Indian Army Clutch & Related Parts Tender Bathinda Punjab 2026 – 25% Quantity Option, Goods Supply 2026
Indian Army
BATHINDA, PUNJAB
The Indian Army, Department Of Military Affairs, invites bids from qualified suppliers for a procurement package covering multiple assembly categories such as BTY cut off switch, steering lock, air horn, air pressure governor assembly, coil systems, hydraulic pressure piping, regulator for engine generator, valve relay air pressure, door lock near gate, and solenoid switch. The location is JALANDHAR, PUNJAB (postal code 144001). The notice emphasizes a flexible quantity framework with a 25% option to modify ordered quantities at contract rates and a delivery-extension mechanism tied to remaining delivery timelines. No explicit itemized quantities or estimated contract value are provided in the available data, but the package spans 11 potential BOQ line items. The unique differentiator is the option-based delivery schedule and quantity variation during contract execution, mandating bidders to adapt to dynamic procurement needs. Unique terms also include bilingual annotations and standard clause references embedded in the Buyer Added Terms.
There are no standard specifications published in the provided data. The tender enumerates 11 BOQ items with all entries marked as N/A, indicating a placeholder structure rather than defined technical requirements. The buyer’s terms reiterate an overarching delivery-time framework and an option clause allowing up to 25% quantity adjustment during and after the contract. Bidders should prepare to align with a broad, possibly equipment-type procurement of military hardware components, while awaiting detailed technical documentation and certificates. Priorities for bidders include readiness to adapt quantities and comply with delivery windows via the option clause.
The tender imposes a flexible quantity strategy: bidders must anticipate a possible 25% increase or decrease in order quantity at contract execution and during the currency of the contract, with delivery timelines adjusted proportionally using the specified formula. The delivery period commences from the last date of the original delivery order, with a minimum 30-day extension rule when option clauses are exercised. Bidders must comply with these delivery mechanics and prepare to justify adjustments within the contract framework.
Key Term 1: 25% quantity variation permitted during contract execution
Key Term 2: Delivery period linked to last date of original delivery order with minimum 30 days extension
Key Term 3: Option clause allows extension and quantity adjustments at contracted rates
Not specified in data; typical Army tenders may require payment after delivery or on milestone completion; confirm via bid documents
Delivery period starts from last date of original delivery order; additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days
Not specified in data; bidders should verify LD provisions in terms and conditions
Experience in supplying similar electrical/mechanical military components
Ability to meet 25% quantity variation and adaptive delivery timelines
Compliance with OEM authorizations and quality certifications
GST registered supplier with valid financial documentation
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
BATHINDA, PUNJAB
Indian Army
KANGRA, HIMACHAL PRADESH
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
NAGAON, ASSAM
Indian Army
JAMNAGAR, GUJARAT
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | BTY CUT OFF SWITCH | TATRA | 1 | nos | ts_clk | 15 |
| 2 | STEERING LOCK | TATRA | 1 | nos | ts_clk | 15 |
| 3 | AIR HORN | TATRA | 1 | nos | ts_clk | 15 |
| 4 | AIR PRESSURE GOVERNOR ASSY | TATRA | 1 | nos | ts_clk | 15 |
| 5 | COIL SYSTEM 2 3 | TATRA | 1 | nos | ts_clk | 15 |
| 6 | COIL SYSTEM 1 3 | TATRA | 1 | nos | ts_clk | 15 |
| 7 | HYDRAULIC PRESSURE PIPE | MGS | 2 | nos | ts_clk | 15 |
| 8 | REGULATOR ENG GENERATOR | ALS | 1 | nos | ts_clk | 15 |
| 9 | VALVE RELAY AIR PRESSURE | ALS | 1 | nos | ts_clk | 15 |
| 10 | DOOR LOCK NEAR GATE | AMB | 1 | nos | ts_clk | 15 |
| 11 | SOLENOID SWITCH | TATA BUS | 1 | nos | ts_clk | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar military hardware components
Financial statements demonstrating financial stability
EMD documentation (amount not specified in data; provide as per tender instructions)
Technical bid documents (compliance statements for listed components)
OEM authorizations for BTY control switches, air horns, and related assemblies
Any existing ISO/quality certifications relevant to military supply (if required)
Key insights about PUNJAB tender market
Bidders should ensure OEM authorizations, GST registration, PAN, and experience certificates are ready. The tender includes an option clause allowing up to 25% quantity variation and a dynamic delivery schedule. Prepare technical compliance statements for BTY switches, steering locks, and related assemblies, with delivery readiness for potential scale changes.
Required documents include GST certificate, PAN, experience certificates for similar components, financial statements, EMD documentation, OEM authorizations, and technical bid submissions demonstrating compliance with listed components such as BTY cut off switches and air pressure regulators.
Delivery starts from the last date of the original delivery order. If quantities increase, extension time is calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum 30 days, and may extend to the original delivery period under option clauses.
While explicit standards are not listed, bidders should provide OEM authorizations and any relevant ISO or quality certifications. Ensure components like BTY switches and solenoids meet military-grade reliability expectations and documentation supports compliance with IS or equivalent standards where applicable.
The purchaser can increase or decrease quantity up to 25% at contracted rates. Delivery timelines adjust according to the formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days, with possible extension up to the original period.
BOQ lists 11 items, all marked N/A in the data, suggesting a placeholder. Bidders should await full technical specification documents; be prepared to supply BTY cut off switches, steering locks, air horns, coil systems, and related assemblies as separate line items.
Government Polytechnic Vyara
📍 SURAT, GUJARAT
Indian Army
📍 WEST DELHI, DELHI
Indian Army
📍 JALPAIGURI, WEST BENGAL
Indian Army
📍 FARIDKOT, PUNJAB
Indian Army
📍 DARJEELING, WEST BENGAL
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS