GEARBOX, SPIRAL BEVEL, HELICAL, MM: KB-3.5
Rourkela Steel Plant
SUNDERGARH, ODISHA
Bid Publish Date
18-Jun-2026, 5:59 pm
Bid End Date
09-Jul-2026, 5:00 pm
Location
Progress
Quantity
2
Category
FOOT MOUNTED SPIRAL BEVEL THREE STAGE HELICAL GEARBOX WITH HOLLOW OUTPUT SHAFT ALONG WITH SHRINK DIS
Bid Type
Two Packet Bid
Organization: Bokaro Steel Plant, part of Steel Authority Of India Limited. Procurement: Foot mounted spiral bevel three stage gearbox with hollow output shaft, shrink disc, hold back integration, input pinion shaft, and matching gear (card CFL/VII/71). Delivery timeframe: within 7 months from PO placement. Warranty: 12 months from installation or 18 months from supply, whichever is earlier. Acceptable makes include BONFIGLIOLI, ELECON, SIEMENS-FLENDER, ROSSI, SUMITOMO, HEC, KIRLOSKAR, SHANTHI, PREMIUM. Drawings required for approval within 15 days of PO issue. PDI and material test certificates to be supplied. Tender emphasizes indigenous manufacturers or OEM-authorized dealers with ISO/Govt certificates. Scope is single-supply of gearbox assembly with related components and complete documentation. The option clause allows quantity adjustment up to 25% with extended delivery time calculated per formula, ensuring minimum 30 days. This tender targets suppliers capable of producing under strict adherence to defined service factor and gear ratio. Quality checks, no-load test results, and PDI attestation are mandatory.
Option clause allows ±25% quantity adjustments with extended delivery periods and calculated timeframes
Indigenous manufacture or OEM-authorized dealers only; ISO/Govt certificate proof required
Drawings must be submitted for approval within 15 days; PDI and MT certificates mandatory
Not explicitly defined in tender; procurement scope is for supply of goods with standard supplier payment terms to be negotiated at PO stage
Delivery within 7 months from placement of PO; option to extend with quantity-based time calculation and minimum 30 days
Not specified in data; customary LD clauses to be defined in PO following procurement norms
Only indigenous gearbox manufacturers or OEM-authorized dealers
Submit ISO certificate or Govt./authorized agency certificate
Provide OEM authorization letter if bidding as a dealer
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
FOOT MOUNTED SPIRAL BEVEL THREE STAGE HELICAL GEARBOX WITH HOLLOW OUTPUT SHAFT ALONG WITH SHRINK DIS , ONE SET OF INPUT PINION SHAFT AND MATCHING GEAR FOR THE ABOVE GEARBOX (CARD NO. : CFL/VII/71) (FOOT MOU
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
OTHER
OTHER
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Rourkela Steel Plant
SUNDERGARH, ODISHA
Durgapur Steel Plant
BARDHAMAN, WEST BENGAL
Rourkela Steel Plant
SUNDERGARH, ODISHA
Rashtriya Chemicals And Fertilizers Limited (rcf)
MUMBAI, MAHARASHTRA
Bharat Heavy Electricals Limited (bhel)
VELLORE, TAMIL NADU
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
ISO certificate or Govt./authorized agency certificate of manufacturing
OEM authorization letter for dealers
Purchase/Work order copies showing indigenous manufacturing
Drawing approval documentation (within 15 days of PO)
PDI certificate at delivery
Material Test Certificates for gear, pinion, and shaft
No-load test results for the gearbox
Technical bid documents and financial bid (as applicable)
Key insights about JHARKHAND tender market
Bidders must be indigenous gearbox manufacturers or OEM-authorized dealers with ISO or Govt certificate. Submit drawings within 15 days of PO, PDI at delivery, MT certificates for gear/pinion/shaft, and no-load test results. Ensure compliance with 18:1 reduction, 160 kW rating, and service factor 2.5.
Submit GST, PAN, ISO/Govt certification, OEM authorization for dealers, purchase orders showing indigenous manufacturing, drawing approvals, PDI, MT certificates, and gearbox no-load test results. Include material test certificates for gear, pinion, and shaft as part of technical bid.
The tender specifies acceptable makes (BONFIGLIOLI, ELECON, SIEMENS-FLENDER, ROSSI, SUMITOMO, HEC, KIRLOSKAR, SHANTHI, PREMIUM) and requires no-load tests and MT certificates. While IS/ISO numbers are not listed, compliance with supplier’s quality system and OEM drawings is mandatory.
Delivery must occur within 7 months from PO placement. The option to extend is allowed up to 25% quantity changes with adjusted delivery time, ensuring a minimum 30 days extension.
Warranty is 12 months from installation or 18 months from supply, whichever date occurs first. Suppliers must issue a warranty certificate accordingly and provide after-sales support as per standard practice.
Dealers must provide OEM authorization letters and proof of manufacturing capability (ISO or Govt certificate). Indigenous manufacturers should supply relevant certification and purchase order history to demonstrate track record on similar gearboxes.
Submit drawings within 15 days of PO issue to the designated authority. Ensure drawings meet the technical scope (KW 160, 18:1 ratio, hollow output shaft) and attach the approval acknowledgment to the PO package.
Scope is a single supply of Foot Mounted Spiral Bevel Three-Stage Gearbox with hollow output shaft, shrink disc, hold back on the first intermediate pinion shaft, and matching gearset, including all associated documentation and testing as per Annexure-I.
Brahmaputra Valley Fertilizer Corporation Limited (bvfcl)
📍 DIBRUGARH, ASSAM
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 JHANSI, UTTAR PRADESH
Nuclear Power Corporation Of India Limited
📍 TIRUNELVELI, TAMIL NADU
Durgapur Steel Plant
📍 BARDHAMAN, WEST BENGAL
Durgapur Steel Plant
📍 BARDHAMAN, WEST BENGAL
Sign up now to access all documents
Main Document
OTHER
OTHER
OTHER
OTHER
ATC