1.5 Ton Split AC,2.0 Ton Split AC,Air Cooler 88 Lit,Inverter with batteries,Tower inverter with wif
Hindustan Petroleum Corporation Ltd
NELLORE, ANDHRA PRADESH
Bid Publish Date
12-Jul-2026, 4:25 pm
Bid End Date
03-Aug-2026, 5:00 pm
EMD
₹1
Location
Progress
Quantity
119
Category
1.5 Ton Split Inverter Air Conditioner
Bid Type
Two Packet Bid
National Institute Of Fashion Technology (NIFT) Head Office, New Delhi invites bids for a multi-item procurement including 80 L Water Cooler, 120 L Water Cooler, 3 Ton Tower Air Conditioner, Electric Steam Iron table with machine, 1.5 Ton Split Inverter Air Conditioner, BLDC Ceiling Fan, Water Purifier for deployment at the Raigad, Maharashtra 400001 campus. The scope covers supply, installation, testing, commissioning, operator training, and statutory clearances if required. The bid accommodates volume variability up to 25% and requires adherence to delivery timelines and post-award extension logic. A minimum turnover and OEM integrity are mandated to ensure capable suppliers.
Product categories include: water coolers, air conditioning units (tower and split inverter), electric steam iron table, BLDC ceiling fans, water purifiers
Delivery scope: supply, installation, testing, commissioning, operator training, and statutory clearances
Turnover: min three-year average annual turnover; OEM turnover criteria apply; documented with audited statements or CA certificate
Imported products: must have registered Indian office for after-sales service
Option clause: quantity may vary up to 25% during contract and currency, with delivery extension as described
EMD amount and submission method to be clarified in bid documents
Delivery timelines permit extended periods with a defined calculation formula
Turnover criteria for bidder and OEM; audited financials or CA certificates required
Bid price must cover supply, installation, testing, commissioning, training; no explicit milestone payments listed; ensure submission includes full cost components
Delivery period can be adjusted with option clause; extended duration computed as (Increased quantity ÷ Original quantity) × Original delivery period, min 30 days
Not explicitly stated; check tender terms for LD provisions and performance bond requirements during contract finalisation
Three-year average annual turnover meeting bid requirements, with audited statements or CA certificate
OEM turnover parity for highest bid value in case of bunch bids
Registered Indian office for after-sales service if offering imported products
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
80 L Water Cooler , 120 L Water Cooler , 3 Ton Tower Air Conditioner , Electric Steam Iron table with machine , 1.5 Ton Split Inverter Air Conditioner , BLDC Ceiling Fan , Water Purifier
Advisory Bank
IDBI Bank
Max Delivery Days
15
Delivery Locations
1
Delivery Cities
Raigad
Delivery Pincodes
410210
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Avinash Sitaram Devalekar | 410210,NATIONAL INSTITUTE OF FASHION TECHNOLOGY, NIFT Campus Plot No. 15 Sector - 4, Kharghar Navi Mumbai - 410 210 | Raigad | Maharashtra | 410210 | 2 | 15 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
NELLORE, ANDHRA PRADESH
Nmdc Limited
DANTEWADA, CHHATTISGARH
Indian Army
BIKANER, RAJASTHAN
Indian Army
JABALPUR, MADHYA PRADESH
Indian Army
JAIPUR, RAJASTHAN
Tender Results
Loading results...
80 L Water Cooler
80 L Water Cooler
120 L Water Cooler
120 L Water Cooler
3 Ton Tower Air Conditioner
3 Ton Tower Air Conditioner
Electric Steam Iron table with machine
Electric Steam Iron table with machine
1.5 Ton Split Inverter Air Conditioner
1.5 Ton Split Inverter Air Conditioner
BLDC Ceiling Fan
BLDC Ceiling Fan
Water Purifier
Water Purifier
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | 80 L Water Cooler | 80 L Water Cooler | 2 | nos | purchase.mumbai | 15 | |
| 2 | 120 L Water Cooler | 120 L Water Cooler | 1 | no | purchase.mumbai | 15 | |
| 3 | 3 Ton Tower Air Conditioner | 3 Ton Tower Air Conditioner | 1 | no | purchase.mumbai | 15 | |
| 4 | Electric Steam Iron table with machine | Electric Steam Iron table with machine | 2 | nos | purchase.mumbai | 15 | |
| 5 | 1.5 Ton Split Inverter Air Conditioner | 1.5 Ton Split Inverter Air Conditioner | 10 | nos | purchase.mumbai | 15 | |
| 6 | BLDC Ceiling Fan | BLDC Ceiling Fan | 100 | nos | purchase.mumbai | 15 | |
| 7 | Water Purifier | Water Purifier | 3 | nos | purchase.mumbai | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Audited financial statements or CA certificate confirming turnover for last 3 years
OEM authorization / dealership certificate (for OEM products)
Technical bid documents demonstrating compliance with product categories
Proof of Indian office/after-sales service for imported items
Any statutory licenses or clearances required for installation
Experience certificates for similar supply and installation projects
Key insights about MAHARASHTRA tender market
Bidders must meet turnover criteria, provide audited financial statements or CA certificates, submit OEM authorization if required, and demonstrate Indian office presence for imported items. Include GST, PAN, and EMD documentation, plus technical bid detailing installation and training scope.
Required documents include GST certificate, PAN, three-year turnover proof with audited statements or CA certificate, OEM authorization, technical bid for product categories, and proof of Indian service office for imported items; submit EMD as specified and experience certificates for related projects.
Delivery follows the option clause allowing up to 25% quantity variation. The base delivery period can be extended using the formula: (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days.
The procurement covers 80 L Water Cooler, 120 L Water Cooler, 3 Ton Tower AC, 1.5 Ton Split Inverter AC, Electric Steam Iron Table with machine, BLDC Ceiling Fan, Water Purifier, with supply, installation, testing, commissioning, and operator training.
Both bidder and OEM must meet the minimum average annual turnover for the last three years; in bundling bids, the OEM of the highest bid value must satisfy turnover criteria; provide audited balance sheets or CA certificates as evidence.
Imported items are allowed only if the OEM or authorized seller maintains a registered Indian office to provide after-sales service; the Indian office must support installation, warranty, and maintenance per tender terms.
The bid price must include supply, installation, testing, commissioning, operator training, and any statutory clearances required; ensure all cost components are captured to avoid post-bid price adjustments.
Payment terms are not explicitly stated; bidders should seek clarification on milestone payments, advance, and final settlement upon acceptance after installation and commissioning; ensure alignment with tender terms and delivery milestones.
Rashtriya Chemicals And Fertilizers Limited (rcf)
📍 RAIGAD, MAHARASHTRA
Indian Army
📍 JODHPUR, RAJASTHAN
Indian Army
📍 RAJAURI, JAMMU & KASHMIR
Indian Army
📍 JHANSI, UTTAR PRADESH
Indian Army
📍 Rangareddi, TELANGANA
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS