TenderDekho Logo
GEM

Indian Army Dust Proofing Matting Tender SQM - Department of Military Affairs, 2026 (Dust Proofing Matting)

Bid Publish Date

30-May-2026, 3:52 pm

Bid End Date

09-Jun-2026, 4:00 pm

Progress

Issue30-May-2026, 3:52 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

60

Bid Type

Two Packet Bid

Key Highlights

  • Dust Proofing Matting (SQM) procurement for Indian Army by Department Of Military Affairs
  • Quantity flexibility: +/- 25% during and after original delivery period
  • 1-year warranty with on-site OEM support; service centers across INDIA
  • 3-day service/rectification timeframe; 0.5% weekly penalty for delays
  • Penalty cap: 10% of total contract value; PBG adjustments allowed
  • GST advised by bidder; GST reimbursement as actuals or lower applicable rate

Categories 4

Tender Overview

The opportunity is with the Indian Army under the Department Of Military Affairs for procuring Dust Proofing Matting (SQM). While the tender data lists no explicit quantity or BOQ items, the Buyer Added Terms authorize a ±25% quantity variance and a flexible delivery window tied to the original delivery period. A 1-year OEM warranty is required, with service centers across India and post-installation support. The scope emphasizes reliable mats suitable for dust control in military environments, with adherence to post-sale service commitments and timely rectification during the warranty period. This procurement focuses on standardization, installation readiness, and vendor readiness for rapid deployment across consignee locations. The unique clause emphasizing extended delivery time proportional to quantity changes and the requirement to upload service-capable centers distinguishes this tender from typical supply-only bids.

Technical Specifications & Requirements

  • Product: Dust Proofing Matting (SQM) for Indian Army deployment
  • Standards/Certifications: Not specified in data; bidders should confirm compatibility with military-use mats and installation requirements
  • Delivery/Installation: Delivery terms permit up to 25% quantity variation; delivery period begins after the original delivery order’s last date
  • Warranty/After-Sales: 1 year warranty from final acceptance or commissioning; OEM warranty certificates required at delivery
  • Support: Must have established service network in India; timing for service/rectification within 3 days; penalties of 0.5% of unit price per week of delay; cumulative penalties capped at 10% of total contract value
  • Pricing/GST: GST advised to be checked by bidder; GST reimbursement as actual or applicable rate; quoted GST applies
  • Documentation: Upload all required certificates and documents per ATC/Corrigendum; ensure submission of OEM authorizations and service-center details

Terms, Conditions & Eligibility

  • EMD: Not specified in data; ensure bid documents include security as required by ATC
  • Warranty: 1 year warranty; post-sale service within 3 days; penalties for delays apply
  • Delivery: Quantity variation up to 25%; extended delivery period aligned with percentage change
  • Maintenance: Service centers required; submit location details
  • Documents: Required certificates and OEM authorizations; GST/PAN/experience documents typical for Army tenders; upload all demanded items
  • Penalty/Performance: Cumulative penalties up to 10% of contract value; PBG may be invoked for penalties
  • GST/Tax: Bidder bears GST; reimbursement per actuals or applicable rate (whichever is lower)

Key Specifications

  • Product/service: Dust Proofing Matting (SQM)

  • Estimated quantity: not specified; subject to ±25% variation

  • Warranty: 1 year from final acceptance or commissioning

  • Delivery: extended period proportional to quantity changes (minimum 30 days)

  • Service requirement: response/rectification within 3 days; India-based service network

  • Penalties: 0.5% of unit price per week of delay; capped at 10% of total contract value

Terms & Conditions

  • Quantity variation up to 25% with proportional delivery time calculations

  • 1-year OEM warranty and 3-day fault rectification window

  • Penalty regime for delays and requirement to upload service-center details

Important Clauses

Payment Terms

GST payable by bidder; reimbursement as actuals or applicable rate; no commitment on GST amount by purchaser

Delivery Schedule

Delivery starts from last date of original delivery order; extended period applies with increased quantity; minimum 30 days

Penalties/Liquidated Damages

0.5% unit price per week of delay; cumulative cap 10% of total contract value; penalties may be deducted from PBG

Bidder Eligibility

  • Experience in supplying dustproof mats or related flooring products to defense/military bodies

  • Demonstrated after-sales support capability with India-based service centers

  • Valid GST registration and PAN; compliant with KYC and financials as per terms

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Dust Proofing Matting (SQM)

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9399760.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Dust Proofing of Armr, TCM & Elect Sec

Indian Army

RAJAURI, JAMMU & KASHMIR

Posted: 3 February 2025
Closed: 24 February 2025
GEM

Dust Cover

Indian Air Force

LUCKNOW, UTTAR PRADESH

Posted: 19 December 2025
Closed: 9 January 2026
GEM

Indian Air Force Dust Collector Tender DMA 2025 – IAF Procurement with ATC Compliance and Stamp Upload

Indian Air Force

Posted: 5 December 2025
Closed: 15 December 2025
GEM

DUST PROTECTION COVER

Indian Air Force

Posted: 5 December 2024
Closed: 26 December 2024
GEM

dust pans

Bharat Heavy Electricals Limited (bhel)

Posted: 14 December 2024
Closed: 24 December 2024
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST certificate

2

PAN card

3

Experience certificates (similar mats or related products)

4

Financial statements (audited if available)

5

EMD submission documents as per ATC

6

Technical bid documents

7

OEM authorization / service-center details

8

Installation, commissioning & maintenance capability proof

Frequently Asked Questions

How to bid on the Indian Army dust proofing matting tender 2026 in India?

Submit complete bid documents including GST, PAN, experience certificates, financial statements, and OEM authorization. Ensure the 1-year warranty certificate and service-center details are included. Adhere to the 25% quantity variation clause and the delivery timeline linked to the original order.

What documents are required for the dust proofing matting procurement in 2026?

Required documents include GST certificate, PAN card, experience certificates for similar mats, audited financial statements, EMD documents as per ATC, OEM authorization, technical bid, installation and maintenance capability proof, and service-center locations across India.

What are the key warranty and after-sales terms for the matting bid?

A 1-year warranty from final acceptance or commissioning is required, with OEM warranty certificates supplied at delivery. Service centers must be established in India; defects must be rectified within 3 days; 0.5% weekly penalty for delays, up to a 10% total contract penalty.

What is the delivery time flexibility for quantity changes in this tender?

The purchaser may increase quantity up to 25% of contracted quantity during the currency of the contract. Delivery time adjusts proportionally as (increased quantity/original quantity) × original delivery period, with a minimum of 30 days.

Which standards or certifications are mandated for matting suppliers?

The tender data does not specify ISI/ISO standards; bidders must ensure compatibility with military-use mats and provide OEM warranties. Confirm installation suitability and service capability; verify any site-specific military requirements prior to submission.

How is GST handled in the dust proofing matting tender submission?

Bidders must determine GST applicability independently. GST reimbursement will be provided as actuals or at the lower applicable rate, limited to the quoted GST percentage, as per ATC guidance.

What evidence of after-sales support is required for tender submission?

Submit details of India-based service centers, installation/commissioning capabilities, and a dedicated maintenance team. Include timelines for service/rectification (within 3 days) and evidence of prior defense-sector service experience if available.

What are the penalties for delayed matting delivery and service?

Penalties are 0.5% of unit price for each week of delay, with a cumulative cap of 10% of total contract value. Penalties may be recovered from the performance security or paid directly to the buyer.

Similar Tenders

5 found
Urgent

Indian Army Dust Proofing HDPE Knitted Fabric for Vehicle Repair Bay Jaipur Rajasthan 2026 Tender

Indian Army

📍 JAIPUR, RAJASTHAN

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

ESD SAFE FLOOR MATTING FOR DRONE ELECTRONICS AND ELECTRICAL SEC

Indian Army

📍 Ajmer, RAJASTHAN

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

ANTI-STATIC SAFETY FLOOR MATTING FOR UAV ELECTRONICS HANDLING AREA

Indian Army

📍 Ajmer, RAJASTHAN

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

ANTI-STATIC SAFETY FLOOR MATTING FOR ELECTRONICS SEC AND ELECTRIC SEC

Indian Army

📍 Ajmer, RAJASTHAN

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Indian Army Non Skid Floor Matting Tender Chamba Himachal Pradesh 2026 - Refined Oil Store Supply Depot

Indian Army

📍 CHAMBA, HIMACHAL PRADESH

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM
Chat with us