GEM

Indian Army STP Consultancy Lump Sum Tender 2025 – CPCB/SPCB Compliance, ISI/IS 550 Not Required

Bid Publish Date

19-Nov-2025, 1:52 pm

Bid End Date

29-Nov-2025, 1:00 pm

Bid Opening Date

29-Nov-2025, 1:30 pm

Value

₹30,68,000

Progress

Issue19-Nov-2025, 1:52 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Key Highlights

  • STP consultancy services with consumables included in lump-sum contract
  • Stage-based payment structure: 40% + 40% + 20% tied to milestones
  • Liquidated damages: 0.5% per week, max 10% for delays
  • Variation clause: ±25% before contract issuance and after, flexible scope
  • CPCB/SPCB compliance as core deliverable; DPR and design review required
  • OEM authorization needed where applicable; mandatory certificates to avoid rejection
  • Performance security typically 3–10% of contract value
  • Notified absence of explicit start/end dates; focus on stage milestones and deliverables

Categories 8

Tender Overview

The Indian Army, Department Of Military Affairs, invites tenders for Facility Management Services on a Lump Sum basis, specifically consultancy services for Sewage Treatment Plant (STP) with consumables included in contract cost. Estimated value is ₹3,068,000. The scope covers design review, DPR preparation, CPCB/SPCB compliance, and advisory on operation, energy efficiency, and sludge management, with periodic site visits. This entails a registered consultancy with demonstrated experience and OEM authorization where applicable. A key differentiator is the integrated delivery of reports and consumables within a single contract, plus a flexible 25% change window before contract issuance. Location details are not specified in the data provided.

Technical Specifications & Requirements

  • Scope of Work: Detailed consultancy for STP design review, DPR preparation, CPCB/SPCB compliance, O&M advisory, energy efficiency, sludge management, and periodic site visits with reporting obligations.
  • Payment Terms: 40% after completion of stage - 2, 40% after completion of stage - 4, 20% after completion of stage - 5.
  • Standards/Compliance: CPCB/SPCB norms; DPR and advisory outputs to meet these frameworks; no explicit IS/ISO standard numbers specified in the data.
  • Qualification: Bidder must be a registered consultancy with demonstrable experience in STP-related consultancy; OEM authorization required where applicable.
  • Liabilities: Liquidated damages for delays at 0.5% per week up to 10%; non-performance penalties including payment withholding and possible termination.
  • Variation Clause: Purchase quantity/duration may be varied by up to 25% prior to contract award and up to 25% after issuance.
  • Deliverables: Reports, DPR, maintenance advisory, energy-savings recommendations, and sludge management plan.

Terms, Conditions & Eligibility

  • EMD/Deposit: Not specified in the data; bidders should expect standard EMD as per GeM terms.
  • Delivery Timeline: Milestones correspond to staged payments; exact calendar not provided.
  • Performance Security: Typically 3–10% of contract value retained; forfeiture possible on breach.
  • Documentation: Manufacturer authorization if using OEM/distributor networks; certificates required to avoid rejection.
  • Termination/Force Majeure: Default termination and force majeure protection; penalties may be waived with proper documentation.
  • Contract Scope: Consumables included in contract cost; comprehensive DM&A compliance and site support.
  • Bidder Eligibility: Must be a registered consultancy with relevant STP experience and capability to deliver all listed services.

Key Specifications

  • STP consultancy scope: design review, DPR preparation, CPCB/SPCB compliance

  • Include advisory on operation & maintenance, energy efficiency, and sludge management

  • Periodic site visits with reporting obligations

  • Estimated contract value: ₹3,068,000

  • Variation: contract quantity/duration ±25%

  • Payment terms: 40%, 40%, 20% across milestones

Terms & Conditions

  • Stage-based payments linked to milestone completion

  • LD for delays: 0.5% per week, up to 10%

  • Consumables included in contract cost; OEM authorization required

Important Clauses

Payment Terms

40% after stage-2, 40% after stage-4, 20% after stage-5; milestones must be clearly defined in DPR

Delivery Schedule

Milestones tied to reports, DPR delivery, site visits; exact dates not provided

Penalties/Liquidated Damages

0.5% of contract value per week of delay, maximum 10% total

Bidder Eligibility

  • Registered consultancy with STP project experience

  • Must provide OEM authorization if applicable

  • Financial stability evidenced by statements and lack of insolvency

Past Similar Tenders (Historical Results)

5 found

Facility Management Services - LumpSum Based - GOVERNMENT; SUPPLY; Consumables to be provided by se

N/a

LUCKNOW, UTTAR PRADESH

Posted: 3 February 2025
Closed: 13 February 2025
GEM

Facility Management Services - LumpSum Based - Commercial; SUPPLY; Consumables to be provided by se

Zilla Panchayath Chitradurga

CHITRADURGA, KARNATAKA

Posted: 13 February 2025
Closed: 24 February 2025
GEM

Facility Management Services - LumpSum Based - Healthcare; CLEANING MATERIALS; Consumables to be pr

N/a

BANGALORE, KARNATAKA

Posted: 24 May 2025
Closed: 3 June 2025
GEM

Facility Management Services - LumpSum Based - Residential and Office Areas; Waste Management Servi

Ans,finance,hr,engineering,tech,ops,commercial,general Store,it

CENTRAL DELHI, DELHI

Posted: 22 April 2025
Closed: 13 May 2025
GEM

Facility Management Services - LumpSum Based - Commercial; ENHANCE FACILITY OF WASTE MANAGEMENT; Co

N/a

KOTTAYAM, KERALA

Posted: 8 October 2025
Closed: 18 October 2025
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST registration certificate

2

PAN card

3

Experience certificates for STP consultancy

4

Financial statements (audited if available)

5

EMD/Security deposit as per GeM terms

6

Technical bid documents demonstrating DPR design capability

7

OEM authorization/Manufacturer Authorization if using authorized distributors

8

Any CPCB/SPCB compliance certificates or equivalent documentation

Frequently Asked Questions

Key insights about MAHARASHTRA tender market

How to bid for the Indian Army STP consultancy tender in 2025?

Bidders must register the consultancy, submit GST/PAN and financials, provide STP project experience, and include OEM authorization if using distributed equipment. Ensure CPCB/SPCB compliance evidence and detailed DPR deliverables. Follow stage-based payment criteria and attach performance security as required.

What documents are required for the STP consultancy bid in India Army?

Required documents include GST certificate, PAN, experience certificates for STP work, audited financial statements, OEM authorization if applicable, and technical bid detailing DPR, design review, and compliance with CPCB/SPCB norms.

What are the key technical requirements for STP design consultancy?

Deliverables include DPR preparation, CPCB/SPCB compliance, operation & maintenance advisory, energy efficiency recommendations, sludge management plan, and periodic site reports. Stage milestones align with payments; no explicit IS/ISO standard cited in data.

What are the payment terms for the Indian Army STP contract?

Payment is staged: 40% after completion of stage-2, 40% after stage-4, 20% after stage-5. These milestones require successful delivery of corresponding reports and DPRs, with typical performance security applicable as per terms.

What is the penalty for delays in STP consultancy deliverables?

Penalties apply as liquidated damages at 0.5% of contract value per week, capped at a maximum of 10%. This incentivizes timely delivery of reports, DPR, and site visit obligations.

Is there a variation in contract quantity for the STP consultancy?

Yes, there is a 25% variation allowance before contract issuance, and up to 25% after contract issuance. Bidder must accept revised quantities or durations as per GeM terms.

Which standards govern CPCB/SPCB compliance in this tender?

Deliverables must ensure compliance with CPCB/SPCB norms. DPR and advisory outputs should reference these standards, though specific IS/ISO numbers are not listed in the provided data.

What is the estimated contract value for the STP consultancy?

The estimated value is ₹3,068,000. Bidders should price the lump-sum consultancy including consumables as per contract scope, with stage-based milestones aligned to payments.

Similar Tenders

4 found
Urgent

Revenue Department Uttarakhand Facility Management Services Tender 2025 – Waste Collection Lump Sum ₹8,000,000 ISO/Service Standards

N/a

📍 CHAMPAWAT, UTTARAKHAND

EMD: ₹45,000
Est: ₹80.0 L
⏰ Deadline: 6 days left
🛒 Type: Service
View GEM
Urgent

Gujarat Health & Family Welfare Facility Management Services Sanitation Tender 2025 – Lump Sum

N/a

📍 JUNAGADH, GUJARAT

⏰ Deadline: 2 days left
🛒 Type: Service
View GEM

Facility Management Services - LumpSum Based - Healthcare; Mechanized & Automated Sanitation Servic

All India Institute Of Medical Sciences (aiims)

📍 JODHPUR, RAJASTHAN

EMD: ₹34.0 L
Est: ₹17.0 Cr
⏰ Deadline: 2 weeks left
🛒 Type: Service
View GEM
Urgent

Punjab National Bank Facility Management Services LumpSum Tender 2025 - Housekeeping, Garbage Disposal & O&M Standards

Punjab National Bank

📍 MUMBAI, MAHARASHTRA

Est: ₹28.0 L
⏰ Deadline: 1 day left
🛒 Type: Service
View GEM