Satara District Panchayats Solar Power Roof-Top ONGRID Single Phase Tender 2025
Satara District Panchayats
SATARA, MAHARASHTRA
Bid Publish Date
27-Jun-2026, 5:06 pm
Bid End Date
11-Jul-2026, 9:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
Rural Development and Panchayat Raj Department, Maharashtra seeks a Roof Top Solar Power Plant (OnGrid, Single Phase) for installation at Chandrapur 441205. The scope covers PV array mounting, grid-tied SPV system components, and inverter with specified KW output, MPPTs, input ports, ingress protection, and display type. Estimated value and quantities are not disclosed; delivery and commissioning occur at the consignees’ location. A key differentiator is mandatory ISO 9001 certification and a robust service support escalation matrix. This tender emphasizes field installation capability, quality control through a buyer lab, and adherence to material test certificates as part of acceptance criteria.
Roof Top OnGrid SPV system for Chandrapur, Maharashtra
Inverter: rated KW output, MPPTs, input ports (1 +ve, 1 -ve), IP rating
PV array mounting and grid-tied configuration
Display type on inverter
Material Test Certificate accompanying supply
ISO 9001 certification for bidder or OEM
EMD not specified in data; ensure compliance with bid document
Turnover criteria: last 3 financial years; audited or CA certified
ISO 9001 certification mandatory for bidder or OEM
Material Test Certificate to be supplied with goods
Dedicated service support with toll-free number and escalation matrix
Not specified in data; refer to bid document ATC for terms and any advance or milestone payments
Delivery and installation at consignees’ location as per location specified in ATC; no explicit dates provided
Not specified in data; LD provisions typically per ATC; verify in corrigendum
Valid GST registration and PAN
ISO 9001 certification for bidder or OEM
Turnover as per last 3 financial years with audited statements
No ongoing liquidation or bankruptcy proceedings
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
Solar Power Plant (Roof Top) for ONGRID System, Single Phase (Q3)
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
45
Delivery Locations
1
Delivery Cities
Chandrapur
Delivery Pincodes
441206
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Suresh Shriram Dunedar | 441206,at post panchayat samiti bramhapuri dist chandrapur | Chandrapur | Maharashtra | 441206 | 1 | 45 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Satara District Panchayats
SATARA, MAHARASHTRA
Satara District Panchayats
SATARA, MAHARASHTRA
Kolhapur District Panchayats
KOLHAPUR, MAHARASHTRA
Pune District Panchayats
PUNE, MAHARASHTRA
Block Development Office
NAGPUR, MAHARASHTRA
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | A Grid Tied Photo Voltaic (SPV) power plant consists of | SPV array, Module Mounting Structure, Power Conditioning Unit (PCU) consisting of Maximum Power Point Tracker (MPPT), Inverter, and Controls and Protections, interconnect cables and switches |
| GENERIC | PV Array Mounting | Mounted on a suitable structure |
| GENERIC | Grid Tied SPV System | Without battery and designed with necessary features to supplement the grid power during day time. |
| INVERTER | Rated output power of inverter (in KW) | 2 |
| INVERTER | Switching device | IGBT |
| INVERTER | Number of Phase | 1 |
| INVERTER | Number of MPPT per inverter | 1 |
| INVERTER | Number of string at input side of inverter ( input port +ve and -ve) ( hint: 1 sets contains 1 +ve and 1 -ve port) | 1 set |
| INVERTER | Service condition | Outdoor |
| INVERTER | Ingress protection rating of inverter | IP 65 (for outdoor use) |
| INVERTER OUTPUT | Overall Efficiency (in %) | >96 |
| DISPLAY FEATURES ON INVERTER | Type of display | LED |
Discover companies most likely to bid on this tender
GST registration
PAN card
Audited financial statements for last 3 years or CA certificate for turnover
ISO 9001 certificate (bidder or OEM)
Material Test Certificates for supplied items
Dedicated toll-free service contact details and escalation matrix
OEM authorization if applicable
Any certificates required by ATC or corrigendum
Extended Deadline
11-Jul-2026, 9:00 pm
Opening Date
11-Jul-2026, 9:30 pm
Key insights about MAHARASHTRA tender market
Bidders must meet turnover and certification criteria, upload ISO 9001, GST, PAN, and Material Test Certificates, and provide a dedicated service support contact with escalation details. Ensure all documents align with ATC and corrigenda; submission follows the standard e-procurement portal process.
Submit GST certificate, PAN, three-year turnover proofs (audited statements or CA certificate), ISO 9001 certificate, Material Test Certificate, OEM authorization if applicable, and service support details. Ensure all documents are current and match bidder/OEM references and the tender terms.
The inverter must specify rated KW output, MPPT count per unit, input port count (1 positive, 1 negative), service condition, and IP rating. The display type on the inverter must be clearly described, with performance aligned to grid-tied ongrid SPV requirements.
Delivery and installation occur at the consignees’ location as per the ATC. No explicit calendar dates are provided in the tender copy; bidders should monitor portal updates or corrigenda for final delivery timelines and installation milestones.
Material Test Certificates must accompany the supply; the buyer’s laboratory testing results will be the sole acceptance criterion. Ensure certificates specify material grade, test methods, and conformity to applicable standards prior to shipment.
Bidders or OEMs must hold ISO 9001 certification; the certificate must cover the offered products. Upload the valid certificate with bid, and ensure scope includes solar PV equipment manufacturing or supply as applicable, aligning with quality management requirements.
Incomplete documentation leads to bid rejection per ATC; ensure all mandatory documents (GST, PAN, turnover proofs, ISO 9001, Material Test Certificates, service contact details) are uploaded, and verify consistency with bid references and corrigenda before submission.
Solapur District Panchayats
📍 SOLAPUR, MAHARASHTRA
Latur District Panchayats
📍 LATUR, MAHARASHTRA
Pune District Panchayats
📍 PUNE, MAHARASHTRA
N/a
📍 OSMANABAD, MAHARASHTRA
Pune District Panchayats
📍 PUNE, MAHARASHTRA
Sign up now to access all documents
Main Document
GEM_CATEGORY_SPECIFICATION
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS