T M16 X 80L
81.03.20.514.5
BOLT HEX A193 GRB8T M16 X 60L
81.03.20.515.5
BOLT HEX A193 GRB8T M16 X 25L
81.03.20.524.5
BOLT HEX A193 GRB8T M10 X 70L
81.38.16.322.5
STUD W 2NUT GRB8T LG60MM M16
81.38.24.001.5
STUD W 2NUT GRpointB16 by4 9UNC LG180MM 7 by8IN
81.38.96.693.5
STUD W NUT GR B16 8UN LG330MM 1point1 by2IN
81.38.96.935.5
STUD W NUT GRpointB16 8UN LG450MM 2IN
81.38.96.938.5
STUD W NUT GRpointB16 8UN LG260MM 1point3 by8IN
81.38.96.942.5
STUD W 2NUT GRpointB16 8UN LG430MM 1point7 by8IN
81.38.96.943.5
STUD W 2NUT GRpointB16 8UN LG860MM 3point1 by2IN
81.78.10.717.5
WASHER GR321 TYPE B NARROW M16
81.78.10.718.5
WASHER GR321 TYPE B WIDE M10
81.78.10.719.5
WASHER GR321 TYPE A NARROW M10
81.78.10.720.5
WASHER GR321 TYPE A WIDE M16
81.33.60.763.5
STUD W NUT GRpointB7 LG 160MM M20
81.33.62.340.7
STUD A193B7 METRIC LG185MM M16
81.38.18.055.5
STUD W NUT GRpointB7M by2HM METRIC LG364MM M27
81.38.19.528.5
STUD W 2NUT GRpointB7 METRIC LG 155MM M20
81.38.93.040.5
STUD W NUT GRpointB7 METRIC LG 165MM M20
81.38.61.050.5
STUD W NUT GRpointB7 UNC LG80MM DIA5 by8IN
81.33.61.463.5
STUD W NUT A193GRpointB7 UNC LG90MM 5 by8IN
81.38.22.120.5
STUD W NUT GRpointB7 UNC LG100MM DIA 5 by8 IN
81.33.61.463.5
STUD W NUT A193GRpointB7 UNC LG90MM 5 by8IN
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 10 | 81.33.92.121.7 | STUDBAR WO byNUT A193GRB7 SEL LG2FT 12MM | 50 | ft | cpokr05 | 42 | |
| 20 | 81.38.61.182.7 | STUD W NUT A193GRB7 by2H LG250MM DIA7 by8IN | 300 | ea | cpokr05 | 42 | |
| 30 | 81.38.61.185.7 | STUD W NUT A193GRB7 by2H LG295MM DIA7 by8IN | 200 | ea | cpokr05 | 42 | |
| 40 | 81.38.61.260.7 | STUD W NUT A193GRB7 by2H LG240MM 1 1 by8IN | 150 | ea | cpokr05 | 42 | |
| 50 | 81.38.61.286.7 | STUD W NUT A193GRB7 by2H LG300MM 1 1 by4IN | 100 | ea | cpokr05 | 42 | |
| 60 | 81.38.61.302.5 | STUD W NUT GRpointB7 8UN LG250MM DIA1point1 by4IN | 100 | pc | cpokr05 | 42 | |
| 70 | 81.38.57.960.5 | STUD W NUT GRpointB7 METRIC LG375MM M33 | 5 | ea | cpokr05 | 42 | |
| 80 | 81.38.61.220.7 | STUD W NUT A193GRB7 by2H LG230MM DIA1IN | 100 | ea | cpokr05 | 42 | |
| 90 | 81.33.92.101.7 | STUDBAR WO byNUT A193GRB7 SEL LG2FT 10MM | 70 | ft | cpokr05 | 42 | |
| 100 | 81.33.92.281.7 | STUDBAR WO byNUT A193GRB7 SEL LG2FT 30MM | 50 | ft | cpokr05 | 42 | |
| 110 | 81.38.61.040.5 | STUD W NUT GRpointB7 UNC LG165MM DIA1IN | 600 | pc | cpokr05 | 42 | |
| 120 | 81.38.61.207.7 | STUD W NUT A193GRB7 by2H LG265MM DIA1IN | 60 | ea | cpokr05 | 42 | |
| 130 | 81.38.61.212.5 | STUD W NUT GRpointB7 UNC LG190MM DIA1IN | 151 | pc | cpokr05 | 42 | |
| 140 | 81.38.61.319.5 | STUD W NUT GRpointB7 8UN LG300MM 1point3 by8IN | 200 | pc | cpokr05 | 42 | |
| 150 | 81.38.19.357.5 | STUD W NUT GRpointB7 METRIC LG550MM M48 | 20 | ea | cpokr05 | 42 | |
| 160 | 81.38.21.003.5 | STUD W NUT A193 GRB7 GR8point8 70MM M12 | 600 | ea | cpokr05 | 42 | |
| 170 | 81.38.57.741.5 | STUD W NUT GRpointB7 METRIC LG130MM M16 | 10 | ea | cpokr05 | 42 | |
| 180 | 81.38.57.966.5 | STUD W NUT GRpointB7 METRIC LG510MM M33 | 10 | ea | cpokr05 | 42 | |
| 190 | 81.38.61.261.5 | STUD W NUT GRpointB7 8UN LG250MM DIA1point1 by8IN | 100 | pc | cpokr05 | 42 | |
| 200 | 81.33.92.521.7 | STUDBAR WO byNUT A193GRB7 11TPI 2FT 5 by8IN | 350 | ft | cpokr05 | 42 | |
| 210 | 81.38.61.178.7 | STUD W NUT A193GRB7 by2H LG200MM DIA7 by8IN | 1,658 | ea | cpokr05 | 42 | |
| 220 | 81.38.19.238.5 | STUD W 2NUT GRpointB7 by2H METRIC LG655MM M56 | 10 | ea | cpokr05 | 42 | |
| 230 | 81.38.57.735.5 | STUD W NUT GRpointB7 METRIC LG95MM M16 | 75 | ea | cpokr05 | 42 | |
| 240 | 81.33.92.201.7 | STUDBAR WO byNUT A193GRB7 SEL LG2FT 20MM | 50 | ft | cpokr05 | 42 | |
| 250 | 81.33.92.262.7 | STUDBAR WO byNUT A193GRB7 8TPI 2FT 1point1 by8IN | 1 | ft | cpokr05 | 42 | |
| 260 | 81.38.22.105.5 | STUD W 2NUT GRpointB7 UNC LG90MM DIA5 by8IN | 7,000 | pc | cpokr05 | 42 | |
| 270 | 81.38.61.073.5 | STUD W NUT GRpointB7 UNC LG140MM DIA5 by8IN | 1,434 | pc | cpokr05 | 42 | |
| 280 | 81.38.49.004.5 | STUD W NUT A320GRpointL7 UNC LG 110MM 5 by8IN | 100 | ea | cpokr05 | 42 | |
| 290 | 81.38.19.532.5 | STUD W NUT GRpointB7 METRIC LG 320MM M24 | 20 | ea | cpokr05 | 42 | |
| 300 | 81.38.61.200.5 | STUD W NUT GRpointB7 UNC LG185MM DIA1IN | 20 | ea | cpokr05 | 42 | |
| 310 | 81.38.61.217.5 | STUD W NUT GRpointB7 UNC LG215MM DIA1IN | 343 | pc | cpokr05 | 42 | |
| 320 | 81.38.61.913.5 | STUD W NUT GRpointB7 by2H UNC LG175MM 1IN | 20 | ea | cpokr05 | 42 | |
| 330 | 81.38.19.530.5 | STUD W NUT A193 GRB7 LG 100MM M16 | 20 | ea | cpokr05 | 42 | |
| 340 | 81.38.61.067.5 | STUD W NUT GRpointB7 UNC LG115MM DIA5 by8IN | 3,596 | pc | cpokr05 | 42 | |
| 350 | 81.38.61.069.7 | STUD W NUT A193GRB7 by2H LG125MM DIA5 by8IN | 1,312 | ea | cpokr05 | 42 | |
| 360 | 81.38.22.107.5 | STUD W NUT GRpointB7 UNC LG 165MM DIA5 by8 IN | 1,000 | pc | cpokr05 | 42 | |
| 370 | 81.38.22.129.5 | STUD W NUT GRpointB7 8UN LG190MM DIA1point1 by8 IN | 20 | pc | cpokr05 | 42 | |
| 380 | 81.33.62.187.7 | STUD A193GRB7 LG38MM M10 1point5P | 12 | ea | cpokr05 | 42 | |
| 390 | 81.38.93.004.5 | STUD W NUT GRpointB7 by2H METRIC LG305MM M24 | 20 | ea | cpokr05 | 42 | |
| 400 | 81.38.22.106.5 | STUD W 2NUT A193GRB7 by2H LG150MM DIA5 by8IN | 3,000 | ea | cpokr05 | 42 | |
| 410 | 81.38.57.883.5 | STUD W NUT GRpointB7 METRIC LG305MM M30 | 10 | ea | cpokr05 | 42 | |
| 420 | 81.38.57.895.5 | STUD W NUT GRpointB7 METRIC LG460MM M30 | 20 | ea | cpokr05 | 42 | |
| 430 | 81.38.61.063.5 | STUD W NUT GRpointB7 UNC LG100MM DIA5 by8IN | 1,944 | pc | cpokr05 | 42 | |
| 440 | 81.38.61.080.7 | STUD W NUT A193GRB7 by2H LG200MM DIA5 by8IN | 1,000 | ea | cpokr05 | 42 | |
| 450 | 81.38.42.453.5 | STUD W 2NUT GRpointB8 UNC LG120MM DIA5 by8IN | 500 | ea | cpokr05 | 42 | |
| 460 | 81.38.42.452.5 | STUD W 2NUT GRpointB8 UNC LG180MM DIA5 by8IN | 500 | ea | cpokr05 | 42 | |
| 470 | 81.38.63.064.5 | STUD W NUT A320GRpointL7 LG100MM 5 by8IN | 200 | ea | cpokr05 | 42 | |
| 480 | 81.38.76.364.5 | STUD W NUT GRpointB7 8UN LG295MM DIA1point5 by8IN | 500 | ea | cpokr05 | 42 | |
| 490 | 81.38.49.003.5 | STUD W NUT GRpointL7 UN8 LG 370MM 1point5 by8IN | 50 | ea | cpokr05 | 42 | |
| 500 | 81.38.19.517.5 | STUD W NUT GRB7 by2H METRIC LG 150MM M20 | 20 | ea | cpokr05 | 42 | |
| 510 | 81.38.22.123.5 | STUD W NUT A193GRB7 by2H LG200MM DIA5 by8 IN | 1,000 | ea | cpokr05 | 42 | |
| 520 | 81.41.19.500.5 | NUT HEX A194GR8T TYPE1 M10 | 150 | ea | cpokr05 | 42 | |
| 530 | 81.38.96.258.5 | STUD W NUT GRpointB16 8UN LG205MM 1point1 by8IN | 80 | pc | cpokr05 | 42 | |
| 540 | 81.41.19.505.5 | NUT HEX A194GR8T M16 | 150 | ea | cpokr05 | 42 | |
| 550 | 81.78.10.687.5 | WASHER SA240 GRpoint321 STD M16 | 200 | ea | cpokr05 | 42 | |
| 560 | 81.03.20.512.5 | BOLT HEX A193 GRB8T M16 X 45L | 300 | ea | cpokr05 | 42 | |
| 570 | 81.03.20.513.5 | BOLT HEX A193 GRB8T M16 X 80L | 50 | ea | cpokr05 | 42 | |
| 580 | 81.03.20.514.5 | BOLT HEX A193 GRB8T M16 X 60L | 60 | ea | cpokr05 | 42 | |
| 590 | 81.03.20.515.5 | BOLT HEX A193 GRB8T M16 X 25L | 60 | ea | cpokr05 | 42 | |
| 600 | 81.03.20.524.5 | BOLT HEX A193 GRB8T M10 X 70L | 30 | ea | cpokr05 | 42 | |
| 610 | 81.38.16.322.5 | STUD W 2NUT GRB8T LG60MM M16 | 50 | ea | cpokr05 | 42 | |
| 620 | 81.38.24.001.5 | STUD W 2NUT GRpointB16 by4 9UNC LG180MM 7 by8IN | 50 | ea | cpokr05 | 42 | |
| 630 | 81.38.96.693.5 | STUD W NUT GR B16 8UN LG330MM 1point1 by2IN | 72 | ea | cpokr05 | 42 | |
| 640 | 81.38.96.935.5 | STUD W NUT GRpointB16 8UN LG450MM 2IN | 20 | ea | cpokr05 | 42 | |
| 650 | 81.38.96.938.5 | STUD W NUT GRpointB16 8UN LG260MM 1point3 by8IN | 50 | ea | cpokr05 | 42 | |
| 660 | 81.38.96.942.5 | STUD W 2NUT GRpointB16 8UN LG430MM 1point7 by8IN | 40 | ea | cpokr05 | 42 | |
| 670 | 81.38.96.943.5 | STUD W 2NUT GRpointB16 8UN LG860MM 3point1 by2IN | 40 | ea | cpokr05 | 42 | |
| 680 | 81.78.10.717.5 | WASHER GR321 TYPE B NARROW M16 | 160 | ea | cpokr05 | 42 | |
| 690 | 81.78.10.718.5 | WASHER GR321 TYPE B WIDE M10 | 80 | ea | cpokr05 | 42 | |
| 700 | 81.78.10.719.5 | WASHER GR321 TYPE A NARROW M10 | 20 | ea | cpokr05 | 42 | |
| 710 | 81.78.10.720.5 | WASHER GR321 TYPE A WIDE M16 | 20 | ea | cpokr05 | 42 | |
| 720 | 81.33.60.763.5 | STUD W NUT GRpointB7 LG 160MM M20 | 15 | ea | cpokr05 | 42 | |
| 730 | 81.33.62.340.7 | STUD A193B7 METRIC LG185MM M16 | 73 | ea | cpokr05 | 42 | |
| 740 | 81.38.18.055.5 | STUD W NUT GRpointB7M by2HM METRIC LG364MM M27 | 20 | ea | cpokr05 | 42 | |
| 750 | 81.38.19.528.5 | STUD W 2NUT GRpointB7 METRIC LG 155MM M20 | 20 | ea | cpokr05 | 42 | |
| 760 | 81.38.93.040.5 | STUD W NUT GRpointB7 METRIC LG 165MM M20 | 20 | ea | cpokr05 | 42 | |
| 770 | 81.38.61.050.5 | STUD W NUT GRpointB7 UNC LG80MM DIA5 by8IN | 320 | pc | cpokr05 | 42 | |
| 780 | 81.33.61.463.5 | STUD W NUT A193GRpointB7 UNC LG90MM 5 by8IN | 202 | ea | cpokr05 | 42 | |
| 790 | 81.38.22.120.5 | STUD W NUT GRpointB7 UNC LG100MM DIA 5 by8 IN | 80 | pc | cpokr05 | 42 | |
| 800 | 81.33.61.463.5 | STUD W NUT A193GRpointB7 UNC LG90MM 5 by8IN | 150 | ea | cpokr05 | 42 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates showing prior similar procurements
Financial statements for the last financial year
EMD submission proof (DD/online transfer as applicable)
Technical bid documents (compliance statements, technical datasheets)
OEM authorizations / dealership certificates (if applicable)
Power of attorney / authorisation for signatory
Any ATC-specific documents uploaded by BPCL
Key insights about KERALA tender market
Bidders should submit GST, PAN, experience certificates, financial statements, EMD, and technical bid with OEM authorizations. Review the ATC for quantity variation up to 25% and delivery mechanics tied to original/extended orders. Ensure 80 BOQ items are fully understood from the official documents and align with BPCL procurement rules.
Required documents typically include GST certificate, PAN card, last two years financial statements, experience certificates of similar supply, EMD payment proof, technical compliance documents, OEM authorization, and power of attorney for the signatory. Confirm additional BPCL ATC uploads before submission.
The purchaser reserves the right to increase or decrease the quantity by up to 25% of the bid quantity at contract placement and during the currency of the contract at the contracted rates, subject to delivery calculations defined in the ATC.
Delivery timelines commence from the last date of the original delivery order; if the option clause is exercised, additional time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
The public data does not specify IS/ISO markings; bidders must verify exact standards in the ATC. Prepare to demonstrate compliance with BPCL’s standard procurement procedures and provide OEM authorizations and technical datasheets as requested.
The tender comprises 80 BOQ items with N/A item-level details in the public data; exact quantities and product categories are contained in the official BOQ and ATC. Bid submission must align with itemized requirements and delivery constraints.
Payment terms will be defined in the final contract/ATC; bidders should expect BPCL typical terms, potentially milestone-based or after delivery acceptance. Verify the exact payment schedule in the ATC and ensure compliance with GST and invoicing requirements.
ATC uploads include purchaser-specific terms, additional technical/commercial requirements, and the option clause details. bidders must review and strictly adhere to ATC instructions, including EMD, delivery, and OEM authorization stipulations.
Bharat Petroleum Corporation Ltd
📍 ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
📍 ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
📍 ERNAKULAM, KERALA
Bharat Petroleum Corporation Ltd
📍 MUMBAI, MAHARASHTRA
Bharat Petroleum Corporation Ltd
📍 ERNAKULAM, KERALA
Sign up now to access all documents
Main Document
OTHER
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS