Hydranal Reference Water Standard
Central Power Research Institute (cpri) Bangalore Karnataka
HYDERABAD, TELANGANA
Bid Publish Date
28-May-2026, 9:05 am
Bid End Date
08-Jun-2026, 6:00 pm
Location
Progress
Quantity
6
Bid Type
Two Packet Bid
Organization: Bharat Heavy Electricals Limited (BHEL) – Department of Heavy Industry. Product category: HYDRANAL WATER STANDARD goods (supply only). Scope: Supply of goods with no installation; delivery terms tied to original delivery period with a 25% quantity option during contract and currency. Location: India (specific city/state not disclosed). Estimated value and EMD: Not disclosed. Acknowledges GST applicability and purchaser reserve rights for price/quantity adjustments. Key differentiator: Option clause enabling 25% supply variation and extended delivery time formula. Unique aspects: Post-receipt inspection at BHEL HEEP Central Store; pre-dispatch inspection not applicable unless selected.
Supply of HYDRANAL WATER STANDARD goods
Post-receipt inspection at BHEL HEEP Central Store
Quantity adjustments up to 25% during/after contract
Delivery period minimum 30 days extension
GST to be self-verified; reimbursement as actuals or capped at quoted GST
Option to adjust quantity by up to 25% with extended delivery time formula
Post-receipt inspection at BHEL HEEP Central Store; pre-dispatch inspection not applicable
GST applicability and reimbursement policy; bidder to determine GST
GST reimbursement to be at actuals or as per applicable rates; payment terms not explicitly stated in data.
Delivery period starts from last date of original delivery order; extended time computed as (increased quantity/ original quantity) × original delivery period, minimum 30 days.
Contract may be terminated for non-compliance; penalties are implied for delays or defective delivery; exact LD rate not specified.
Compliance with ATC terms and submission of all required documents
Ability to supply goods without installation and meet delivery timelines
GST registration and financial stability evidence
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
HYDRANAL WATER STANDARD
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Central Power Research Institute (cpri) Bangalore Karnataka
HYDERABAD, TELANGANA
Nuclear Power Corporation Of India Limited
TIRUNELVELI, TAMIL NADU
Hindustan Aeronautics Limited (hal)
N/A
CHENNAI, TAMIL NADU
N/A
BARDHAMAN, WEST BENGAL
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST certificate
PAN card
Experience certificates
Financial statements
EMD documents
Technical bid documents
OEM authorizations (if applicable)
Bidders should prepare GST registration, PAN, experience certificates, and financial statements, plus EMD documents and technical bid documents. Ensure compliance with post-receipt inspection at BHEL HEEP Central Store and be ready for a 25% quantity variation and extended delivery period per contract terms.
Submit GST certificate, PAN, experience certificates, financial statements, EMD, technical bid documents, and OEM authorizations where applicable. Ensure all certificates align with ATC/BOQ requirements and are uploaded to the portal as part of the bid submission.
Delivery starts from the last date of the original delivery order; quantity may be increased/decreased by up to 25%. If extended, delivery time uses the formula (increased quantity/original quantity) × original period, minimum 30 days.
There is a post-receipt inspection at BHEL HEEP Central Store. Pre-dispatch inspection is Not Applicable unless the ATC specifies. No installation service is included; scope is goods-only.
Bidders must determine applicable GST; reimbursement will be at actuals or as per lower rate of quoted GST %. This means the supplier bears GST calculation responsibility; ensure tax invoices reflect correct rates.
The purchaser may terminate the contract for non-compliance, failure to deliver within the stipulated period, insolvency, or misrepresentation. Delivery delays may trigger penalties or contract termination as per ATC terms.
Scope is strictly supply of goods; no installation or services are included. The delivery must align with original order timelines, with potential extension per 25% quantity variation and extended delivery rules.
THE WEST BENGAL POWER DEVELOPMENT CORPORATION LTD.
📍 MEDINIPUR EAST, WEST BENGAL
📍 JHARSUGUDA, ODISHA
Indraprastha Power Generation Co. Ltd
📍 CENTRAL DELHI, DELHI
National Fertilizers Limited (nfl)
📍 RUPNAGAR, PUNJAB
Ntpc Limited
📍 VARANASI, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
ATC
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS