Tender Overview

Organization: NTPC SAIL Power Company Ltd. The tender seeks an external safety audit of NSPCL Bhilai PP-2 (74 MW) and PP-3 (500 MW) to be performed by NSCI Mumbai for two financial years: FY 2025-26 and FY 2026-27. The scope covers independent safety assessment at two power plants owned by NSPCL, with delivery for two consecutive audit cycles and potential scope adjustments under the 25% variant clause. The procurement context centers on regulatory compliance and safety governance oversight for critical generation assets.

  • Service category: Custom Bid for Services – External Safety Audit
  • Location/organization: Bhilai, Chhattisgarh (NSPCL Bhilai complex) under NTPC SAIL umbrella
  • Duration & value indicator: Two-year engagement implied by FY 2025-26 & FY 2026-27; no estimated value disclosed
  • Unique differentiator: Audit by NSCI Mumbai; formalized oversight of safety parameters across two different plant capacities

Technical Specifications & Requirements

  • No technical specifications provided in the tender data. The assignment entails an external safety audit conducted by a national safety accreditation body (NSCI Mumbai) for two NSPCL units (74 MW and 500 MW). The absence of BOQ items indicates a qualitative/verification scope rather than a linear supply/installation job. Bidders should anticipate standards-based audit deliverables, audit methodology, and compliance reporting aligned to regulatory safety norms.
  • Potential evaluation criteria likely to emphasize: auditor credential, NSCI accreditation alignment, scope completeness for both units, and two-year SLA/annual audit cadence.
  • Since spec details are not published, bidders should prepare detailed audit process plans, data collection strategies, and reporting templates compatible with safety governance requirements.

Terms, Conditions & Eligibility

  • EMD: Not specified in the data
  • Experience: Not specified in the data; bidders should assume requisite governance/engineering safety audit capability
  • Delivery: Two-year engagement for FY 2025-26 and FY 2026-27; extended quantity/duration option under 25% clause remains applicable
  • Payment: Not specified in the data; standard procurement terms may apply
  • Documents: Typical bid submissions (GST, PAN, experience certificates) are expected; OEM authorizations may be required for third-party auditors
  • Warranty/Support: Not specified
  • Special Clause: 25% quantity/duration variation allowed at contract issue and post-issue, with bidder acceptance mandatory

Key Specifications

    • Service: External safety audit of NSPCL Bhilai PP-2 (74 MW) and PP-3 (500 MW)
    • Auditor body: NSCI Mumbai as the audit authority
    • Coverage: Two fiscal years: FY 2025-26 and FY 2026-27
    • Deliverables: Compliance audit reports, safety risk assessment, mitigation recommendations
    • Validation scope: Regulatory safety norms; plant-specific safety controls

Terms & Conditions

  • Key Term 1: 25% quantity/duration variation allowed at contract issue or later

  • Key Term 2: Two-year audit engagement for FY 2025-26 and FY 2026-27

  • Key Term 3: NSCI Mumbai to conduct external safety audit for two NSPCL units

Important Clauses

Payment Terms

Not specified in the tender data; bidders should await formal terms

Delivery Schedule

Two-year engagement with annual audit cadence; delivery milestones to be defined in RFP

Penalties/Liquidated Damages

Not specified; bidders should confirm LD terms in final contract

Bidder Eligibility

  • Auditing capability in safety compliance for power generation assets

  • NSCI Mumbai accreditation or equivalent recognized safety audit credentials

  • Experience in multi-unit plant safety assessments and regulatory reporting

Documents 12

GeM-Bidding-8930394.pdf

Main Document

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Scope Of Work Document

SCOPE_OF_WORK

Payment Terms & Condition

PAYMENT

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

NTPC Limited Safety Audit Tender Visakhapatnam 2025 IS 14489 Third Party External Audit

Ntpc Limited

VISAKHAPATNAM, ANDHRA PRADESH

Posted: 18 October 2025
Closed: 12 November 2025
GEM

Custom Bid for Services - EXTERNAL SAFETY AUDIT

Hindustan Petroleum Corporation Ltd

SOUTH GOA, GOA

Posted: 17 May 2025
Closed: 27 May 2025
GEM

Custom Bid for Services - Annual Safety Audit of Tanakpur Power Station for FY 2025-26 & 2026-27

N/a

CHAMPAWAT, UTTARAKHAND

Posted: 20 December 2025
Closed: 5 January 2026
GEM

Custom Bid for Services - EXTERNAL SAFETY AUDIT 2025

Hindustan Organic Chemicals Limited

ERNAKULAM, KERALA

Posted: 25 September 2025
Closed: 6 October 2025
GEM

Custom Bid for Services - BMC OF COAL LAB EQUIPMENTS at NSPCL Bhilai PP3

Ntpc Sail Power Company Ltd

DURG, CHHATTISGARH

Posted: 28 August 2025
Closed: 17 September 2025
GEM

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates for safety/audit engagements

4

Financial statements (latest available)

5

EMD documents (if required by buyer terms)

6

Technical bid documents outlining audit methodology

7

NSCI accreditation/certification (if applicable)

8

OEM authorizations (if third-party auditors engaged)

Financial Results

Rank Seller Price Item
L1NATIONAL SAFETY COUNCIL   Under PMA₹15,28,100Item Categories : Custom Bid for Services - EXTERNAL SAFETY AUDIT OF NSPCL BHILAI PP-2 (74 MW) & PP-3 (500 MW) BY NSC

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for external safety audit tender in Bhilai NSPCL 2025

Bidders must submit GST, PAN, and experience certificates, plus technical bids detailing audit methodology. The contract allows a 25% scope variation; NSCI Mumbai must perform the audit for two NSPCL units (74 MW and 500 MW) across FY 2025-26 and FY 2026-27.

What documents are required for safety audit tender in Bhilai

Required documents include GST registration, PAN, prior audit experience certificates, financial statements, NSCI accreditation (if available), technical bid with audit approach, and OEM authorizations if third-party auditors are engaged. EMD details to be confirmed in the RFP.

What are the technical specifications for NSCI safety audit Bhilai

The tender specifies an external safety audit by NSCI Mumbai for two NSPCL units. Specific technical standards are not published; bidders should prepare audit plans, risk assessment methodologies, and compliance reporting aligned with power plant safety norms and NSCI expectations.

When is the delivery expected for two-year Bhilai audit

Delivery spans two fiscal years: FY 2025-26 and FY 2026-27. The buyer may adjust scope by up to 25% at contract issue or later, so bidders should plan quarterly audit milestones and interim reports accordingly.

What is the EMD amount for the Bhilai safety audit tender

EMD details are not specified in the available data. Bidders should await the formal tender document for the exact EMD amount, payment method, and submission deadline to ensure conformity with NTPC SAIL procurement norms.

How to verify NSCI Mumbai accreditation for Bhilai audit

Verify NSCI Mumbai accreditation status by referencing NSCI’s official directory or guidance notes; ensure auditor credentials align with NSCI requirements for external safety audits in power plants and cross-check the scope for both 74 MW and 500 MW NSPCL units.

What are the key eligibility criteria for Bhilai NSPCL audit

Key eligibility includes demonstrated safety audit experience in power plants, relevant certifications (NSCI or equivalent), ability to deliver two-year audit reports, and capacity to handle both 74 MW and 500 MW units; ensure compliance with general procurement terms and bid submission standards.

What is the scope of work for the external safety audit

Scope includes independent safety assessment, risk analysis, regulatory compliance verification, and recommendations; deliverables comprise audit reports, compliance confirmation, and mitigative action plans for NSPCL Bhilai PP-2 and PP-3 spread across two fiscal years.