Indian Air Force Spike Barrier (V2) Tender Chandigarh 2025 – IS0 9001 Certified, 2 Year Warranty, 16740 EMD
Indian Air Force
CHANDIGARH, CHANDIGARH
Progress
Quantity
2
Bid Type
Two Packet Bid
The Indian Army under the Department of Military Affairs invites bids for a Spike Barrier (V2) in a Q3 category, targeting robust security barrier systems. The tender uses a modest EMD of ₹25,200 and requires Detailed Design Drawings approval within 5 days of award, with potential 25% quantity variations at contracted rates. Bidder must meet OEM participation norms for imported products, and provide bank-compliant EFT mandates and GST/PAN documentation. Location is nationwide within India, emphasizing high-torque DC motor reliability, fail-safe limit switches, and emergency lowering features. Unique clauses include option-based delivery adjustments and mandatory post-award design approvals prior to fabrication.
Spike Barrier system with drive mechanism and mounting arrangements
Material & Finish: specified spike material, base barrier material, surface finish, reflective tape on body and spike
Design: opening/closing time (adjustable in seconds), blocking angle, high-torque DC motor, external limit switches, emergency lowering
Electrical: power supply details (NA for manual), power consumption (NA for manual)
Dimensions: system length (m), system width (mm), spike height (mm), spike thickness (mm), inter-spike gap (mm), load capacity (tonnes)
Warranty: Spike Barrier and Motor warranty terms; testing requirement with NABL/ILAC/central govt lab report
EMD of ₹25,200; must be submitted with bid and validated
Quantity may vary up to ±25%; delivery terms adjust accordingly
5-day window for Detailed Design Drawings approval post-award
EMD submission via DD/online; payment terms to be defined in contract and aligned to approved drawings
Delivery period linked to final approved drawings; potential extension with no liquidated damages for buyer-approved delays
Demurrage at 0.5% of contract value per day for non-lift within 48 hours; destruction if not lifted within one month
Registered Indian office or authorized distributor for imported Spike Barrier products
Evidence of experience in supplying security barrier systems or equivalent mechanical assemblies
GST registration, PAN, and financial capability documentation as per tender terms
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
Spike Barrier (V2) (Q3)
Advisory Bank
State Bank of India
ePBG Percentage
3%
ePBG Duration (Months)
12
Max Delivery Days
30
Delivery Locations
1
Delivery Cities
Ambala
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Ambala | Ambala | - | - | 2 | 30 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Air Force
CHANDIGARH, CHANDIGARH
Indian Air Force
BANGALORE, KARNATAKA
Indian Army
Indian Air Force
HYDERABAD, TELANGANA
Indian Air Force
CACHAR, ASSAM
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Generic | Drive/Mechanism of Spike | Electro-Mechanical |
| Generic | Mounting arrangement | Surface Mount |
| Generic | Mounting Type | Fixed |
| Material & Finish | Material of Spike | Carbon Steel, Stainless Steel, Mild Steel Or higher |
| Material & Finish | Material of base barrier | Carbon Steel, Mild Steel Or higher |
| Material & Finish | Surface Finish | Colour Coated |
| Colour | Colour of Barrier Hump | Yellow and Black |
| Colour | Colour of Spike | Red |
| Design | Opening /Closing Time(Adjustable) (Sec) | 1-3 Or higher |
| Design | Blocking Angle (degree) | 45 |
| Design | High-torque DC motor for greater reliability | Yes Or higher |
| Design | Motor Provided | Yes |
| Design | External limit switches to provide a fail safe operation | Yes |
| Design | Emergency lowering or up possible in case of threat or fire | Yes |
| Design | Electronic force can be adjusted through programming levels | Yes |
| Design | Reflective Tape Provided on Body | Yes |
| Design | Reflective Tape Provided on Spike | Yes |
| Dimension | System Length(in meter) | 6.0 |
| Dimension | System Width (in mm) | 450-500 |
| Dimension | Spike Height above ground (in mm) | 131-150 |
| Dimension | Spike Thickness(in mm) | 10 |
| Dimension | Gap between the spike(in mm) | 80-100 |
| Dimension | Load Capacity (in Tonnes) | 50-54, 55-65, 66-76, 77-87, 88-100 Or higher |
| Power | Power Supply (NA incase of manual) | 230V |
| Power | Power Consumption(in Watt) (NA incase of manual) | 350 |
| Warranty | Warranty of Spike Barrier (Years) | 1, 2, 3, 4 Or higher |
| Warranty | Warranty of Motor (Years) | 1, 2, 3, 4 Or higher |
| Test Report | Availability of Test Report from Central Govt/NABL/ILAC accredited lab to prove confirmity to specification | No |
Discover companies most likely to bid on this tender
PAN Card copy
GSTIN copy
Cancelled Cheque copy
EFT Mandate certified by Bank
OEM authorization (for imported products)
Detailed Design Drawings (within 5 days of award) and approvals
Test report from Central Govt/NABL/ILAC accredited lab (conformity to specifications)
Bidder Code creation documents (per buyer terms)
Key insights about HARYANA tender market
Bidders must submit PAN, GST, cancelled cheque and EFT mandate, plus EMD of ₹25,200. Include OEM authorizations for imported items, and Detailed Design Drawings within 5 days of award. Ensure NABL/ILAC-compliant test reports and reflectors on body/spike as specified.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, OEM authorization for imports, EMD proof of ₹25,200, and Detailed Design Drawings approval within 5 days of contract award, plus lab test reports confirming conformity.
Key specs include drive mechanism, mounting arrangement, spike/base material, surface finish, reflective tape on body and spike, adjustable opening time, blocking angle, high-torque DC motor, external limit switches, emergency lowering capability, and test report from NABL/ILAC-lab.
The Earnest Money Deposit required is ₹25,200. It can be submitted via Demand Draft to REGT FUND ACCT, State Bank of India, with scanned proof uploaded and hardcopy delivered within 5 days post bid end.
The purchaser may increase/decrease quantity up to 25% at contract, with extended delivery time calculated as (additional/original quantity) × original delivery period, minimum 30 days, and no LD during drawing approval delays.
A Test Report from Central Govt/NABL/ILAC-accredited lab proving conformity to the specification is required, ensuring IS and material standards are met for both spike and base components.
Within 5 days of award, submit Detailed Design Drawings for Buyer approval; buyer responds with approval or modification list within 5 days; fabrication proceeds per approved drawings.
Indian Air Force
📍 WEST DELHI, DELHI
Power Grid Corporation Of India Limited
📍 ANGUL, ODISHA
Indian Army
📍 DIMAPUR, NAGALAND
E-nagar Palika Government Of Madhya Pradesh
📍 UMARIA, MADHYA PRADESH
Indian Army
📍 KAPURTHALA, PUNJAB
Sign up now to access all documents
Main Document
CATALOG Specification
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS