Relay Switch,Lock Side Window,Dual Brake Valve,AR Vane Pump,Switch Lock Ignition,Wind Screen Glass,
Indian Army
AHMEDABAD, GUJARAT
Bid Publish Date
07-Jan-2026, 11:35 am
Bid End Date
17-Jan-2026, 12:00 pm
Location
Progress
Quantity
12
Category
WIND SCREEN GLASS DOUBLE LAYER WITHG LAMINATED
Bid Type
Single Packet Bid
Organization: Indian Army (Department Of Military Affairs) seeks procurement related to wind screen glass double layer with laminated, cabin lifting pump, RAM assembly, control valve, and fuel filter. Scope covers supply, installation, testing, commissioning, plus operator training and obtaining any required statutory clearances. Estimated value not disclosed; EMD not listed. Location is not specified in the data; procurement appears to support field equipment for military applications. A key differentiator is the option to adjust quantities up to 25% during contract and during currency, with delivery timelines linked to the original delivery period. The tender emphasizes comprehensive scope including installation and training, not just product supply.
Product names: wind screen glass double layer with laminated, cabin lifting pump, RAM assembly, control valve, fuel filter
Quantities: not disclosed in BoQ (N/A); total items: 5
Turnover requirements: minimum average annual turnover over last 3 years for bidder and OEM
OEM/importer requirements: Indian registered office for after-sales service if imported
Delivery term: option-based quantity variation up to 25% at contract and during currency
25% quantity variation allowed at bid and during currency
Supply+ Installation+ Testing+ Commissioning+ Operator training
OEM turnover criteria must be met; audited/CA certificates required
Not explicitly defined in data; bidders should verify in tender for advance or milestone payments and schedule.
Delivery period linked to last date of original delivery order; increased time formula via (increased quantity / original quantity) × original period, minimum 30 days.
Not specified in data; bidders should refer to full tender for LD terms and scope.
Minimum average annual turnover as stated for bidder and OEM over last 3 years
Audited financial statements or CA/Cost Accountant certificate required
OEM authorization for imported products and Indian after-sales service presence
Indian Army
AHMEDABAD, GUJARAT
Indian Army
KAMRUP, ASSAM
Indian Army
BARDHAMAN, WEST BENGAL
Indian Army
AMRITSAR, PUNJAB
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | WIND SCREEN GLASS DOUBLE LAYER WITHG LAMINATED | WIND SCREEN GLASS DOUBLE LAYER WITHG LAMINATED | 1 | pieces | moregem | 15 |
| 2 | CABIN LIFTING PUMP | CABIN LIFTING PUMP | 2 | pieces | moregem | 15 |
| 3 | RAM ASSY | RAM ASSY | 4 | pieces | moregem | 15 |
| 4 | CONTROL VALVE | CONTROL VALVE | 2 | pieces | moregem | 15 |
| 5 | FUEL FILTER | FUEL FILTER | 3 | pieces | moregem | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Audited financial statements or CA/Cost Accountant turnover certificate for last 3 years
OEM authorization/authorization letter for imported products
Technical bid documents demonstrating capability for supply, installation, testing, commissioning, and training
Proof of after-sales service presence in India (for imported OEMs)
Experience certificates for similar procurements
Any statutory clearance documents (if applicable)
Key insights about UTTAR PRADESH tender market
Bidders should prepare GST, PAN, audited turnover certificates, and OEM authorizations; ensure 3-year turnover thresholds are met and provide evidence. The bid requires supply, installation, testing, commissioning, and operator training with after-sales service for imported OEMs in India.
Submit GST certificate, PAN, audited financial statements or CA certificate showing 3-year turnover, OEM authorization if imported, and experience certificates for similar deployments; include technical bid and any statutory clearances if applicable.
OEMs must show minimum average annual turnover over the last 3 years; for bunch bids, the OEM of the highest bid value must meet turnover criteria; provide audited balance sheets or CA certificates indicating turnover figures.
Delivery time extends from the last date of the original delivery order; additional time equals (increased quantity / original quantity) × original delivery period, with a minimum of 30 days and possible extension to the original period.
Imported products require an Indian registered office for after-sales service; OEM authorization must be provided; ensure compliance with any IS/ISI or other standards specified in the full terms for the equipment.
Scope includes supply, installation, testing, commissioning of goods, and training of operators; also includes obtaining statutory clearances required, if any, and integration with field deployments.
The purchaser may vary bid quantity by up to 25% at contract placement and up to 25% during currency at contracted rates; quantities extended per the defined delivery time formula with a minimum 30-day interval.
Mandatory documents include GST, PAN, turnover certificates (audited/CA), OEM authorization (for imported items), experience certificates, technical bid documentation, and proof of after-sales service in India if applicable.
Indian Army
📍 JALPAIGURI, WEST BENGAL
Indian Army
📍 JALANDHAR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS