Urban Development Department Uttar Pradesh High Mast Lighting Octagonal Tower for Small Area with LED Flood Lighting System Tender 2026
N/a
KUSHINAGAR, UTTAR PRADESH
Progress
Quantity
1
Bid Type
Two Packet Bid
The Panchayati Raj Department, Bihar invites bids for the supply, installation, testing and demonstration of a High Mast Lighting Octagonal Tower with an LED Flood Lighting System (V2) intended for small area illumination in Begusarai, Bihar 848201. The scope includes on-site installation, testing and adherence to State/Central Govt guidelines, with coordination across multiple locations. The project requires an octagonal pole design with specified base plate and wind-load capabilities, and emphasizes compliance with structural, electrical and lighting standards. A key differentiator is the integration of LED luminaires within the carriage of each octagonal pole and onsite warranty. The contract permits quantity variations up to 25% and mandates delivery aligned to original/extended timelines, ensuring seamless deployment and acceptance testing. Unique requirements include ISO certifications and CE conformity as part of the seller’s qualifications, along with mandatory local agency participation.
Product: High Mast Lighting Octagonal Tower with LED Flood Lighting System
LED rating/wattage: specify system wattage per luminaire
Octagonal pole height (m) and base plate dimensions (width, thickness, length)
High tensile steel grades for pole construction
Wind load rating (m/s) for the pole structure
Cable size (sq mm) and cable connectors
Lantern carriage diameter and number of LED luminaires per pole
Onsite warranty period (years)
Delivery quantity may vary up to 25% at contract award and during currency
Mandatory ISO 9001:2015, ISO 14001:2015, ISO 18001:2007, ISO/IEC 20000-1:2018, ISO/IEC 27001:2022, ISO 45001:2018, ISO 50001:2018 and CE
Submission requires GST, PAN, Aadhaar, cancelled cheque; local bidder requirement
Not explicitly disclosed; follow standard government procurement payment terms after acceptance testing
Delivery period commences from last date of original delivery order; option to extend up to 25% quantity with calculation as specified
Bid may be summarily rejected for mismatch in technical parameters; penalties not detailed in data
Local agency/bidder eligibility confirmed
Compliance with ISO/CE certifications
Document verification and history documents only for clarification
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
High Mast Lighting Octagonal Tower for Small area with LED Flood Lighting System (V2) (Q2)
Trusted by 5,000+ companies to find, track, and win government tenders.
Our team will walk you through the platform and help set up your profile — free, no commitment.
Our team will reach out to schedule your free session.
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS
N/a
KUSHINAGAR, UTTAR PRADESH
District Panchayat Anand
ANAND, GUJARAT
N/a
AZAMGARH, UTTAR PRADESH
N/a
AZAMGARH, UTTAR PRADESH
Urban Administration And Devlopment
SHIVPURI, MADHYA PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| GENERIC | Installation, testing and demonstration((Installation, testing and demonstration work at multiple locations shall follow as per the guidelines of State/Central Govt rules and regulations as applicable) | No |
| GENERIC | No of LED Luminaires can be fitted in the carriage of each octagonal pole (in Nos) | 4 |
| GENERIC | Lantern carriage Diameter | 1000, 1200, 1500, 2000 Or higher |
| GENERIC | Onsite warranty (in years) | 1, 2, 3, 4, 5 Or higher |
| GENERIC | Height of Octagonal pole (in m) | 7.0 |
| Octagonal Pole Construction | Octagonal pole sheet thickness | 3, 4, 5 Or higher |
| Octagonal Pole Construction | Grades of High Tensile Steel | ISH430LA as per IS:5986 (Grade 355) |
| Base Plate | Width of Base Plate | 200, 250, 275, 300 Or higher |
| Base Plate | Thickness of Base Plate | 12, 16 Or higher |
| Base Plate | Length of Base Plate | 200, 250, 275, 300 Or higher |
| Wind Load | Regional wind withstand capacity which the pole structure support is suitable to withstand (in m/s) | 55 Or higher |
| Electrical System, Cable and Cable connector | Size of Cable(in sq mm) | 1.5, 2.5, 4, 10, 16, 25 Or higher |
| LED Flood Light Luminaire | LED Rating/System Wattage/Rated Power (in Watts) | 100 |
Discover companies most likely to bid on this tender
GST Registration Certificate
PAN Card
Aadhaar Card
Cancelled Cheque
Proof of Local Agency/Bidder eligibility
Technical Clarifications (within 2 days)
ISO certifications (if available) and CE certificate
Experience certificates and financial statements
OEM authorizations (if applicable)
Extended Deadline
08-Jun-2026, 8:00 pm
Opening Date
08-Jun-2026, 8:30 pm
Key insights about BIHAR tender market
Bidders must meet local eligibility, submit GST, PAN, Aadhaar, cancelled cheque, and experience certificates. Ensure ISO 9001:2015 and CE conformity; attach OEM authorizations if required. Clarifications window is limited to historical documents and two-day response time, with compliance to delivery and installation scope.
Required documents include GST Registration, PAN, Aadhaar, Cancelled cheque, proof of local bidder status, technical clarifications within two days, and certified ISO/CE documents. Include experience certificates, financial statements, and OEM authorizations if applicable.
Specifications demand LED luminaires with specified wattage per luminaire, carriage diameter, and number of luminaires per octagonal pole. Cables must be sized per project requirements (sq mm) and wind-load ratings must align with regional standards. Onsite testing and demonstration are mandatory.
Delivery must commence after the last date of the original delivery order; option to extend up to 25% quantity with adjusted delivery time based on the formula provided, ensuring minimum 30 days extension where applicable.
Bidders must comply with ISO 9001:2015, ISO 14001:2015, ISO 18001:2007, ISO/IEC 20000-1:2018, ISO/IEC 27001:2022, ISO 45001:2018, ISO 50001:2018, and CE conformity. Non-compliance results in bid rejection and disqualification.
Scope includes installation, testing and demonstration across multiple locations per government rules, with onsite warranty period to be defined in tender. All installation charges are included in the bid price; ensure all technical parameters match the specified requirements.
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 BASTI, UTTAR PRADESH
Nagar Panchayat Badlapur Jaunpur
📍 JAUNPUR, UTTAR PRADESH
Nagar Panchayat Chharra Aligarh
📍 ALIGARH, UTTAR PRADESH
Nagar Panchayat Chharra Aligarh
📍 ALIGARH, UTTAR PRADESH
Nagar Panchayat Chharra Aligarh
📍 ALIGARH, UTTAR PRADESH
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS