Support Service of the Server per Annum,Standard Protection Licenses & Subscriptions for Server Far
National Aluminium Company Limited, Bhubaneswar
KHORDHA, ODISHA
Bid Publish Date
08-Jun-2026, 10:35 am
Bid End Date
29-Jun-2026, 11:00 am
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
This tender, issued by Hindustan Aeronautics Limited under the Department of Defence Production, seeks TRUECONF USER LICENCES 150 NOS coupled with an HA SERVER FOR 250 USERS. The contract covers supply and installation with delivery expected within 15-30 days after site readiness in Lucknow. The engagement is managed through GeM terms, with OEM/Authorized Supplier confirmation and a defined BoQ compliance/Technical Compliance matrix. The deal is structured for timely acceptance and a robust payment cycle, with LIQUIDATED DAMAGES and SLA alignment where applicable. The opportunity targets qualified vendors capable of delivering secure video conferencing software licenses alongside a scalable server solution per user capacity, under HAL’s procurement framework for defense production.
Key Term 1: Delivery within 15-30 days post site readiness; penalties for delay apply
Key Term 2: 100% payment within 30 days after acceptance via electronic transfer
Key Term 3: OEM authorization proof required; exclusive partner note for SST Infotech
100% payment within 30 days after receipt and acceptance; RTGS or equivalent electronic remittance
Supply and installation within 15-30 days of site readiness intimation by HAL-Lucknow
0.5% weekly LD, capped at 10% of contract value; SLA alignment may apply
OEM authorization or authorized supplier status with supporting documents
GSTIN and PAN card validity; EFT Mandate and Cancelled Cheque provided
Capability to deliver both software licences and server hardware within 30 days
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
TRUECONF USER LICENCES 150 NOS AND HA SERVER FOR 250 USERS
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
National Aluminium Company Limited, Bhubaneswar
KHORDHA, ODISHA
Indian Space Research Organization
HYDERABAD, TELANGANA
Hindustan Petroleum Corporation Ltd
VISAKHAPATNAM, ANDHRA PRADESH
Damodar Valley Corporation
HOWRAH, WEST BENGAL
Mahatma Gandhi Institute of Medical Sciences
WARDHA, MAHARASHTRA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
Certificate (Requested in ATC)
Additional Doc 1 (Requested in ATC)
Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Bidders must submit OEM authorization proof, PAN, GSTIN, cancelled cheque, and EFT mandate with the bid. Include the Technical Compliance Matrix and BoQ compliance sheet. Ensure delivery capability for 150 user licences and a 250-user HA server within 15-30 days after site readiness.
Required documents include PAN, GSTIN, canceled cheque, EFT mandate, OEM authorization proof, Technical Compliance Matrix, and BoQ compliance sheet. Ensure GST details align with actuals and provide vendor code readiness as per GeM ATC clauses.
Delivery and installation must occur within 15-30 days after site readiness notification. Penalties apply at 0.5% per week of delay, capped at 10% of contract value, and SLA terms may govern service performance.
The contract provides 100% payment within 30 days after receipt and acceptance of the goods, via RTGS or another electronic remittance method, subject to HAL verification.
The ATC notes SST Infotech Private Limited as an Authorized partner of the OEM M/s Joint Stock Company 'TCS'. Bidders must confirm this status and attach supporting documentation.
Late delivery incurs 0.5% per week of the delayed period, up to a maximum of 10% of the contract value. SLA applicability will determine any additional penalties.
Suppliers must demonstrate OEM authorization, provide financial and compliance documents (PAN, GSTIN, EFT mandate), and confirm ability to supply 150 licences plus a 250-user server within the required 30-day window.
The installation is planned for HAL-Lucknow, with site readiness notification triggering the 15-30 day delivery window and on-site deployment.
N/a
Andhra Pradesh Grameena Bank
📍 GUNTUR, ANDHRA PRADESH
Indian Army
📍 ALLAHABAD, UTTAR PRADESH
Chennai Petroleum Corporation Limited
📍 TIRUVALLUR, TAMIL NADU
Ans,finance,hr,engineering,tech,ops,commercial,general Store,it
📍 CENTRAL DELHI, DELHI
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS