TenderDekho Logo
GEM

Indian Army Split Air Conditioner 2 Ton Tender Jalandhar Punjab 2026 – Cooling Equipment Procurement

Bid Publish Date

08-Jul-2026, 8:04 pm

Bid End Date

18-Jul-2026, 9:00 pm

Value

₹2,40,000

Progress

Issue08-Jul-2026, 8:04 pm
AwardPending
Explore all 6 tabs to view complete tender details

Quantity

3

Bid Type

Two Packet Bid

Categories 1

Tender Overview

The Indian Army invites bids for the procurement of Split Air Conditioners 2 Ton for operations in JALANDHAR, PUNJAB with an estimated value of ₹240,000. The scope centers on supply of air conditioning units (2 Ton capacity) to meet installation needs in a military context. The tender specifies an option clause permitting quantity adjustments up to 25% of bid quantity during contract, with extended delivery timelines calculated as (Additional quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Bidders must align with the government’s procurement norms and ensure delivery from the last date of the original order. Branding or OEM alignment is not excluded, but overseas suppliers must have in-India aftersales support.

Technical Specifications & Requirements

Key points derived from the tender data include: final product type as Split AC 2 Ton, with no detailed technical specs published in the tender. The contract enforces an option clause for quantity variation up to 25% and extended delivery timelines. Turnover criteria are specified for bidders and OEMs, requiring audited balance sheets or CA/Cost Accountant certificates for the last three years. For imported items, the OEM or authorized seller must have a registered Indian office to provide after-sales service. The tender also requires vendor documentation for PAN, GSTIN, cancelled cheque, and EFT mandate.

Terms & Eligibility

  • EMD: Not explicitly stated in the data; verify in tender package.
  • Turnover: Minimum average annual turnover over the last three years as specified in bid document (both bidder and OEM).
  • Delivery: Delivery period to commence after the original delivery date; option quantity adjustments may extend timelines with minimum 30 days.
  • Documents: PAN, GSTIN, cancelled cheque, EFT mandate; CA/CAC certified turnover.
  • OEM/Import: If imported, OEM must have India-based registered office for aftersales support.
  • Ensure compliance with government procurement norms and submission of all requested vendor documents.

Key Specifications

    • Product: Split Air Conditioner 2 Ton
    • Category: Air conditioning/heating equipment (government procurement by Indian Army)
    • Brand/OEM: Not restricted, butOEM/Authorized Seller must have India-based office for aftersales (if imported)
    • Delivery flexibility: Up to 25% quantity variation; delivery time adjusted by formula with minimum 30 days
    • Financials: Requires minimum turnover and audited/certified turnover documentation for bidder and OEM

Terms & Conditions

  • Key term: Quantity variation up to 25% during and after contract at contracted rates

  • Key term: Delivery period calculated with extended time formula; minimum 30 days

  • Key term: Documentation for PAN, GSTIN, cancelled cheque, EFT mandate required

Important Clauses

Payment Terms

Not explicitly specified in data; verify in contract; ensure EFT mandate submission

Delivery Schedule

Delivery starts from last date of original delivery order; extended periods allowed per option clause with minimum 30 days

Penalties/Liquidated Damages

Not detailed in provided data; refer to standard government LD terms in T&C

Bidder Eligibility

  • bidder must meet turnover criteria for last three financial years

  • OEM turnover criteria satisfied for the category with highest bid value in bunch bids

  • OEM/Authorized Seller must have India-based registered office if product is imported

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

Yes

Item Category

SPLIT AIR CONDITIONER 2 TON

Delivery Details

Max Delivery Days

15

Delivery Locations

1

Delivery Cities

JALANDHAR CITY

Delivery Locations

ConsigneeAddressCityStatePincodeQuantityDelivery DaysAdditional Requirement
-JALANDHAR CITYJALANDHAR CITY--315-

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9579115.pdf

Main Document

Other Documents

OTHER

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

SPLIT AIR CONDITIONER 2 TON

Indian Army

JAMNAGAR, GUJARAT

Posted: 26 September 2025
Closed: 11 October 2025
GEM

SPLIT AIR CONDITIONER (2 TON)

Indian Council Of Medical Research (icmr)

HYDERABAD, TELANGANA

Posted: 9 February 2026
Closed: 9 March 2026
GEM

AIR CONDITIONER SPLIT 2 TON

Hindustan Petroleum Corporation Ltd

CENTRAL DELHI, DELHI

Posted: 9 September 2025
Closed: 8 October 2025
GEM

SPLIT AIR CONDITIONER 1.5 TON

Bharat Electronics Limited (bel)

BANGALORE, KARNATAKA

Posted: 13 February 2026
Closed: 24 February 2026
GEM

Bharat Electronics Limited Air Conditioner Split 2 Ton Tender Pune Maharashtra 2026

Bharat Electronics Limited (bel)

PUNE, MAHARASHTRA

Posted: 14 March 2026
Closed: 27 March 2026
GEM

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Audited Balance Sheets for last three years or CA/Cost Accountant turnover certificate

6

OEM authorization (for non-OEM bidders) and proof of Indian aftersales support (if imported product)

7

Experience certificates and financial statements

8

Any other bid documents as specified in Terms and Conditions

Frequently Asked Questions

Key insights about PUNJAB tender market

How to bid for the Indian Army Split Air Conditioner tender in Jalandhar?

Bidders must submit PAN, GSTIN, cancelled cheque and EFT mandate, plus turnover evidence for the last three years. Ensure OEM turnover compliance and provide CA-certified turnover data. Confirm 2 Ton split AC specifications and comply with option quantity adjustments up to 25%.

What documents are required for tender submission in Jalandhar air conditioner procurement?

Submit PAN, GSTIN, cancelled cheque, EFT mandate, audited turnover or CA certificate for bidder and OEM, OEM authorization if not manufacturer, and any turnover/capability documents to prove after-sales support in India for imported units.

What are the delivery terms for the 2 Ton split AC tender in Punjab?

Delivery starts after the original delivery order date; quantity may be increased by up to 25% with rates unchanged. Additional time is computed as (additional quantity/original quantity) × original delivery period, with a minimum of 30 days.

What turnover requirements apply to bidders and OEMs for this Army tender?

Bidders must meet minimum average annual turnover over the last three financial years; OEMs must also meet the same criterion. If the bidder/OEM is under 3 years old, turnover is calculated on completed years since incorporation.

Are imported air conditioners allowed and what aftersales are required?

Imported units are allowed only if the OEM or authorized seller has a registered Indian office to provide after-sales service. Include OEM authorization and proof of service capabilities in the bid submission.

What is the estimated value and quantity flexibility for the Army AC tender?

Estimated value is ₹240,000. Quantity may vary up to 25% during contract placement and within the currency of the contract, with rates kept constant as per the original bid.

What standards or certifications are mandated for the air conditioners?

The tender data references standard compliance expectations; bidders should align with IS/IEC-related air conditioning standards and provide OEM specifications and warranty terms as part of the bid package.

What is required to prove eligibility for OEM turnover in this tender?

Provide audited balance sheets for the last three years or CA/Cost Accountant turnover certificates. If the OEM was established less than three years ago, use completed years for turnover computation.

Similar Tenders

5 found
Urgent

Indian Army Split Air Conditioner 2 Ton Tender Jaipur Rajasthan 2026 ISO 9001

Indian Army

📍 JAIPUR, RAJASTHAN

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Urgent

Split Air conditioner 2.6 Ton

Bharat Electronics Limited (bel)

📍 KRISHNA, ANDHRA PRADESH

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM

Split 2 Ton AC

Director General Of National Cadet Corps (dgncc)

📍 LUCKNOW, UTTAR PRADESH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

Contract Bidding Open For Procurement of Split Air Conditioner in INDORE, MADHYA PRADESH

Devi Ahilya Vishwavidyalaya - Indore

📍 INDORE, MADHYA PRADESH

EMD: ₹45,000
⏰ Deadline: 3 weeks left
🛒 Type: Goods
View EPROCURE
Urgent

Indian Navy Split AC Procurement 2 Ton for Kochi Naval Base 2026 ISO 9001 Service Centers

Indian Navy

📍 ERNAKULAM, KERALA

Est: ₹7.4 L
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM