Solar Photovoltaic Water Pumping Systems (V2) as per MNRE Specification
N/a
GONDIA, MAHARASHTRA
Bid Publish Date
27-Nov-2025, 4:31 pm
Bid End Date
08-Dec-2025, 5:00 pm
EMD
₹14,000
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The opportunity is a government procurement by the Rural Development Department, Uttar Pradesh, for Solar Photovoltaic Water Pumping Systems (V2) aligned with MNRE specifications. The estimated value is not disclosed, while the EMD is ₹14,000. The buyer reserves a 25% bid quantity variation and a 25% increase during contract execution at contracted rates, with delivery time linked to the original order and extended periods. The tender emphasizes MNRE V2 compliance and equipment suitable for rural irrigation needs in Uttar Pradesh. This procurement may involve multiple delivery milestones and extended delivery durations within defined limits. Bidders should align with the option clause and demonstrate capacity to scale within the stipulated percentages.
Product/service: Solar Photovoltaic Water Pumping Systems (V2) as per MNRE specification
EMD: ₹14,000
Delivery: from last date of original delivery order; extension per option clause with minimum 30 days
Quantity flexibility: ±25% during contract and at ordering
Standards: MNRE V2 specification; IS 550 and ISO/IEC where applicable
BOQ: No items listed; procurement scope dependent on MNRE V2 compliant PV pumping systems
EMD of ₹14,000 required with bid submission
Quantity may vary by up to 25% during and after contract
Delivery period adjusts based on original and extended timelines
Not explicitly specified; EMD is ₹14,000; final terms to be confirmed in ATC
Delivery begins from the last date of the original delivery order; extension rules apply with minimum 30 days for increased quantities
Not specified in data; verify in ATC and final tender documents
Demonstrated experience in supplying MNRE-compliant solar pumping systems
Financial capability to support procurement and potential quantity variations
Ability to comply with ATC terms uploaded by the buyer
N/a
GONDIA, MAHARASHTRA
N/a
GONDIA, MAHARASHTRA
N/a
GONDIA, MAHARASHTRA
N/a
GONDIA, MAHARASHTRA
Ahmednagar Zilla Parishad
AHMEDNAGAR, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates (relevant PV pumping systems)
Financial statements or proof of financial stability
EMD deposit receipt (₹14,000) or online payment proof
Technical bid documents demonstrating MNRE V2 compliance
OEM authorizations or dealership certifications (if required by ATC)
Any additional documents specified in the ATC uploaded by the buyer
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, and EMD ₹14,000. Review the ATC uploaded by the buyer for compliance; ensure MNRE V2 standard adherence. Include technical bid with proof of MNRE PV pumping experience and capacity to scale under a 25% quantity variation.
Required documents include GST registration, PAN card, experience certificates for PV pumping systems, financial statements, EMD receipt, technical compliance documents, OEM authorizations if required, and the ATC document uploaded by the buyer; ensure all copies are valid and accessible.
The EMD amount is ₹14,000. Submit the deposit or online payment proof with the bid; ensure the EMD validity aligns with bid submission and any extension per ATC requirements.
Tenders require MNRE V2 specification compliance; bidders should provide documentation showing adherence to MNRE guidelines and any referenced standards such as IS 550 where applicable, plus OEM certifications per ATC for PV pumping equipment.
The buyer may increase or decrease quantity by up to 25% during contract and at order placement. The delivery period adjusts using a calculated extension based on increased quantity, with a minimum extension of 30 days.
Access the ATC document uploaded by the buyer; verify any additional conditions, delivery schedules, warranty, and acceptance criteria. Ensure your bid aligns with ATC requirements, including performance and installation specifics if stated.
Provide certifications or conformity declarations for PV modules, inverters, and pumps as per MNRE V2; include supplier/manufacturer declarations, BOM, performance data, and installation manuals showing IS/IEC alignment where applicable.
Delivery timelines start from the last date of the original delivery order; any extension due to quantity variation follows the option clause with minimum 30 days, as per tender terms and ATC guidance.
N/a
📍 GONDIA, MAHARASHTRA
Satara District Panchayats
📍 SATARA, MAHARASHTRA
N/a
📍 WARDHA, MAHARASHTRA
Navsari Agricultural University Navsari
📍 NAVSARI, GUJARAT
N/a
📍 AHMEDNAGAR, MAHARASHTRA
Access all tender documents at no cost
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS