TenderDekho Logo
GEM

Indian Army Symphony Coolers, Heavy Duty Clothing Iron & Farrata Standing Fan Tender 2026

Bid Publish Date

30-Jun-2026, 9:42 pm

Bid End Date

23-Jul-2026, 9:00 am

Generate Docs

Progress

Issue30-Jun-2026, 9:42 pm
Corrigendum15-Jul-2026
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

12

Category

Symphony Cooler 85 Ltr

Bid Type

Two Packet Bid

Categories 5

Tender Overview

The opportunity is an Indian Army procurement across multiple product categories, including Symphony Cooler 85 Ltr, Symphony Cooler 45 Ltr, Heavy Duty Clothing Iron, Farrata Standing Fan, and knife. The contract contemplates quantity variation up to 25%, with extension rules tied to original delivery periods and a minimum additional time of 30 days. The process mandates prior sample approval and on-site quality inspection before bid submission, with returnable samples due within 90 days of award. Bidders must present working samples for board-approved evaluation; sample approval is a prerequisite for technical evaluation. The opportunity emphasizes strict conformity with buyer-specified quality, originality, and warranty terms.

Technical Specifications & Requirements

  • Product names extracted from the tender: Symphony Cooler 85 Ltr, Symphony Cooler 45 Ltr, Heavy Duty Clothing Iron, Farrata Standing Fan, and knife.
  • No explicit performance metrics or standards published in the tender data.
  • ATC clauses require: on-site visit to buyer premises with working samples; user/buyer approval prior to technical evaluation; samples to be provided in individual shielded packaging within 48 hours of bid end time and returned within 90 days of award.
  • Samples are inspected for originality, warranty terms, and product performance during both technical evaluation and post-delivery.
  • No BOQ values or unit quantities listed; no start/end dates provided; no location specifics disclosed in the data.

Terms, Conditions & Eligibility

  • Quantity can be increased/decreased by up to 25% at contract placement and during currency at contracted rates.
  • Delivery period mechanics: starts from the last date of the original delivery order; extended time calculated as (Additional quantity ÷ Original quantity) × Original period, with a minimum of 30 days.
  • Bidders must obtain sample approval from the board of officers prior to bid opening; only those with approved samples have their commercial bids opened.
  • Bidder must visit buyer premises with working samples for quality inspection and provide certificates uploaded by the bidder; returnable samples due within 90 days of award.
  • The buyer reserves the right to extend delivery duration up to the original delivery period during option clause exercises.
  • All terms must be complied with for eligibility and bid progression.

Key Specifications

  • Product/service names: Symphony Cooler 85 Ltr, Symphony Cooler 45 Ltr, Heavy Duty Clothing Iron, Farrata Standing Fan, knife

  • Quantities: not specified in BOQ; subject to 25% quantity variation

  • Estimated value: Not disclosed

  • Experience: Not specified; implied need for supply capability

  • Quality/standards: No explicit standards published; sampling & warranty terms emphasized

Terms & Conditions

  • EMD: Not disclosed in data; quantity variation allowed up to 25%

  • Delivery: minimum 30 days for additional time during extension

  • Sample approvals: required before bid opening; returnable within 90 days of award

  • Inspection: on-site quality inspection of working samples before technical evaluation

Important Clauses

Payment Terms

Not specified in data; subject to standard agency terms following award

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time formula includes minimum 30 days

Penalties/Liquidated Damages

Not specified; generic option clause implies adherence to delivery timelines

Bidder Eligibility

  • Proven capability to supply Symphony coolers, standing fans, irons, and knives to government buyers

  • Ability to provide working samples and obtain board approval prior to bid evaluation

  • Compliance with sample submission timelines and on-site inspection requirements

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Symphony Cooler 85 Ltr , Symphony Cooler 45 Ltr , Heavy Duty Clothing Iron , Farrata Standing Fan , knife

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

Dehradun

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-DehradunDehradun--315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENTINDIAN ARMY

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 7

GeM-Bidding-9540743.pdf

Main Document

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Crompton High Speed Torpedo 400mm Pedestal Fan,Hair Cooling Cabinet Water Dispenser 20 Ltr,Cello Ta

Indian Army

HARIDWAR, UTTARAKHAND

Posted: 18 April 2025
Closed: 9 June 2025
GEM

90 LTR COOLER,80 LTR COOLER,WALL MOUNT FAN,WALL MOUNT FAN2,WATER COOLER

Indian Army

JABALPUR, MADHYA PRADESH

Posted: 19 June 2026
Closed: 29 June 2026
GEM

Heavy duty Pedestal fan,Branded Desert Cooler,Shopping Mall trolley,Portable Electric incinerator,T

Indian Army

Posted: 23 November 2024
Closed: 14 December 2024
GEM

Stainless Steel Water Cooler,Desert Cooler Heavy Duty,Pedestal Fan,Wall Fan,Water Camper,Water Camp

Indian Army

VADODARA, GUJARAT

Posted: 18 December 2024
Closed: 8 January 2025
GEM

Dehumidifier,Small Dehumidifier,Refrigerator 45 Ltr,Farrata Fan 500 mm,Water Cooler,Earthern Matka

Indian Army

NORTH 24 PARGANAS, WEST BENGAL

Posted: 24 February 2026
Closed: 6 March 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (relevant prior supply of similar items)

4

Financial statements (audited if available)

5

EMD/Security deposit documentation

6

Technical bid documents demonstrating sample readiness

7

OEM authorizations or dealer certifications (if applicable)

8

Certificate of sample approval from the board of officers (upload Post-approval)

Corrigendum Updates

9 Updates
#1

Update

15-Jul-2026
#2

Update

15-Jul-2026

Extended Deadline

23-Jul-2026, 9:00 am

Opening Date

23-Jul-2026, 9:30 am

#3

Update

15-Jul-2026

Extended Deadline

20-Jul-2026, 9:00 am

Opening Date

20-Jul-2026, 9:30 am

#4

Update

15-Jul-2026
#5

Update

15-Jul-2026

Extended Deadline

18-Jul-2026, 9:00 am

Opening Date

18-Jul-2026, 9:30 am

#6

Update

15-Jul-2026

Extended Deadline

16-Jul-2026, 3:00 pm

Opening Date

16-Jul-2026, 3:30 pm

#7

Update

14-Jul-2026

Extended Deadline

15-Jul-2026, 9:00 am

Opening Date

15-Jul-2026, 9:30 am

#8

Update

13-Jul-2026

Extended Deadline

14-Jul-2026, 7:00 pm

Opening Date

14-Jul-2026, 7:30 pm

#9

Update

13-Jul-2026

Extended Deadline

13-Jul-2026, 1:00 pm

Opening Date

13-Jul-2026, 1:30 pm

Frequently Asked Questions

Key insights about UTTARAKHAND tender market

How to bid for Symphony cooler and fan tender in India army 2026

Bidders must secure board-approved samples before bid opening, prepare working samples for inspection, and upload the approval certificate. The tender allows up to 25% quantity variation and requires on-site quality checks prior to technical evaluation. Ensure OEM authorizations and GST/PAN are ready for submission.

What documents are required for army equipment tender participation

Submit GST certificate, PAN card, experience certificates for similar procurements, financial statements, EMD documentation, and technical bid filings. Include OEM authorization if applicable and a certificate proving sample approval from the board of officers.

What are the sample submission requirements for army bids

Provide working samples of each item in individual shielded packaging within 48 hours of bid end time. Samples must be inspected on-site; returnable within 90 days of award. Approval from the user/buyer is mandatory before technical evaluation.

What is the delivery time framework for quantity variation

Delivery can be extended up to the original period when exercising the option clause. Additional time is calculated as (Additional quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days and subject to contract terms.

What are the key eligibility criteria for army procurement

Eligibility includes prior supply capability for similar items, valid GST/PAN, financial stability, and demonstration of sample approval from the board. On-site quality inspection and warranty terms will be verified during technical evaluation.

What are the required standards or certifications for these items

The tender data does not specify IS or BIS standards; however, the emphasis on sample approval, authenticity checks, and warranty terms implies conformity checks during evaluation. Ensure OEM authorization and product quality certifications where applicable.

When does the sample approval need to be completed

Sample approval must be completed prior to bid opening. The board of officers must approve all samples; without approval, the commercial bid will not be opened.

What items are included in this army procurement

The procurement covers Symphony Cooler 85 Ltr, Symphony Cooler 45 Ltr, Heavy Duty Clothing Iron, Farrata Standing Fan, and knife, with potential quantity adjustments up to 25% during and after contracting.

Similar Tenders

5 found
Urgent

Heavy duty maha bali Cooler,Cooler Fan 80mm Regulator,Duck line 63mm,18 inch Exhaust Fan,Air Adjust

Indian Army

📍 JHANSI, UTTAR PRADESH

Est: ₹1.8 L
⏰ Deadline: 6 days left
🛒 Type: Goods
View GEM

National Institute Of Fashion Technology Raigad Maharashtra 80L/120L Water Cooler, 3 Ton Tower AC, BIS/ISI Compliant Tender 2026

National Institute Of Fashion Technology (nift) Head Office New Delhi

📍 RAIGAD, MAHARASHTRA

EMD: ₹1
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Desert Cooler & Main Motor Tender Jammu Kashmir 2026 Department Of Military Affairs

Indian Army

📍 JAMMU, JAMMU & KASHMIR

⏰ Deadline: 3 days left
🛒 Type: Goods
View GEM
Urgent

AIR COOLER 120 LITER,BAJAJ COOLER COOLER 55 LITER,BAJAJ WALL FAN,WATER BOTTLE 20 LITER,ICE BOX 20 L

Indian Army

📍 PUNE, MAHARASHTRA

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Urgent

Air cooler 120 Ltr,wall fan,ceiling fan,computer table,office table

Indian Army

📍 RAJAURI, JAMMU & KASHMIR

Est: ₹2.5 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM