Indian Army Wall Paper, Curtains, LED Lamp & Electric Bell Tender Pune Maharashtra 2025
Indian Army
PUNE, MAHARASHTRA
Bid Publish Date
05-Jun-2026, 6:52 pm
Bid End Date
15-Jun-2026, 7:00 pm
Location
Progress
Quantity
14
Category
Tower Cooler Symphony
Bid Type
Two Packet Bid
The procurement is by the Indian Army (Department Of Military Affairs) for multiple categories located in Jhansi, Uttar Pradesh 284001. Items listed span Tower Cooler Symphony, Tank LED Small Wall, Wall Lamp, Polish Work GOC Office, and Photo Print. The BOQ shows 5 items with no explicit quantities or values, signaling a bundled or phased supply. The buyer reserves option to adjust quantities by up to 25% and to extend delivery periods accordingly, with a calculated extension formula. Bidder responsibilities include initial sample approval prior to bulk production and submission of two advance samples within 5 days of contract award. These clauses indicate a tight sequencing between approval and manufacturing, and flexibility in scope during contract execution.
Product/service categories: Tower Cooler Symphony, Tank LED Small Wall, Wall Lamp, Polish Work GOC Office, Photo Print
Advance sample submission: 2 samples within 5 days of contract award
Sample modification cycle: buyer provides list within 5 days of sample receipt
Bulk supply must conform to approved sample; deviations may trigger fresh samples or termination
Option clause: quantity may increase by up to 25% during contract and extended delivery period
Delivery-period formula: (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
EMD/price details not disclosed in the provided data; follow standard supplier prequalification
25% quantity variation allowed; delivery extension correlates with quantity change
Advance samples required; bulk supply to follow approved sample specifications
Advance sample approvals govern initial manufacturing; no explicit payment terms stated in available data
Delivery period starts after original delivery order and extends with option-quantity changes; minimum 30 days extension rule applies
No explicit LD figures published; contract may be terminated for major deviations or non-conformity
Vendor capable of supplying listed categories (Tower Cooler, LED Tank, Wall Lamps, Polish services, Photo Print)
Ability to submit advance samples within 5 days of contract award
Compliance with bank-certified EFT Mandate and GST registrations
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Tower Cooler Symphony , Tank LED Small Wall , Wall Lamp , Polish Work GOC Office , Photo Print
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
PUNE, MAHARASHTRA
Indian Army
JAIPUR, RAJASTHAN
Hindustan Petroleum Corporation Ltd
Indian Army
GURDASPUR, PUNJAB
Indian Army
LEH, JAMMU & KASHMIR
Tender Results
Loading results...
Tower Cooler Symphony
Tower Cooler Symphony
Tank LED Small Wall
Tank LED Small Wall
Wall Lamp
Wall Lamp
Polish Work GOC Office
Polish Work GOC Office
Photo Print
Photo Print
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | Tower Cooler Symphony | Tower Cooler Symphony | 1 | nos | estoffr31ad | 15 | |
| 2 | Tank LED Small Wall | Tank LED Small Wall | 9 | nos | estoffr31ad | 15 | |
| 3 | Wall Lamp | Wall Lamp | 1 | nos | estoffr31ad | 15 | |
| 4 | Polish Work GOC Office | Polish Work GOC Office | 1 | nos | estoffr31ad | 15 | |
| 5 | Photo Print | Photo Print | 2 | nos | estoffr31ad | 15 |
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate copy certified by bank
| S.No | Seller | Item | Date | Status |
|---|---|---|---|---|
| 1 | M/S ANANYA TRADING CORPORATION Under PMA | - | 11-06-2026 16:44:45 | |
| 2 | M/S SONU TRADERS Under PMA | - | 10-06-2026 18:44:37 | |
| 3 | TAYAL AND CO. Under PMA | - | 08-06-2026 17:21:04 |
| Rank | Seller | Price | Item |
|---|---|---|---|
| L1 | M/S ANANYA TRADING CORPORATION(MSE)( MSE Social Category:General ) Under PMA | Item Categories : Tower Cooler Symphony,Tank LED Small Wall,Wall Lamp,Polish Work GOC Office,Photo Print | |
| L2 | TAYAL AND CO. Under PMA | Item Categories : Tower Cooler Symphony,Tank LED Small Wall,Wall Lamp,Polish Work GOC Office,Photo Print | |
| L3 | M/S SONU TRADERS (MSE)( MSE Social Category:General ) Under PMA | Item Categories : Tower Cooler Symphony,Tank LED Small Wall,Wall Lamp,Polish Work GOC Office,Photo Print |
Key insights about UTTAR PRADESH tender market
Bidders must register, submit PAN and GSTIN copies, along with a cancelled cheque and bank-certified EFT mandate. Include advance sample readiness within 5 days of award, and ensure two samples meet buyer specifications. Follow the 25% quantity option and delivery extension rules when planning capacity.
Required documents include PAN Card copy, GSTIN copy, Cancelled Cheque, and EFT Mandate certified by the bank. These must accompany the bid for Vendor Code creation and participation in the 5-item BoQ procured by the Indian Army Department.
Within 5 days of contract award, submit 2 advance samples. The buyer will approve or list modifications within 5 days. Bulk supply must strictly adhere to approved sample; delays in approval may shift the delivery timeline and may result in re-sampling if deviations are detected.
The purchaser may increase quantity up to 25% at contract award or during the currency, with delivery periods recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Ensure readiness to scale production within the revised timeline.
No explicit technical specs are published in the data. Emphasis is on sample conformity and administrative procedures; bidders should prepare to demonstrate capability to meet sample-approved designs and standard government quality processes.
Delivery timing starts after original delivery order; if sample approval is delayed, the delivery period is refixed to account for the delay, with a minimum 30-day extension as applicable to the option-adjusted quantity.
If samples show major deviations, the buyer may require new samples or terminate the contract after notifying deviations. All testing samples are provided by the contractor free of cost unless stated otherwise.
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
📍 RAIPUR, CHHATTISGARH
Indian Army
📍 COIMBATORE, TAMIL NADU
Indian Army
📍 Samba, JAMMU & KASHMIR
Indian Army
📍 KUPWARA, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS