air conditioner
Institute Of Hotel Management
CHENNAI, TAMIL NADU
Bid Publish Date
12-Jul-2026, 12:53 pm
Bid End Date
22-Jul-2026, 1:00 pm
EMD
₹29,394
Progress
Quantity
30
Bid Type
Two Packet Bid
Northern Coalfields Limited, under Coal India Limited, seeks non-inverter air conditioners for procurement, including Supply, Installation, Testing and Commissioning. The bid includes an EMD of ₹29,394 and allows a ±25% quantity variance at contract placement and during currency, at contracted rates. Delivery terms link to the original delivery period with potential extensions, minimum 30 days. Bidders must declare whether they are manufacturers or traders, and provide proof of manufacturing or principal/OEM authorization. Start of delivery and detailed specs are not provided in the data.
Product/service names: non-inverter air conditioners (AC units) for procurement
Quantities/values: not specified; EMD ₹29,394 indicates procurement scale
Standards/Certifications: IS/IEC not specified; specific standards not provided
Delivery/installation: scope includes Supply, Installation, Testing and Commissioning
Warranty/AMC: not specified in data; replacement for damaged goods within one month
Manufacturer/trader: must declare status with proof of manufacturing or OEM authorization
EMD ₹29,394; bid validity and payment terms in terms ATC not provided
Quantity may vary up to 25% during contract; delivery time adjustments apply per option clause
Submission must include OEM/manufacturer proof; damaged items replaced within one month
Total landed cost to be borne by buyer; no additional taxes/duties beyond contract terms
Delivery begins from last date of original delivery order; extensions based on option clause with minimum 30 days
Damaged goods must be replaced within one month; non-compliance may lead to replacement at supplier cost
Declare as manufacturer or trader/distributor with appropriate proof
Provide proof of manufacturing for manufacturer bids or OEM authorization for traders
Submit all required GST, PAN, experience certificates, and financials
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
AIR CONDITIONER NON INVERTER
Advisory Bank
ICICI
ePBG Percentage
5%
ePBG Duration (Months)
5
Payment Timelines
Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
90
Delivery Locations
1
Delivery Cities
Singrauli
Delivery Pincodes
486892
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| Amit Kumar | 486892,DEPOT OFFICE, REGIONAL STORES, BLOCK B, NCL, PO - GORBI | Singrauli | Madhya Pradesh | 486892 | 30 | 90 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Institute Of Hotel Management
CHENNAI, TAMIL NADU
Indian Army
AMBALA, HARYANA
Bharat Electronics Limited (bel)
BANGALORE, KARNATAKA
Indian Army
AGRA, UTTAR PRADESH
Bharat Electronics Limited (bel)
BANGALORE, KARNATAKA
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar AC supply projects
Financial statements or turnover proof
EMD payment proof (Online/DD as permitted)
Technical bid documents and compliance certificates
OEM authorization or proof of manufacturing (for manufacturers) or principal/OEM documents (for traders)
Any bid ATC/corrigendum certificates
Bidders must submit documents for OEM/Manufacturing proof, GST, PAN, experience, and financials; include EMD ₹29,394 and declare whether you are a manufacturer or trader. Ensure compliance with ATC terms and provide installation, testing and commissioning scope as part of offer.
Required documents include GST certificate, PAN card, experience certificates for similar AC projects, financial statements, EMD proof, technical bid documents, and OEM authorizations or proof of manufacturing depending on bidder type. Ensure ATC compliance and certificate uploads.
Delivery terms specify start from the last date of the original delivery order; option clause allows up to 25% quantity variation; extended delivery time uses a formula with a minimum 30 days. Replacements for damaged goods must occur within one month at supplier cost.
tender requires submission of all certificates sought in Bid Document/ATC; however, specific standards (IS/ISO) are not detailed in data. Ensure OEM authorization and proof of manufacturing where applicable and provide compliance certificates with bid.
The EMD amount is ₹29,394. Submit proof of payment online or via DD according to the tender’s payment terms. Ensure the EMD remains valid for bid validity and any extended period as per contract rules.
In your offer, clearly indicate status as manufacturer or trader. If manufacturer, attach manufacturing proof; if trader, attach OEM authorization or principal company documents to verify capability and compliance with bid ATC.
If goods arrive damaged, replacement is required within one month at supplier cost. After one month, responsibility transfers to consignee; ensure inspections on arrival and immediate supplier remediation.
Scope includes Supply, Installation, Testing and Commissioning of non-inverter AC units. Ensure the bid includes all labor, materials, and services necessary for complete operational readiness at the consignee site.
Indian Army
📍 AMRITSAR, PUNJAB
Higher Education
📍 SALEM, TAMIL NADU
Saha Institute Of Nuclear Physics
Directorate of Technical Education
📍 SALEM, TAMIL NADU
Indian Army
📍 BAREILLY, UTTAR PRADESH
Sign up now to access all documents
Main Document
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS