Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - GOKUL OPENCAST MIN
Western Coalfields Limited
NAGPUR, MAHARASHTRA
Bid Publish Date
11-Jul-2026, 2:41 pm
Bid End Date
21-Jul-2026, 3:00 pm
Value
₹58,882
Location
Progress
Quantity
1
Bid Type
Single Packet Bid
Western Coalfields Limited invites bids for repairing the H-frame assembly of a BE300LC hydraulic excavator (S/N 16102) at Gokul OCM, Nagpur, Maharashtra. Scope covers surface cleaning, gouging, rebuilding with stainless electrodes, and hard-facing of cracks. The project specifies a 5-day delivery after site handover, with 85% payment within 45 days of bill submission and 15% after warranty completion. Late delivery incurs a 0.5% weekly penalty up to 10%. A 6 months / 1000 hours warranty applies post-repair. ALR at 20% below departmentally estimated cost applies. Transportation is contractor’s responsibility.
ALR bid condition: bids <= 20% below departmentally estimated cost
Payment schedule: 85% within 45 days; 15% after warranty completion + 15% final after warranty
Warranty period: 6 months / 1000 hours with repair-at-contractor-cost obligation
85% payment within 45 days after submission of bills; 15% after warranty completion; final 15% after warranty period.
5 days delivery after handover of site by Engineer In-Charge at Gokul OCM; contractor responsible for transportation.
Late delivery attracts 0.5% per week, capped at 10% of contract value; deductions per company rules.
Experience in repairing heavy hydraulic excavators, preferably BE300LC or equivalent
Demonstrated capability to conduct on-site repairs at mining locations
Compliance with GST, tax documentation, and proper billing procedures
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Repair, Maintenance, and Installation of Plant/ Systems/Equipments (Version 2) - GOKUL OPENCAST MINES, UMRER AREA (WCL); DOZER MAKE: BEML, MODEL:BD155; Buyer
Payment Timelines
Payments shall be made to the Seller within 45 days of issue of service delivery acceptance certificate (SDAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Delivery Locations
1
Delivery Cities
Nagpur
Delivery Pincodes
441204
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Abhinav Garg | 441204,Regional Stores, WCL P.O. Umrer Project Dist. Nagpur M.S. Pin 441204 | Nagpur | Maharashtra | 441204 | Project / Lumpsum Based | - | Estimated Cost of Spare/Consumable s/Items on Reimbursement basis in Rs (please input 0 if not applicable) : 0 |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS
Western Coalfields Limited
NAGPUR, MAHARASHTRA
Western Coalfields Limited
NAGPUR, MAHARASHTRA
Western Coalfields Limited
NAGPUR, MAHARASHTRA
Western Coalfields Limited
NAGPUR, MAHARASHTRA
Eastern Coalfields Limited
GODDA, JHARKHAND
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar hydraulic excavator repairs
Financial statements or turnover proof as required by terms
EMD/Security deposit documentation (if applicable by policy)
Technical bid documents and method/quality plan for H-frame repair
OEM authorizations or certifications for BE300LC components (if required)
Key insights about MAHARASHTRA tender market
Bidders must submit GST registration, PAN, experience certificates, financials, EMD documentation (if applicable), and a detailed technical plan for H-frame repair. Ensure compliance with 6-month/1000-hour warranty and ALR price guidelines; follow delivery, billing, and supplier transport terms for Gokul OCM.
Required documents include GST certificate, PAN card, experience certificates for heavy machinery repair, financial statements, triplicate tax invoices, OEM authorizations if needed, and a methodology addressing surface cleaning, gouging, rebuilding, and hard-facing per SOW.
Scope involves surface cleaning, gouging with reputed electrodes (consumables provided by repairer), rebuilding with stainless electrodes, and hard-facing with reputed electrodes. No BOQ items are listed; emphasis on repair quality, inspection by Engineer In-Charge, and warranty compliance.
Delivery is required within 5 days after handover of the site by the Engineer In-Charge at Gokul OCM. Contractors must arrange transportation and ensure timely inspection prior to payment milestones.
Payment terms specify 85% within 45 days after bill submission; 15% after warranty completion; final 15% after warranty period. Taxes are claimed separately under GST; bills must be submitted in triplicate to the Sub Area office.
Contractors provide 6 months / 1000 hours warranty from final repair day; defects due to non-conformance are rectified at contractor cost. Late delivery incurs 0.5% per week late fees, up to a maximum 10% of contract value.
Yes, bidders must comply with the Abnormally Low Rates (ALR) policy at 20% below departmentally estimated cost; bids falling outside may be rejected or reviewed under internal guidelines to protect project viability.
Western Coalfields Limited
📍 NAGPUR, MAHARASHTRA
Western Coalfields Limited
📍 NAGPUR, MAHARASHTRA
Rashtriya Chemicals And Fertilizers Limited (rcf)
📍 RAIGAD, MAHARASHTRA
Odisha Power Generation Corporation Limited
📍 JHARSUGUDA, ODISHA
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 JHANSI, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
GEM_GENERAL_TERMS_AND_CONDITIONS