MR Sl No. 1.001_ SUPPLY,MR Sl No. 02.001_ SITEWORK,MR Sl No. 03.001_ MANDATORY SPARES
Engineers India Limited
SURAT, GUJARAT
Bid Publish Date
21-Nov-2025, 6:25 pm
Bid End Date
05-Dec-2025, 2:00 pm
Bid Opening Date
05-Dec-2025, 2:30 pm
Location
Progress
Quantity
44
Category
SUPPLY AS PER MR SL NO 1
Bid Type
Two Packet Bid
Organization: Engineers India Limited, Pune, Maharashtra. The procurement concerns VALVES - PLUG for the TNT plant at High Explosives Factory (HEF) KHADKI, MIL, Pune. Six total items listed in the BOQ, with no explicit quantities shown in the summary. The bid requires prices on a Freight On Truck/Site (FOT Site) basis, including all taxes and duties, with GST and freight rates disclosed in Form-A. A CPBG (contract performance bank guarantee) is applicable, and SFMS routing is preferred for CPBG submissions. The document supersedes GeM GTC terms per the bid package. EIL emphasizes that bids failing to submit requisite documents may be rejected and that GST/Freight must be clearly indicated. The tender’s unique scope centers on valve plugs for an explosives manufacturing facility, necessitating MIL-specified compliance and secure finance flows.
CPBG applicability per BDS; SFMS routing preferred for BG issuance
Prices must be FOT site inclusive; GST and freight rates disclosed in Form-A
Bid submission requires complete documents per bidding document; GeM terms superseded
CPBG may be recovered from invoices for milestone payments; SBI base rate plus 1% interest on delayed security; bank charges borne by bidder
Delivery terms aligned to project site requirements as per Material Requisition and bidding document; read together with at-site inspection terms
Penalties described in SPC/DBS beyond standard procurement terms; detailed LD provisions to be taken from bidding document
Registered bidders on GeM with access to MIL KHADKI project scope
Experience in supply of plug valves for explosives/industrial plants
Demonstrated ability to provide CPBG and SFMS-compliant bank guarantees
Engineers India Limited
SURAT, GUJARAT
Bharat Heavy Electricals Limited (bhel)
NALGONDA, TELANGANA
Bharat Petroleum Corporation Ltd
MUMBAI, MAHARASHTRA
Engineers India Limited
Gail India Limited
AURAIYA, UTTAR PRADESH
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | SUPPLY AS PER MR SL NO 1 | SUPPLY | 12 | nos | eil_tnt_mil_01 | 150 |
| 2 | SUPPLY AS PER MR SL NO 2 | SUPPLY | 5 | nos | eil_tnt_mil_01 | 150 |
| 3 | SUPPLY AS PER MR SL NO 3 | SUPPLY | 15 | nos | eil_tnt_mil_01 | 150 |
| 4 | SUPPLY AS PER MR SL NO 4 | SUPPLY | 5 | nos | eil_tnt_mil_01 | 150 |
| 5 | SUPPLY AS PER MR SL NO 5 | SUPPLY | 2 | nos | eil_tnt_mil_01 | 150 |
| 6 | SUPPLY AS PER MR SL NO 6 | SUPPLY | 5 | nos | eil_tnt_mil_01 | 150 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for VALVES - PLUG supply
Financial statements or turnover documentation
EMD or CPBG documentation (as applicable)
Technical bid documents and BOM/compliance certificates
OEM authorizations (if applicable)
SFMS-related CPBG routing documentation (if available)
Key insights about MAHARASHTRA tender market
Bidders must register on GeM, submit CPBG via SFMS if possible, and provide Form-A with GST and freight details. Include technical compliance documents, OEM authorizations if required, and proof of turnover. Ensure CPBG aligns with Mil KHADKI TNT plant requirements in Pune.
Required documents include GST certificate, PAN, experience certificates for valve supplies, financial statements, CPBG/EMD proof, technical bid, and OEM authorizations if applicable. Submit inspection reports and compliance certificates per Bid Document and Form-A GST details.
Tender requires MIL KHADKI project compliance; look for IS or MIL standards in bidding doc, with CPBG guidance and SFMS routing. Ensure supplier holds applicable manufacturing and quality certifications and can provide inspection and testing certificates per MRP requirements.
Payments follow milestone-based terms in SPC; CPBG adjustments may be recovered from invoices. Interest on delayed security is SBI base rate plus 1%; ensure timely delivery and acceptance to avoid penalties and ensure smooth release of payments.
FOT Site pricing requires freight up to the project site; Form-A must clearly state GST rate and freight percentage included. All taxes and duties should be bundled into the quoted price, with explicit disclosure in the Form-A document.
Submit CPBG via SFMS platform if possible; the bidding doc notes preference for SFMS routing. If not feasible, hard-copy BG must accompany bid, and the difference may be recovered from milestone payments as per CPBG terms.
Inspection will follow Material Requisition and Bidding Document terms. Suppliers must align with project-specific inspection clauses and provide inspection/test certificates demonstrating conformance to plug valve specifications and safety requirements.
The SP C G and price reduction terms apply; any extensions or variations are governed by SPC clauses. Bidders should review tender terms for any quantity adjustment or extension rights tied to performance and price reduction schedules.
Bharat Petroleum Corporation Ltd
📍 SAGAR, MADHYA PRADESH
Bharat Petroleum Corporation Ltd
📍 ERNAKULAM, KERALA
Indian Oil Corporation Limited
📍 BEGUSARAI, BIHAR
The Braithwaite Burn And Jessop Construction Company Limited
📍 KOLKATA, WEST BENGAL
Eastern Coalfields Limited
📍 BARDHAMAN, WEST BENGAL
Access all tender documents at no cost
Main Document
OTHER
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Main Document
OTHER
OTHER
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS