Indian Army Department Of Military Affairs Rectifier Regulator For Alternator Control Valve Rep Kit Tender 2025
Indian Army
DARJEELING, WEST BENGAL
Bid Publish Date
03-Jan-2026, 9:48 am
Bid End Date
13-Jan-2026, 10:00 am
Location
Progress
Quantity
8
Category
Brush Set
Bid Type
Two Packet Bid
The Indian Army, Department of Military Affairs, invites bids for the supply of five distinct goods: Brush Set, Rectifier Regulator, Engine Overhaul Kit, Steering Pump, and Rubber Hose. The scope is limited to the supply of goods with an adaptable quantity clause and a delivery framework aligned to option-based adjustments. The tender’s procurement category spans multiple automotive and mechanical components, targeting suppliers capable of rapid fulfillment under government oversight. The unique feature is the option clause permitting a 25% quantity variance during both initial and currency delivery windows, with a minimum additional delivery time of 30 days.
Product/service names: Brush Set, Rectifier Regulator, Engine Overhaul Kit, Steering Pump, Rubber Hose
Category: Government supply of mechanical/components
Quantity/scale: Not disclosed in BOQ; total items: 5
EMD/estimated value: Not disclosed in tender data
Experience: Prior supply of similar automotive/mechanical components preferred
Key Term 1: Quantity may vary by ±25% with contract extension provisions
Key Term 2: Delivery period recalculated based on changed quantity; minimum 30 days
Key Term 3: Scope limited to supply of goods; no installation or service terms detailed
Purchaser may increase/decrease quantity up to 25% at bid quantity and during currency of contract at contracted rates
Delivery period starts from last date of original delivery order; extended period depends on quantity change and minimum 30 days
Standard government procurement terms apply; detailed payment terms not disclosed in data
Experience in supplying automotive/mechanical components to government entities
Financial capability demonstrated by audited statements
Compliance with standard procurement norms and ability to meet delivery timelines
Indian Army
DARJEELING, WEST BENGAL
Indian Army
SONITPUR, ASSAM
Indian Army
RI BHOI, MEGHALAYA
Indian Army
AHMEDABAD, GUJARAT
Indian Army
DARJEELING, WEST BENGAL
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Brush Set | Brush Set | 4 | nos | [email protected] | 15 |
| 2 | Rectifier Regulator | Rectifier Regulator | 1 | nos | [email protected] | 15 |
| 3 | Engine Overhaul Kit | Engine Overhaul Kit | 1 | nos | [email protected] | 15 |
| 4 | Steering Pump | Steering Pump | 1 | nos | [email protected] | 15 |
| 5 | Rubber Hose | Rubber Hose | 1 | nos | [email protected] | 15 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar supply of automotive/mechanical components
Financial statements (latest audited) demonstrating financial stability
EMD submission document (amount not specified in data but required per standard practice)
Technical bid documents demonstrating product range and compliance
OEM authorizations or dealership certifications (if applicable)
Key insights about WEST BENGAL tender market
Bidders should prepare standard bid documents (GST, PAN, financials) and submit a technical bid demonstrating capability to supply five items: Brush Set, Rectifier Regulator, Engine Overhaul Kit, Steering Pump, Rubber Hose. Ensure compliance with GEM procurement norms and be ready to honor a ±25% quantity option with corresponding delivery schedule adjustments.
Required documents include GST registration, PAN, audited financial statements, experience certificates for similar supply, OEM authorizations if applicable, and an EMD submission document. Technical bid should prove product coverage for all five items and the ability to maintain contract pricing.
Delivery terms permit a 25% quantity adjustment during contract and currency, with delivery period recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Delivery starts after the last date of the original delivery order. Extended periods apply if quantities rise.
The five items are: Brush Set, Rectifier Regulator, Engine Overhaul Kit, Steering Pump, and Rubber Hose. The tender emphasizes supply of goods only, with no installation or maintenance services specified in current data.
No specific standards are listed in the provided data. Bidders should follow general government procurement norms, supply chain due diligence, and OEM authorizations if required by the manufacturer for these components.
The data does not specify a submission deadline. Bidders should monitor the GEM portal for notices and ensure readiness of technical and financial bids, including EMD documentation and OEM authorizations, in alignment with standard government procurement timelines.
Nlc India Limited
📍 CUDDALORE, TAMIL NADU
Office Of Dg (aero)
📍 BANGALORE, KARNATAKA
Indo Tibetan Border Police (itbp)
📍 LOHIT, ARUNACHAL PRADESH
N/a
📍 BATHINDA, PUNJAB
Indian Army
📍 KAMRUP, ASSAM
Sign up now to access all documents
Main Document
BOQ
BOQ
GEM_GENERAL_TERMS_AND_CONDITIONS