SUPPLY OF CC TYPE GAS SENSORS,SUPPLY OF GAS TRANSMITTER,SUPPLY OF SENSOR MOUNTING STAND,SUPPLY OF F
Hindustan Petroleum Corporation Ltd
BARDHAMAN, WEST BENGAL
Bid Publish Date
03-Jul-2026, 9:17 pm
Bid End Date
18-Jul-2026, 3:00 pm
EMD
₹16,400
Location
Progress
Quantity
804
Category
SUPPLY OF CC TYPE GAS SENSORS
Bid Type
Two Packet Bid
Hindustan Petroleum Corporation Ltd (HPCL) invites bids for a broad range of S UPPLY ITEMS and services under a single procurement in Unnao, Uttar Pradesh 209206. The scope covers CC type gas sensors, gas transmitters, sensor mounting stands, FLP components (hooter, on/off switch, 4‑way junction box), MIMIC repeater panel, modified GMS software, modified CIU card, cable glands, FRLS copper cable, GI cable trays with cover, and installation, testing and commissioning of the GMS system. The estimated contract quantity is variable up to 25% of the bid quantity, with delivery timelines linked to the last date of the original delivery order. The Goods and Services are organized under a 13-item BOQ with an overall procurement objective and flexible ordering terms.
25% quantity variation allowed during contract and currency
Delivery period anchored to last date of original order
Extension of delivery time using the prescribed formula with a 30-day minimum
EMD ₹16,400; GST/PAN and experience documentation required
ATC/ATD terms uploaded; comply with submission and OEM requirements
Payment terms are not explicitly stated in the data; bidders should rely on HPCL ATC terms and ensure alignment with standard government procurement payments and vendor terms.
Delivery period starts from the last date of the original delivery order; optional extension per option clause with minimum 30 days when increasing quantity.
No explicit LD details provided in tender data; verify at ATC/contract stage for penalties on delays or non-conformance.
Proven experience in supplying/installing gas sensors and GMS related components
Financially sound with audited statements covering prior 2-3 years
GST registration and PAN included in submission; OEM authorizations where required
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SUPPLY OF CC TYPE GAS SENSORS , SUPPLY OF GAS TRANSMITTER , SUPPLY OF SENSOR MOUNTING STAND , SUPPLY OF FLP HOOTER , SUPPLY OF FLP ON OFF SWITCH , SUPPLY OF FOURWAY FLP JUCTION BOX , SUPPLY OF MIMIC REPEATER PANEL , SUPPLY OF MODIFIED GMS SOFTWARE , SUPPLY OF MODIFIED CIU CARD , SUPPLY OF THREE QUARTERS INCH ET CABLE GLAND FLP , SUPPLY OF 3CORE X 1point5 SQMM FRLS COPPER CABLE , Cable tray 50mm GI with Cover , INSTALLATION TESTING AND COMISSIONING GMS SYSTEM
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
15
Payment Timelines
Payments shall be made to the Seller within 15 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
65
Delivery Locations
1
Delivery Cities
Unnao
Delivery Pincodes
209801
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Aakarsh Kumar Dubey | 209801,HPCL Unnao LPG Plant, site 2nd Road no.-13, UPSIDC Industrial Area, Unnao-209801. | Unnao | Uttar Pradesh | 209801 | 13 | 65 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Petroleum Corporation Ltd
BARDHAMAN, WEST BENGAL
Bharat Petroleum Corporation Ltd
DEORIA, UTTAR PRADESH
Hindustan Petroleum Corporation Ltd
KOKRAJHAR, ASSAM
Hindustan Petroleum Corporation Ltd
PUNE, MAHARASHTRA
Marketing Division
MUMBAI, MAHARASHTRA
Tender Results
Loading results...
SUPPLY OF CC TYPE GAS SENSORS
SUPPLY OF CC TYPE GAS SENSORS
SUPPLY OF GAS TRANSMITTER
SUPPLY OF GAS TRANSMITTER
SUPPLY OF SENSOR MOUNTING STAND
SUPPLY OF SENSOR MOUNTING STAND
SUPPLY OF FLP HOOTER
SUPPLY OF FLP HOOTER
SUPPLY OF FLP ON OFF SWITCH
SUPPLY OF FLP ON OFF SWITCH
SUPPLY OF FOURWAY FLP JUCTION BOX
SUPPLY OF FOURWAY FLP JUCTION BOX
SUPPLY OF MIMIC REPEATER PANEL
SUPPLY OF MIMIC REPEATER PANEL
SUPPLY OF MODIFIED GMS SOFTWARE
SUPPLY OF MODIFIED GMS SOFTWARE
SUPPLY OF MODIFIED CIU CARD
SUPPLY OF MODIFIED CIU CARD
SUPPLY OF THREE QUARTERS INCH ET CABLE GLAND FLP
SUPPLY OF THREE QUARTERS INCH ET CABLE GLAND FLP
SUPPLY OF 3CORE X 1point5 SQMM FRLS COPPER CABLE
SUPPLY OF 3CORE X 1point5 SQMM FRLS COPPER CABLE
Cable tray 50mm GI with Cover
Cable tray 50mm GI with Cover
INSTALLATION TESTING AND COMISSIONING GMS SYSTEM
INSTALLATION TESTING AND COMISSIONING GMS SYSTEM
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SUPPLY OF CC TYPE GAS SENSORS | SUPPLY OF CC TYPE GAS SENSORS | 13 | each | mangleshkumar | 65 | |
| 2 | SUPPLY OF GAS TRANSMITTER | SUPPLY OF GAS TRANSMITTER | 13 | each | mangleshkumar | 65 | |
| 3 | SUPPLY OF SENSOR MOUNTING STAND | SUPPLY OF SENSOR MOUNTING STAND | 13 | each | mangleshkumar | 65 | |
| 4 | SUPPLY OF FLP HOOTER | SUPPLY OF FLP HOOTER | 2 | each | mangleshkumar | 65 | |
| 5 | SUPPLY OF FLP ON OFF SWITCH | SUPPLY OF FLP ON OFF SWITCH | 4 | each | mangleshkumar | 65 | |
| 6 | SUPPLY OF FOURWAY FLP JUCTION BOX | SUPPLY OF FOURWAY FLP JUCTION BOX | 5 | each | mangleshkumar | 65 | |
| 7 | SUPPLY OF MIMIC REPEATER PANEL | SUPPLY OF MIMIC REPEATER PANEL | 1 | each | mangleshkumar | 65 | |
| 8 | SUPPLY OF MODIFIED GMS SOFTWARE | SUPPLY OF MODIFIED GMS SOFTWARE | 1 | lump sum | mangleshkumar | 65 | |
| 9 | SUPPLY OF MODIFIED CIU CARD | SUPPLY OF MODIFIED CIU CARD | 1 | each | mangleshkumar | 65 | |
| 10 | SUPPLY OF THREE QUARTERS INCH ET CABLE GLAND FLP | SUPPLY OF THREE QUARTERS INCH ET CABLE GLAND FLP | 50 | each | mangleshkumar | 65 | |
| 11 | SUPPLY OF 3CORE X 1point5 SQMM FRLS COPPER CABLE | SUPPLY OF 3CORE X 1point5 SQMM FRLS COPPER CABLE | 650 | meter | mangleshkumar | 65 | |
| 12 | Cable tray 50mm GI with Cover | Cable tray 50mm GI with Cover | 50 | meetr | mangleshkumar | 65 | |
| 13 | INSTALLATION TESTING AND COMISSIONING GMS SYSTEM | INSTALLATION TESTING AND COMISSIONING GMS SYSTEM | 1 | lump sum | mangleshkumar | 65 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar supply/installations
Financial statements (audited preferably)
EMD submission proof (₹16,400)
Technical bid documents and compliance certificates
OEM authorization letters (where applicable)
Any ATC-specific forms uploaded by HPCL
Extended Deadline
18-Jul-2026, 3:00 pm
Opening Date
18-Jul-2026, 3:30 pm
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financial statements, and EMD ₹16,400 along with technical compliance and OEM authorizations. Ensure ATC documents are reviewed and comply with 13-item BOQ scope including installation and commissioning of GMS system in Unnao, Uttar Pradesh.
Required documents include GST registration, PAN card, experience certificates for similar work, audited financial statements, EMD submission proof, technical bid documents, OEM authorizations if applicable, and any ATC forms uploaded by HPCL for this procurement.
Delivery begins after the original delivery order; an option clause allows up to 25% quantity variation. If quantity increases, extended delivery time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.
The EMD amount is ₹16,400. Submit proof of payment alongside bid; ensure alignment with HPCL ATC for EMD submission format and validity period during bid evaluation.
BoQ includes CC type gas sensors, gas transmitters, sensor mounting stands, FLP hooter, FLP on/off switch, four‑way FLP junction box, MIMIC repeater panel, modified GMS software, modified CIU card, 3/4 inch ET cable glands, 3 core X 1.5 sqmm FRLS copper cable, 50 mm GI cable tray with cover, and installation/commissioning services.
The tender data does not specify strict standards; bidders should rely on OEM certifications and ATC guidance, ensuring compliance with local electrical/automation norms and any HPCL-specified standards in the final contract.
The scope explicitly includes installation, testing, and commissioning of the GMS system in Unnao, with the listed components and cables. Ensure a site-ready installation plan, qualified technicians, and post-installation verification per HPCL ATC requirements.
Office Of Dg (mss)
📍 HYDERABAD, TELANGANA
Indian Coast Guard
📍 MUMBAI, MAHARASHTRA
Indian Army
Western Coalfields Limited
📍 CHANDRAPUR, MAHARASHTRA
Indian Army
📍 JAMMU, JAMMU & KASHMIR
Sign up now to access all documents
Main Document
BOQ
BOQ
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS