VANE PUMP,ARMATURE MOROR,DRIVE HARDENED STEEL OPINION,FUEL FILTER,BLACK OUT CHANGE OVER SWITCH,FLAS
Indian Army
DEHRADUN, UTTARAKHAND
Bid Publish Date
02-Feb-2026, 5:40 pm
Bid End Date
12-Feb-2026, 6:00 pm
Location
Progress
Quantity
20
Category
Solenoid Switch
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids from qualified suppliers for a broad category of automotive and military-grade components to be procured in Dehradun, Uttarakhand. The scope encompasses 16 item types such as Solenoid Switch, Chain Set, Brush Holder, Armature Assembly, Change Over Switch, Knuckle Post, U Bolt, Tie Rod End, Clutch Cylinder Assembly, Valve Assembly, ECM Controller Assembly EPI, Ignition Coil, Cord Set Tension, Body Assembly Throttle, Rubber Coupling, and Reverse Light Switch. The process requires minimum sample approval prior to bid opening, and items must meet high-repute make. The procurement includes a pre-bid meeting and mandatory physical samples within 24 hours of technical bid opening. Items must be delivered in proper sealed packing with supporting technical literature. The option clause allows quantity variation up to 25% of bid quantity during contract and currency, with delivery time adjustments accordingly.
16 item categories including Solenoid Switch, Chain Set, Brush Holder, Armature Assembly, Change Over Switch, Knuckle Post, U Bolt, Tie Rod End, Clutch Cylinder Assembly, Valve Assembly, ECM Controller Assembly EPI, Ignition Coil, Cord Set Tension, Body Assembly Throttle, Rubber Coupling, Reverse Light Switch
No explicit numeric specifications published; emphasis on best quality, reputable makes, and military-grade compatibility
Pre-bid and sample approvals are mandatory to validate technical compliance
Sealed packing and provision of technical literature are required for all items
Opportunity includes 25% quantity variation rights during contract and currency
Mandatory pre-bid meeting and sample approvals prior to bid opening
Sealed packing and supplier certifications required, including non-blacklisting
16 specified item categories with no explicit numeric standards published
Not specified in data; bidders should anticipate standard Government terms and propose accordingly
Delivery period adjusts with quantity variations; minimum extension rules apply based on (additional quantity/original quantity) × original delivery period, with a minimum 30 days
Not specified in data; bidders should seek standard LD terms during contract finalization
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
Sri Ganganagar, RAJASTHAN
Indian Army
PITHORAGARH, UTTARAKHAND
Indian Army
BARAMULLA, JAMMU & KASHMIR
Indian Army
EAST SIKKIM, SIKKIM
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Solenoid Switch | Solenoid Switch | 1 | pieces | buycon4266.ia.ua | 15 |
| 2 | Chain Set | Chain Set | 1 | pieces | buycon4266.ia.ua | 15 |
| 3 | Brush Holder | Brush Holder | 1 | pieces | buycon4266.ia.ua | 15 |
| 4 | Armature Assy | Armature Assy | 1 | pieces | buycon4266.ia.ua | 15 |
| 5 | Change Over Switch | Change Over Switch | 1 | pieces | buycon4266.ia.ua | 15 |
| 6 | Knuckle Post | Knuckle Post | 1 | pieces | buycon4266.ia.ua | 15 |
| 7 | U Bolt | U Bolt | 1 | pieces | buycon4266.ia.ua | 15 |
| 8 | Tie Rod end | Tie Rod end | 2 | pieces | buycon4266.ia.ua | 15 |
| 9 | Clutch Cylinder Assy | Clutch Cylinder Assy | 1 | pieces | buycon4266.ia.ua | 15 |
| 10 | Valve Assy | Valve Assy | 1 | pieces | buycon4266.ia.ua | 15 |
| 11 | ECM Controller Assy EPI | ECM Controller Assy EPI | 1 | pieces | buycon4266.ia.ua | 15 |
| 12 | Ignition Coil | Ignition Coil | 2 | pieces | buycon4266.ia.ua | 15 |
| 13 | Cord Set Tension | Cord Set Tension | 2 | pieces | buycon4266.ia.ua | 15 |
| 14 | Body Assy Throttle | Body Assy Throttle | 1 | pieces | buycon4266.ia.ua | 15 |
| 15 | Rubber Coupling | Rubber Coupling | 1 | pieces | buycon4266.ia.ua | 15 |
| 16 | Reverse Light Switch | Reverse Light Switch | 2 | pieces | buycon4266.ia.ua | 15 |
Discover companies most likely to bid on this tender
- GST registration certificate
- PAN card
- Experience certificates for similar automotive/military components
- Financial statements or turnover proof
- EMD/Security deposit as applicable by terms
- Technical bid documents and product literature
- OEM authorization/ceneric manufacturer authorization
- Certification of non-blacklisting from Government/defense bodies
Key insights about UTTARAKHAND tender market
Bidders should attend the compulsory pre-bid meeting, submit physical samples within 24 hours of technical bid opening, provide technical literature, and ensure items come from reputable manufacturers with sealed packaging. Board-approved samples are required before commercial bid opening; ensure non-blacklisting documentation is included.
Required documents include GST registration, PAN, financial statements, experience certificates for similar items, EMD/Security deposit, OEM authorizations, technical literature, and a certificate of non-blacklisting. Samples must be physically submitted within 24 hours of technical bid opening.
The 16 categories cover Solenoid Switch, Chain Set, Brush Holder, Armature Assembly, Change Over Switch, Knuckle Post, U Bolt, Tie Rod End, Clutch Cylinder Assembly, Valve Assembly, ECM Controller Assembly EPI, Ignition Coil, Cord Set Tension, Body Assembly Throttle, Rubber Coupling, and Reverse Light Switch.
The pre-bid meeting is compulsory; bidders must participate to understand scope, clarify technical and contractual terms, and align on sample submission timelines. After pre-bid, samples must be approved by the board of officers prior to opening commercial bids.
Items must be supplied in proper sealed packing to ensure tamper-evidence and protection during transit. Bidders should present packaging configurations and packing standards during bid submission and provide packing material details in the technical literature.
Yes. The purchaser reserves the right to increase or decrease bid quantity up to 25% of bid quantity at contract placement and during currency, with delivery period adjustments calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days.
Indian Army
📍 AMRITSAR, PUNJAB
Indian Army
📍 MEERUT, UTTAR PRADESH
Indian Army
📍 SONITPUR, ASSAM
Indian Army
📍 SURENDRA NAGAR, GUJARAT
Indian Army
📍 KANGRA, HIMACHAL PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS