324500009 Pump Spares,324500010 Pump Spares,324500011 Pump Spares,324500013 Pump Spares,324500015 P
Hindustan Copper Limited
JHUNJHUNU, RAJASTHAN
Progress
Quantity
165
Category
PUMP-6
Bid Type
Two Packet Bid
Numaligarh Refinery Limited invites bidders for a broad range of pump-1, valve-1, spare-1, SV-1, PUMP-2 to SV-11 categories, with a total of 39 items listed in the BOQ. The procurement location is HAILAKANDI, ASSAM and the project scope encompasses multiple pump/valve/spare assemblies. The tender references a flexible quantity clause (up to 25% increase/decrease) and requires adherence to standard bid documentation. The absence of explicit item specs suggests reliance on detailed tender documents and PQC for qualification. A GST advisory note indicates bidders must determine applicability themselves. AEC/ATC clauses imply compliance with uploaded terms and certificates. Unique delivery and pricing mechanics hinge on contract quantity adjustments at the stated rates. This tender targets suppliers experienced in energy infrastructure components and industrial pumps and valves within the Assam region. The 39-item BOQ and the option clause differentiate this call for bids by scope flexibility and item breadth, signaling a broad procurement of critical spares and components.
Quantity variation up to 25% during and after contract with rates fixed
Bidder to determine GST applicability; reimbursement per actuals or quoted rate
Mandatory upload of certificates/documents as per ATC
Adherence to PQC and detailed tender terms for eligibility
GST payable by bidder; reimbursement can be actual or as per applied rate; payment terms to be as per tender
Delivery period linked to last original delivery order date; extended period may apply with option clause
Not specified in summary; refer to detailed tender documents for LD terms
Eligibility per PQC in commercial part
Demonstrated experience in supplying pump/valve spares
Financial stability as evidenced by financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
PUMP-1 , VALVE-1 , SPARE-1 , SV-1 , PUMP-2 , VALVE-2 , SPARE-2 , SV-2 , PUMP-3 , VALVE-3 , SPARE-3 , SV-3 , PUMP- 4 , VALVE-4 , SPARE-4 , SV-4 , PUMP-5 , VALVE-5 , SPARE-5 , SV-5 , PUMP-6 , VALVE-6 , SPARE-6 , SV-6 , PUMP-7 , SPARE-7 , SV-7 , PUMP-8 , SPARE-8 , SV-8 , PUMP-9 , SPARE- 9 , SV-9 , PUMP-10 , SPARE-10 , SV-10 , PUMP-11 , SPARE-11 , SV-11
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Copper Limited
JHUNJHUNU, RAJASTHAN
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
SONBHADRA, UTTAR PRADESH
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
SONBHADRA, UTTAR PRADESH
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Tender Results
Loading results...
PUMP-1
8S23-PA-1112A-B-C Complete Pump with Motor
VALVE-1
Automatic Recirculation Valve
SPARE-1
8S23-PA-1112A-B-C Mandatory Spares
SV-1
8S23-PA-1112A-B-C Supervision during Erection and Commissioning
PUMP-2
8S21-PA-0712A-B-C Complete Pump with Motor
VALVE-2
Automatic Recirculation Valve
SPARE-2
8S21-PA-0712A-B-C Mandatory Spares
SV-2
8S21-PA-0712A-B-C Supervision during Erection and Commissioning
PUMP-3
8S26-PA-9112A-B Complete Pump with Motor
VALVE-3
Automatic Recirculation Valve
SPARE-3
8S26-PA-9112A-B Mandatory Spares
SV-3
8S26-PA-9112A-B Supervision during Erection and Commissioning
PUMP-4
8S27-PA-9712A-B Complete Pump with Motor
VALVE-4
Automatic Recirculation Valve
SPARE-4
8S27-PA-9712A-B Mandatory Spares
SV-4
8S27-PA-9712A-B Supervision during Erection and Commissioning
PUMP-5
8S23-PA-1111A-B-C Complete Pump with Motor
VALVE-5
Automatic Recirculation Valve
SPARE-5
8S23-PA-1111A-B-C Mandatory Spares
SV-5
8S23-PA-1111A-B-C Supervision during Erection and Commissioning
PUMP-6
8S21-PA-0711A-B-C Complete Pump with Motor
VALVE-6
Automatic Recirculation Valve
SPARE-6
8S21-PA-0711A-B-C Mandatory Spares
SV-6
8S21-PA-0711A-B-C Supervision during Erection and Commissioning
PUMP-7
8S23-PA-1113 Complete Pump with Motor
SPARE-7
8S23-PA-1113 Mandatory Spares
SV-7
8S23-PA-1113 Supervision during Erection and Commissioning
PUMP-8
8S21-PA-0713 Complete Pump with Motor
SPARE-8
8S21-PA-0713 Mandatory Spares
SV-8
8S21-PA-0713 Supervision during Erection and Commissioning
PUMP-9
8S26-PA-9111A-B Complete Pump with Motor
SPARE-9
8S26-PA-9111A-B Mandatory Spares
SV-9
8S26-PA-9111A-B Supervision during Erection and Commissioning
PUMP-10
8S27-PA-9711A-B Complete Pump with Motor
SPARE-10
8S27-PA-9711A-B Mandatory Spares
SV-10
8S27-PA-9711A-B Supervision during Erection and Commissioning
PUMP-11
8S28-PA-1611 Complete Pump with Motor
SPARE-11
8S28-PA-1611 Mandatory Spares
SV-11
8S28-PA-1611 Supervision during Erection and Commissioning
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PUMP-1 | 8S23-PA-1112A-B-C Complete Pump with Motor | 3 | nos | koushikbarman | 210 | |
| 2 | VALVE-1 | Automatic Recirculation Valve | 3 | nos | koushikbarman | 210 | |
| 3 | SPARE-1 | 8S23-PA-1112A-B-C Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 4 | SV-1 | 8S23-PA-1112A-B-C Supervision during Erection and Commissioning | 15 | days | koushikbarman | 210 | |
| 5 | PUMP-2 | 8S21-PA-0712A-B-C Complete Pump with Motor | 3 | nos | koushikbarman | 210 | |
| 6 | VALVE-2 | Automatic Recirculation Valve | 3 | nos | koushikbarman | 210 | |
| 7 | SPARE-2 | 8S21-PA-0712A-B-C Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 8 | SV-2 | 8S21-PA-0712A-B-C Supervision during Erection and Commissioning | 15 | days | koushikbarman | 210 | |
| 9 | PUMP-3 | 8S26-PA-9112A-B Complete Pump with Motor | 2 | nos | koushikbarman | 210 | |
| 10 | VALVE-3 | Automatic Recirculation Valve | 2 | nos | koushikbarman | 210 | |
| 11 | SPARE-3 | 8S26-PA-9112A-B Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 12 | SV-3 | 8S26-PA-9112A-B Supervision during Erection and Commissioning | 10 | days | koushikbarman | 210 | |
| 13 | PUMP-4 | 8S27-PA-9712A-B Complete Pump with Motor | 2 | nos | koushikbarman | 210 | |
| 14 | VALVE-4 | Automatic Recirculation Valve | 2 | nos | koushikbarman | 210 | |
| 15 | SPARE-4 | 8S27-PA-9712A-B Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 16 | SV-4 | 8S27-PA-9712A-B Supervision during Erection and Commissioning | 10 | days | koushikbarman | 210 | |
| 17 | PUMP-5 | 8S23-PA-1111A-B-C Complete Pump with Motor | 3 | nos | koushikbarman | 210 | |
| 18 | VALVE-5 | Automatic Recirculation Valve | 3 | nos | koushikbarman | 210 | |
| 19 | SPARE-5 | 8S23-PA-1111A-B-C Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 20 | SV-5 | 8S23-PA-1111A-B-C Supervision during Erection and Commissioning | 15 | days | koushikbarman | 210 | |
| 21 | PUMP-6 | 8S21-PA-0711A-B-C Complete Pump with Motor | 3 | nos | koushikbarman | 210 | |
| 22 | VALVE-6 | Automatic Recirculation Valve | 3 | nos | koushikbarman | 210 | |
| 23 | SPARE-6 | 8S21-PA-0711A-B-C Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 24 | SV-6 | 8S21-PA-0711A-B-C Supervision during Erection and Commissioning | 15 | days | koushikbarman | 210 | |
| 25 | PUMP-7 | 8S23-PA-1113 Complete Pump with Motor | 1 | nos | koushikbarman | 210 | |
| 26 | SPARE-7 | 8S23-PA-1113 Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 27 | SV-7 | 8S23-PA-1113 Supervision during Erection and Commissioning | 5 | days | koushikbarman | 210 | |
| 28 | PUMP-8 | 8S21-PA-0713 Complete Pump with Motor | 1 | nos | koushikbarman | 210 | |
| 29 | SPARE-8 | 8S21-PA-0713 Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 30 | SV-8 | 8S21-PA-0713 Supervision during Erection and Commissioning | 5 | days | koushikbarman | 210 | |
| 31 | PUMP-9 | 8S26-PA-9111A-B Complete Pump with Motor | 2 | nos | koushikbarman | 210 | |
| 32 | SPARE-9 | 8S26-PA-9111A-B Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 33 | SV-9 | 8S26-PA-9111A-B Supervision during Erection and Commissioning | 10 | days | koushikbarman | 210 | |
| 34 | PUMP-10 | 8S27-PA-9711A-B Complete Pump with Motor | 2 | nos | koushikbarman | 210 | |
| 35 | SPARE-10 | 8S27-PA-9711A-B Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 36 | SV-10 | 8S27-PA-9711A-B Supervision during Erection and Commissioning | 10 | days | koushikbarman | 210 | |
| 37 | PUMP-11 | 8S28-PA-1611 Complete Pump with Motor | 1 | nos | koushikbarman | 210 | |
| 38 | SPARE-11 | 8S28-PA-1611 Mandatory Spares | 1 | ls | koushikbarman | 210 | |
| 39 | SV-11 | 8S28-PA-1611 Supervision during Erection and Commissioning | 5 | days | koushikbarman | 210 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates demonstrating relevant pump/valve spare parts supply
Financial statements (as specified in terms)
EMD/Security deposit documentation (as required by ATC)
Technical bid documents and OEM authorizations
Certificate of conformity to relevant standards (as applicable)
Key insights about ASSAM tender market
Bidders must submit GST, PAN, experience certificates, financials, EMD, OEM authorizations, and technical compliance documents via the portal. Ensure PQC requirements are met and upload all ATC attachments. The 39-item BOQ requires item-specific specs in the commercial bid. Delivery terms depend on the last original delivery order date, with a 25% quantity variation window.
Required submissions include GST certificate, PAN card, experience certificates for pump/valve spares, financial statements, EMD documentation, technical bid and OEM authorizations, and any conformity certificates to standards cited in the tender. All documents must be uploaded as per ATC and PQC requirements.
The tender references IS/ISI or other referenced standards; bidders should provide OEM authorizations and compliance certificates. Exact standard numbers will be in the detailed PQC and commercial attachments. Ensure products meet the required quality benchmarks for industrial pumps and valves.
The purchaser may vary quantity up to 25% of the bid quantity at the contracted rates. In extended delivery periods, the extra time is calculated as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.
Bidders must determine GST applicability themselves; the buyer will reimburse GST as actuals or per the quoted GST rate, whichever is lower, subject to the maximum GST percentage quoted in the bid.
Delivery timelines commence from the last date of the original delivery order. If the option clause is exercised, the added time is calculated using the specified formula, ensuring a minimum delivery window of 30 days.
PQC requirements are detailed in the commercial section; bidders must demonstrate relevant experience in supplying pumps, valves, or spares, financial resilience, and compliance with mandatory certificates. OEM authorizations and product conformity certificates are also required.
Review the uploaded ATC document in the portal, ensure all mandatory certificates and formats are included, and confirm alignment with the PQC criteria. Non-compliance or missing certificates may lead to bid rejection.
Numaligarh Refinery Limited
📍 HAILAKANDI, ASSAM
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS