Custom Bid for Services - Cleaning Work
N/a
BAGPAT, UTTAR PRADESH
Bid Publish Date
20-Jun-2026, 7:27 pm
Bid End Date
06-Jul-2026, 8:00 pm
Location
Progress
Quantity
1
Bid Type
Two Packet Bid
The procurement is issued by the Uttar Pradesh Cooperative Sugar Factories Federation Limited for a Boiler Refactory Job Work under a Custom Bid for Services in BUDAUN, Uttar Pradesh (202421). The scope is described as boiler refactory services, with no BoQ items published and no estimated value disclosed. The opportunity targets vendors capable of performing specialized boiler refurbishment activities within the sugar industry context. Key differentiators include location-specific execution in BUDAUN and the absence of a defined itemized schedule, signaling a flexible, work-for-hire approach. The tender emphasizes sectoral expertise in boiler refurbishment without publicly listed delivery milestones or quantities, making supplier capability and compliance crucial for bid advancement. The ATC terms were uploaded by the buyer to govern tender participation and conditions.
Product/Service: Boiler refactory work for sugar factory facilities
Location: BUDAUN, Uttar Pradesh 202421
BOQ: Not published; no itemized quantities
Estimated value: Not disclosed
Experience: Demonstrated boiler refactory capability required
Standards/Certification: Not specified in data; ATC governs compliance
EMD and exact financial terms are not disclosed; bidders must consult ATC
Delivery timelines to be defined in ATC; verify project schedule with buyer
Documentation must include GST, PAN, experience, and OEM authorizations as applicable
Not specified in available data; ATC to govern terms and milestones
Not specified; ATC terms will define start and completion timelines
Not disclosed; refer to ATC for any LD provisions or performance bonds
Demonstrated boiler refactory capabilities through prior projects
Compliance with GST and PAN requirements and related financial proofs
Adequate evidence of technical competence via experience certificates
Tender Category
Service
Bid To RA
No
Bid To RA Enabled
No
Item Category
Custom Bid for Services - Work for Boiler Refactory Job Work
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
BAGPAT, UTTAR PRADESH
Office Of Dg (aero)
KANPUR NAGAR, UTTAR PRADESH
N/a
BULANDSHAHR, UTTAR PRADESH
Hindustan Organic Chemicals Limited
ERNAKULAM, KERALA
Salem Steel Plant
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates (boiler refactory or similar maintenance)
Financial statements (audited/un-audited as permitted)
EMD/Security deposit documentation (as per ATC guidance)
Technical bid documents demonstrating capability for boiler refurbishment
OEM authorizations (if OEM-specified equipment is used)
Key insights about UTTAR PRADESH tender market
Bidders should review the ATC document uploaded by the buyer, compile GST and PAN, gather experience certificates for boiler refactory work, assemble financial statements, and prepare technical bid documents demonstrating past performance. Verify site specifics in BUDAUN 202421 and submit as per ATC deadlines.
Required submissions typically include GST registration, PAN, experience certificates for boiler refurbishment, financial statements, EMD documents, technical compliance records, and OEM authorizations if OEM-specified equipment is used. Ensure ATC guidelines are followed for format and submission method.
Specific technical specs are not published; bidders must rely on ATC terms. Demonstrate capability in boiler refurbishment, including inspection, refractory layup, welding, and integration with sugar factory systems, with site-specific execution in BUDAUN under UP4211 regulations.
Exact deadline is defined in the ATC document uploaded by the buyer. Bidders should monitor the ATC for submission dates, prepare a complete bid with all required attachments, and ensure timely electronic or physical submission as directed.
EMD details are not disclosed in the public data; bidders must consult the ATC terms for the exact security amount, acceptable payment method, and submission timeline to avoid disqualification.
Provide evidence of prior boiler refactory or related maintenance projects, include experience certificates, demonstrate financial stability via statements, and ensure GST/PAN compliance. OEM authorizations may strengthen eligibility depending on equipment used.
N/a
📍 BAHRAICH, UTTAR PRADESH
N/a
📍 SHAHJAHANPUR, UTTAR PRADESH
N/a
📍 BAHRAICH, UTTAR PRADESH
N/a
📍 AZAMGARH, UTTAR PRADESH
N/a
📍 BAGPAT, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
SCOPE_OF_WORK
PAYMENT
OTHER
BOQ
OTHER
OTHER
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS