TenderDekho Logo
GEM

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited energy equipment procurement tender Sonbhadra UP 2026

Bid Publish Date

02-Mar-2026, 8:37 pm

Bid End Date

17-Mar-2026, 9:00 pm

EMD

₹60,000

Value

₹30,88,630

Progress

Issue02-Mar-2026, 8:37 pm
Technical17-03-2026 18:01:06
Financial
Award18-Apr-2026, 4:34 am
Explore all 4 tabs to view complete tender details

Quantity

11696

Category

OH of GB of Conv. 4,10,11,12,15,16,K10

Bid Type

Two Packet Bid

Categories 76

Tender Overview

The Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL) solicits bids for a broad energy equipment procurement project in Sonbhadra, Uttar Pradesh. The contract value is estimated at ₹3,088,630 with an EMD of ₹60,000. The BoQ lists a total of 176 items, though individual item descriptions are not disclosed in the provided data. This tender includes a purchaser option to adjust quantity by up to 25% during both initial and currency periods, under contracted rates, with delivery timing tied to the last delivery order date. The absence of item-specific specs necessitates tightly aligned bid planning around scope interpretation and delivery scheduling.

Technical Specifications & Requirements

  • Total Items: 176 (Item details not specified in the data)
  • Estimated Value: ₹3,088,630
  • EMD: ₹60,000
  • Location: Sonbhadra, Uttar Pradesh (231205)
  • Delivery/Option Clause: Quantity can be increased/decreased by up to 25%; extended delivery time formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extension may continue up to original delivery period
  • No item-level specifications provided; bidders should prepare for broad scope interpretation and confirm delivery capabilities, with emphasis on compliance and delivery scheduling to meet site requirements

Terms & Eligibility

  • Delivery Clause: Options to adjust quantity up to 25% and extend delivery time accordingly
  • EMD: ₹60,000 (payment and submission methods to be confirmed in ATC)
  • Bid Documentation: Prepare standard bidder pack including GST and PAN; experience certificates; financial statements; EMD submission; technical bid; OEM authorizations if applicable
  • Bidder should review ATC uploaded document for any additional terms and conditions
  • No start/end dates provided; bidders must await further communication for timeline alignment

Key Specifications

    • Total Items: 176 (item-level details not disclosed)
    • Estimated Value: ₹3,088,630
    • EMD: ₹60,000
    • Location: Sonbhadra, Uttar Pradesh
    • Delivery/Option Clause: ±25% quantity adjustment; extended delivery time formula as specified
    • Standards/Certifications: Not specified in data; bidders should seek ATC for any mandatory certifications

Terms & Conditions

  • Key term: Quantity may be increased or decreased by up to 25% at contract placement and during currency.

  • Key term: Delivery period adjustments follow a defined formula with a minimum 30 days.

  • Key term: EMD of ₹60,000; bidders must provide EMD submission proof and related documents.

Important Clauses

Payment Terms

Payment terms not detailed in data; ATC may specify mode and schedule. Prepare for standard government practices post-delivery performance and acceptance.

Delivery Schedule

Delivery shall commence from the last date of the original delivery order; extension time computed as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days.

Penalties/Liquidated Damages

Penalty details not provided in data; ATC may include LDs for late delivery or non-compliance with scope.

Bidder Eligibility

  • Demonstrated experience in supplying energy equipment for government or utility projects

  • Valid GST registration and PAN

  • Financial stability evidenced by 3-year financial statements

  • Ability to meet delivery timelines and bulk quantity fluctuations per 25% option clause

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

ENERGY DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 6

GeM-Bidding-9060857.pdf

Main Document

Other Documents

OTHER

BOQ Document

BOQ

BOQ Document

BOQ

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Government Tender Published for Restoration of rain damages of LWSS Solan from Ashwani Khad Tehsil and Distt. Solan in SOLAN, HIMACHAL PRADESH

HP Irrigation and Public Health

SOLAN, HIMACHAL PRADESH

Posted: 3 March 2026
Closed: 13 March 2026
EPROCURE

Motor pulley,Motor Bearing,Bearing shaft,Motor 1HP

Indian Army

PATIALA, PUNJAB

Posted: 23 January 2025
Closed: 13 February 2025
GEM

Bearing 2 Pcs Labour charge work,10 Mtrs 2 core Cable,Rolling Ribbing,Roller Alignment,Roller Fitti

Indian Army

BANGALORE, KARNATAKA

Posted: 30 January 2026
Closed: 12 February 2026
GEM

MECHANICAL BEARING PULLER, MODEL: TMMA 80, MAKE: SKF/FAG/ZKL

Armoured Vehicles Nigam Limited

MEDAK, TELANGANA

Posted: 12 July 2025
Closed: 1 August 2025
GEM

BEARING FOR BEND PULLEY,BEARING FOR HEAD PULLEY,BEARING FOR TAIL UP PULLEY

National Aluminium Company Limited, Bhubaneswar

ANGUL, ODISHA

Posted: 29 May 2025
Closed: 26 June 2025
GEM

Bill of Quantities (BOQ) 176 Items Sign in for GEM prices

#1

Bearing replacement work

Bearing replacement work

9 jobs Delivery: 273 days
#2

Gravity pulley replacement work

Gravity pulley replacement work

6 jobs Delivery: 273 days
#3

Pollard Bearing replacement work

Pollard Bearing replacement work

38 jobs Delivery: 273 days
#4

Pulley Shaft Repairing work

Pulley Shaft Repairing work

18 jobs Delivery: 273 days
#5

Repairing of guide rollers

Repairing of guide rollers

15 nos Delivery: 273 days
#6

Greasing of trough return Rollers

Greasing of trough/return Rollers

3,000 nos Delivery: 273 days
#7

Conveyor Chute patch work

Conveyor Chute patch work

180 nos Delivery: 273 days
#8

8,9AB Box duct side packing replacement

8,9A/B Box duct side packing replacement

23 jobs Delivery: 273 days
#9

Replacement of box duct side packing

Replacement of box duct side packing

38 jobs Delivery: 273 days
#10

Replacement of FCU

Replacement of FCU

15 jobs Delivery: 273 days
#11

Repairing of FCU

Repairing of FCU

33 jobs Delivery: 273 days
#12

Replacement of resielent plate of FCU

Replacement of resielent plate of FCU

30 jobs Delivery: 273 days
#13

Replacement of chute inspection door

Replacement of chute inspection door

5 jobs Delivery: 273 days
#14

Fabrication of chute inspection door

Fabrication of chute inspection door

5 jobs Delivery: 273 days
#15

Fabr Instal Of coal centering plate

Fabr/Instal Of coal centering plate

30 jobs Delivery: 273 days
#16

Fabr Instal Of Flap Gate

Fabr/Instal Of Flap Gate

15 jobs Delivery: 273 days
#17

Greasing of pollard covered bearing

Greasing of pollard/covered bearing

1,050 nos Delivery: 273 days
#18

Replacement of Trough structures

Replacement of Trough structures

38 nos Delivery: 273 days
#19

Replacement of impact structures

Replacement of impact structures

15 nos Delivery: 273 days
#20

Replacement trough roller except 8,9AB

Replacement trough roller except 8,9A/B

230 nos Delivery: 273 days
#21

Trough roller replacement Conv. 8,9AB

Trough roller replacement Conv. 8,9A/B

53 nos Delivery: 273 days
#22

Return roller replacement Conv. 4AB

Return roller replacement Conv. 4A/B

38 nos Delivery: 273 days
#23

Return roller replacement Conv 15,16etc

Return roller replacement Conv. 15,16etc

38 nos Delivery: 273 days
#24

Return roller replacement Conv 10,11,12

Return roller replacement Conv. 10,11&12

38 nos Delivery: 273 days
#25

Return roller replacement Conv 8AB, 9AB

Return roller replacement Conv. 8AB, 9AB

38 nos Delivery: 273 days
#26

return roller Replacement of SR,K10,16

return roller Replacement of S/R,K10,16

23 nos Delivery: 273 days
#27

Repair of Trough Roller Structure

Repair of Trough Roller Structure

38 nos Delivery: 273 days
#28

Repair of Impact Roller Structure

Repair of Impact Roller Structure

15 nos Delivery: 273 days
#29

Trough Roller Re fixing Convy 4AB

Trough Roller Re-fixing Convy. 4A/B.

75 nos Delivery: 273 days
#30

Impact Roller Re fixing Convy 4AB

Impact Roller Re-fixing Convy. 4A/B.

30 nos Delivery: 273 days
#31

Return Roller Re fixing Convy 4AB

Return Roller Re-fixing Convy. 4A/B.

30 nos Delivery: 273 days
#32

Guide roller replacement

Guide roller replacement

15 nos Delivery: 273 days
#33

Repairing of damaged guide channel

Repairing of damaged guide channel

75 mtrs Delivery: 273 days
#34

Topping up of oil in GB

Topping -up of oil in G/B

15 jobs Delivery: 273 days
#35

Topping up of oil in FCU

Topping -up of oil in FCU

15 jobs Delivery: 273 days
#36

Removal of trapped belt from box duct

Removal of trapped belt from box duct

15 jobs Delivery: 273 days
#37

ReplaceTighten FCU bolt

Replace/Tighten FCU bolt

38 jobs Delivery: 273 days
#38

4,8,9,10,11, 12 Snub pulley replacement

4,8,9,10,11&12 Snub pulley replacement

6 jobs Delivery: 273 days
#39

4,9 , 10 Inter Pulley replacement

4,9 & 10 Inter. Pulley replacement

2 jobs Delivery: 273 days
#40

4,8,9,10 etc Bend pulley replacement

4,8,9,10 etc. Bend pulley replacement

8 jobs Delivery: 273 days
#41

4,8,9,10,11,12 Tail pulley replacement

4,8,9,10,11&12 Tail pulley replacement

3 jobs Delivery: 273 days
#42

15,17 boom Tail pulley replacement

15,17 & boom Tail pulley replacement

3 jobs Delivery: 273 days
#43

Tipper Head Bend pulley replacement

Tipper Head/Bend pulley replacement

3 jobs Delivery: 273 days
#44

8,9 K10 etc Drive Pulley replacement

8,9 & K10 etc. Drive Pulley replacement

3 jobs Delivery: 273 days
#45

Conv 4, 10 Drive Pulley replacement

Conv. 4&10 Drive Pulley replacement

3 jobs Delivery: 273 days
#46

Replacement of Scrapper assly

Replacement of Scrapper assly

5 jobs Delivery: 273 days
#47

Replacement of duct packing

Replacement of duct packing

30 jobs Delivery: 273 days
#48

Adjustment of Conv

Adjustment of Conv.

30 jobs Delivery: 273 days
#49

RCB grid rod fixing

RCB grid rod fixing

150 nos Delivery: 273 days
#50

Replacing Hood Cover of Head Pulley

Replacing Hood Cover of Head Pulley

6 nos Delivery: 273 days
#51

Replacing Hood Cover of Tail Pulley

Replacing Hood Cover of Tail Pulley

5 nos Delivery: 273 days
#52

Self aligning structure OH

Self aligning structure O/H

15 nos Delivery: 273 days
#53

Fab Inst of 2M side plates of box duct

Fab./Inst. of 2M side plates of box duct

5 jobs Delivery: 273 days
#54

Fab Inst of side plates more than 2M

Fab./Inst. of side plates more than 2M

5 jobs Delivery: 273 days
#55

Fab Inst of back plate

Fab./Inst. of back plate

8 jobs Delivery: 273 days
#56

Align of motor to GB

Align. of motor to G/B

30 jobs Delivery: 273 days
#57

Removal of top cover of Helical GB

Removal of top cover of Helical G/B

5 jobs Delivery: 273 days
#58

Maint Work of GB

Maint. Work of G/B

5 jobs Delivery: 273 days
#59

Replacement of IP Shaft Brg of GB

Replacement of I/P Shaft/Brg. of G/B

9 jobs Delivery: 273 days
#60

Replacement of the output wheel of GB

Replacement of the output wheel of G/B

5 jobs Delivery: 273 days
#61

Repairing of Hold Back

Repairing of Hold Back

6 jobs Delivery: 273 days
#62

Replacement of GB

Replacement of G/B

2 jobs Delivery: 273 days
#63

OH of GB of Conv. 4,10,11,12,15,16,K10

O/H of G/B of Conv. 4,10,11,12,15,16&K10

12 jobs Delivery: 273 days
#64

OH of GB of Conv 8 , 9

O/H of G/B of Conv. 8 & 9

5 jobs Delivery: 273 days
#65

OH of GB of Tripper

O/H of G/B of Tripper

3 jobs Delivery: 273 days
#66

Re railment of 2 W Align of Tripper

Re-railment of 2-W & Align. of Tripper

6 jobs Delivery: 273 days
#67

Rerailment of 4 W , Align of Tripper

Re-railment of 4-W & Align. of Tripper

2 jobs Delivery: 273 days
#68

Repairing work of square bar of Tripper

Repairing work of square bar of Tripper

75 mtrs Delivery: 273 days
#69

Repairing of Broken Chain of Tripper

Repairing of Broken Chain of Tripper

38 jobs Delivery: 273 days
#70

Replacement of Chain Sprocker of Tripper

Replacement of Chain Sprocker of Tripper

9 jobs Delivery: 273 days
#71

Replacement of Chain of Tripper

Replacement of Chain of Tripper

9 set Delivery: 273 days
#72

Replacement of GB of Tripper

Replacement of G/B of Tripper

3 jobs Delivery: 273 days
#73

Replacement of axle of Tripper

Replacement of axle of Tripper

2 jobs Delivery: 273 days
#74

Fab. of vertical support of Tripper

Fab. of vertical support of Tripper

75 nos Delivery: 273 days
#75

Fab of middle support of Tripper

Fab. of middle support of Tripper

75 nos Delivery: 273 days
#76

Leaving of squre bar channel bolting

Leaving of squre bar channel & bolting.

450 mtrs Delivery: 273 days
#77

Oil filling Insp of GB of Conv Syt

Oil filling & Insp. of G/B of Conv. Syt.

23 jobs Delivery: 273 days
#78

Repairing OH of Sump Pump K10 ,17

Repairing/OH of Sump Pump-K10 & 17

2 jobs Delivery: 273 days
#79

Repairing of gravity Take up box

Repairing of gravity Take-up box

5 jobs Delivery: 273 days
#80

Assly of spare pulley with bearing

Assly of spare pulley with bearing.

5 jobs Delivery: 273 days
#81

Replacement of damaged slewing pinion

Replacement of damaged slewing pinion

5 jobs Delivery: 273 days
#82

Repl of shaft oil seal of slewing GB

Repl. of shaft/oil seal of slewing G/B.

5 nos Delivery: 273 days
#83

Trough Roller repairing Overhauling

Trough Roller repairing/Overhauling

3,000 nos Delivery: 273 days
#84

Return Roller repairing Overhauling

Return Roller repairing/Overhauling

600 nos Delivery: 273 days
#85

Impact Roller repairing Overhauling

Impact Roller repairing/Overhauling

225 nos Delivery: 273 days
#86

Dismant replace of coupling of Pusher

Dismant. & replace of coupling of Pusher

3 jobs Delivery: 273 days
#87

Repl repair of support pipe of OH cond

Repl./repair of support pipe of O/H cond

12 jobs Delivery: 273 days
#88

Replacement of stay wire turn buckle

Replacement of stay wire & turn buckle.

38 nos Delivery: 273 days
#89

Alignment of conductor pole

Alignment of conductor pole.

15 nos Delivery: 273 days
#90

Alignment with motor and commissioning

Alignment with motor and commissioning

3 nos Delivery: 273 days
#91

replacement of damage wheels shaft gear

replacement of damage wheels shaft &gear

3 nos Delivery: 273 days
#92

Dismantling replacement break system

Dismantling & replacement break system

3 jobs Delivery: 273 days
#93

counter weight placing in position

counter weight placing in position

2 jobs Delivery: 273 days
#94

Dismant replace of coupling of WT

Dismant. & replace of coupling of W/T

3 jobs Delivery: 273 days
#95

Repair of damaged top beam of WT

Repair of damaged top beam of W/T

3 jobs Delivery: 273 days
#96

Replacement of damaged top beam of WT

Replacement of damaged top beam of W/T

3 jobs Delivery: 273 days
#97

Repairing of connecting arms of WT

Repairing of connecting arms of W/T

3 jobs Delivery: 273 days
#98

Re setting of displaced rest wall

Re-setting of displaced rest wall

6 jobs Delivery: 273 days
#99

Replacement repair of side jack

Replacement/ repair of side jack

6 jobs Delivery: 273 days
#100

Re setting of steel plate f top beam

Re-setting of steel plate f top beam.

15 mtr Delivery: 273 days
#101

Servicing of side centre wheels of WT

Servicing of side centre wheels of W/T

3 jobs Delivery: 273 days
#102

Replacement of platform rails with clits

Replacement of platform rails with clits

6 jobs Delivery: 273 days
#103

replacement of cage ribs stiffeners

replacement of cage ribs /stiffeners.

6 jobs Delivery: 273 days
#104

Repair of round of side box beam

Repair of round of side box beam

3 jobs Delivery: 273 days
#105

Replacement of platform angle

Replacement of platform angle.

15 jobs Delivery: 273 days
#106

Repair of shock absorbers

Repair of shock absorbers

3 jobs Delivery: 273 days
#107

Replacement of platform plate

Replacement of platform plate.

30 sqmtr Delivery: 273 days
#108

Repairing of mesh jolly of WT

Repairing of mesh/jolly of W/T

3 jobs Delivery: 273 days
#109

replacement parts alignment of motor

replacement parts & alignment of motor

3 jobs Delivery: 273 days
#110

Repair Replacement of break system

Repair & Replacement of break system

3 jobs Delivery: 273 days
#111

repair replacement of guide rollers

repair & replacement of guide rollers

3 jobs Delivery: 273 days
#112

Replacement of packing on top beam

Replacement of packing on top beam.

3 jobs Delivery: 273 days
#113

replacement of side jacks , rest walls

replacement of side jacks, rest walls

3 jobs Delivery: 273 days
#114

OH replacement rest rollers and cradle

O/H ,replacement rest rollers and cradle

3 jobs Delivery: 273 days
#115

Replacement repair of platform rails

Replacement/repair of platform rails

3 jobs Delivery: 273 days
#116

overhauling and alignment motor of BF

overhauling and alignment motor of B/F

3 jobs Delivery: 273 days
#117

Replacement of structure of BF

Replacement of structure of B/F

3 jobs Delivery: 273 days
#118

Replacement of adjt bolt of belt feeder

Replacement of adjt. bolt of belt feeder

3 jobs Delivery: 273 days
#119

overhauling of SF replace damage part

overhauling of S/F & replace damage part

3 jobs Delivery: 273 days
#120

Repairing of mesh jolly of Swing Feeders

Repairing of mesh/jolly of Swing Feeders

3 jobs Delivery: 273 days
#121

OH replace parts of drum of Conv 1

O/H & replace parts of drum of Conv. 1

3 jobs Delivery: 273 days
#122

OH replace parts of drum Conveyor 2

O/H & replace parts of drum Conveyor 2

3 jobs Delivery: 273 days
#123

OH replace parts of drumCon 3 K13

O/H & replace parts of drumCon 3 / K13

3 jobs Delivery: 273 days
#124

OH replace parts of drum Conveyor 6

O/H & replace parts of drum Conveyor 6

3 jobs Delivery: 273 days
#125

OH replace parts of drum Conveyor 7

O/H & replace parts of drum Conveyor 7

3 jobs Delivery: 273 days
#126

OH replace parts of drum Conveyor 8

O/H & replace parts of drum Conveyor 8

3 jobs Delivery: 273 days
#127

OH replace parts of drum Conveyor 9

O/H & replace parts of drum Conveyor 9

3 jobs Delivery: 273 days
#128

Repair servicing of trolly of Conv 1

Repair & servicing of trolly of Conv 1

3 jobs Delivery: 273 days
#129

Repair servicing of trolly of Conv 2

Repair & servicing of trolly of Conv 2

3 jobs Delivery: 273 days
#130

Repair servicing of trolly Conv 3K13

Repair & servicing of trolly Conv 3/K13

5 jobs Delivery: 273 days
#131

Repair servicing of trolly of Conv 6

Repair & servicing of trolly of Conv 6

3 jobs Delivery: 273 days
#132

Repair servicing of trolly of Conv 7

Repair & servicing of trolly of Conv 7

3 jobs Delivery: 273 days
#133

Repair servicing of trolly of Conv 8

Repair & servicing of trolly of Conv 8

3 jobs Delivery: 273 days
#134

Repair servicing of trolly of Conv 9

Repair & servicing of trolly of Conv 9

3 jobs Delivery: 273 days
#135

Replacement belt tensioning sys Conv 1

Replacement belt tensioning sys. Conv 1

3 jobs Delivery: 273 days
#136

Replacement belt tensioning sys Conv 2

Replacement belt tensioning sys. Conv 2

3 jobs Delivery: 273 days
#137

Replacement belt tensioning Conv 3 ,13

Replacement belt tensioning Conv 3/13

3 jobs Delivery: 273 days
#138

Replacement belt tensioning sys Conv 6

Replacement belt tensioning sys. Conv 6

3 jobs Delivery: 273 days
#139

Replacement belt tensioning sys Conv 7

Replacement belt tensioning sys. Conv 7

5 jobs Delivery: 273 days
#140

Replacement belt tensioning sys Conv 8

Replacement belt tensioning sys. Conv 8

3 jobs Delivery: 273 days
#141

Replacement belt tensioning sys Conv 9

Replacement belt tensioning sys. Conv 9

3 jobs Delivery: 273 days
#142

Making of fasteners joint conv and BF

Making of fasteners joint conv. and B/F

9 jobs Delivery: 273 days
#143

Shifting laying of conv belt F J

Shifting & laying of conv. belt F.J.

75 jobs Delivery: 273 days
#144

greasing of Drums up to dia 630 mm

greasing of Drums up to dia. 630 mm

38 mtr Delivery: 273 days
#145

greasing of Drums dia 630 1000 mm

greasing of Drums dia. 630-1000 mm

23 nos Delivery: 273 days
#146

greasing of Drums dia 1000 1290mm

greasing of Drums dia1000-1290mm

15 nos Delivery: 273 days
#147

Replacement of Drum up to dia 630mm

Replacement of Drum up to dia 630mm

6 nos Delivery: 273 days
#148

Replacement of Drum dia 630mm 1000mm

Replacement of Drum dia 630mm-1000mm

3 nos Delivery: 273 days
#149

Replacement of Drum up to 1000 1290mm

Replacement of Drum up to 1000-1290mm

2 nos Delivery: 273 days
#150

re fitting of shaft of drum dia 630mm

re-fitting of shaft of drum dia 630mm

3 nos Delivery: 273 days
#151

re fitting of shaft of drum 630 1000mm

re-fitting of shaft of drum 630-1000mm

3 nos Delivery: 273 days
#152

re fitting of shaft of drum 1000 1290mm

re-fitting of shaft of drum 1000-1290mm

3 nos Delivery: 273 days
#153

Re fitting at BRG portions of drums 630mm

Refitting at BRG portions of drums 630mm

3 nos Delivery: 273 days
#154

Re fitting at BRG drums

Refitting at BRG portion of drums more 630mm

6 nos Delivery: 273 days
#155

replacement damper gate reducer system

replacement damper gate reducer system

6 nos Delivery: 273 days
#156

replacement damper gate system NEW

replacement damper gate system NEW

2 jobs Delivery: 273 days
#157

Fabrication ,erection centering plate

Fabrication & erection centering plate

5 jobs Delivery: 273 days
#158

Fbr repairing chute inspection door

Fbr. & repairing chute inspection door

5 jobs Delivery: 273 days
#159

Repairing of chute by patching of holes

Repairing of chute by patching of holes

90 jobs Delivery: 273 days
#160

OH of 20 MT capacity crane conveyor 2

O/H of 20 MT capacity crane conveyor 2

2 jobs Delivery: 273 days
#161

OH of 20 MT capacity crane WT

O/H of 20 MT capacity crane W/T

2 jobs Delivery: 273 days
#162

erec. new charging plate duct of conv 2

erec. new charging plate duct of conv 2

3 jobs Delivery: 273 days
#163

repair of angle of conveyor structure

repair of angle of conveyor structure.

195 jobs Delivery: 273 days
#164

repair of channel of conveyor structure

repair of channel of conveyor structure.

75 mtr Delivery: 273 days
#165

Replacement rubber scrapper duct skirt

Replacement rubber scrapper duct skirt

75 mtr Delivery: 273 days
#166

Replacement box duct packing SF, 3AB

Replacement box duct packing S/F & 3A/B

38 nos Delivery: 273 days
#167

Replacement box duct packing other

Replacement box duct packing other

38 nos Delivery: 273 days
#168

Replacement of structure of conv

Replacement of structure of conv

75 nos Delivery: 273 days
#169

Fabrication erection of steel scrapper

Fabrication& erection of steel scrapper

12 jobs Delivery: 273 days
#170

Alignment of 20KW to 50KW motor

Alignment of 20KW to 50KW motor

6 nos Delivery: 273 days
#171

Alignment of 51 to 100KW motor

Alignment of 51 to 100KW motor

6 nos Delivery: 273 days
#172

Alignment of 101KW to 199KW motor

Alignment of 101KW to 199KW motor

6 nos Delivery: 273 days
#173

Alignment of above 200KW HT motor

Alignment of above 200KW HT motor

3 nos Delivery: 273 days
#174

OH of de-watering pump at various site

O/H of de-watering pump at various site

8 nos Delivery: 273 days
#175

MISC Picking of foreign materials

MISC. Picking of foreign materials

9 nos Delivery: 273 days
#176

Minor misc Repairing work

Minor/misc. Repairing work

188 jobs Delivery: 273 days

Required Documents

1

GST registration certificate

2

Permanent Account Number (PAN) card

3

Experience certificates in similar energy equipment procurement

4

Financial statements (last 3 years)

5

EMD submission document (DD/online remittance proof)

6

Technical bid documents and compliance statements

7

OEM authorizations or resale certificates (if applicable)

8

Any ATC or tender-specific compliance certificates

Technical Results

S.No Seller Item Date Status
1
BHARAT TECHNO ENGINEERING   Under PMA
-17-03-2026 18:01:06
2
M/S DEEN DAYAL   Under PMA
-15-03-2026 18:22:18
3
S K ENGINEERING WORKS   Under PMA
-16-03-2026 14:35:46

Financial Results

Rank Seller Price Item
L1
M/S DEEN DAYAL   Under PMA
Item Categories : Bearing replacement work,Gravity pulley replacement work,Pollard Bearing replacement work,Pulley Sh
L2
S K ENGINEERING WORKS   Under PMA
Item Categories : Bearing replacement work,Gravity pulley replacement work,Pollard Bearing replacement work,Pulley Sh

Contract / Result Documents 2

Please sign in or create an account to view contract details and download result documents.

Frequently Asked Questions

Key insights about UTTAR PRADESH tender market

How to bid in the energy equipment tender in Sonbhadra UP 2026

Bidders must submit GST registration, PAN, experience certificates, and financial statements along with the EMD of ₹60,000. Ensure the Technical Bid meets compliance criteria in the ATC and confirm OEM authorizations if required. Review the 25% quantity option and delivery formula before submission.

What documents are required for UP energy procurement in Sonbhadra

Required documents include GST certificate, PAN card, experience certificates for similar projects, last 3 years financial statements, EMD proof, technical bid, and OEM authorizations if applicable. ATC may demand additional certificates; ensure all are valid and current.

What is the EMD amount for the UP energy tender 2026

The declared EMD is ₹60,000. Submit via online payment or demand draft as per ATC instructions. Include EMD details with the bid package and ensure the amount remains valid through bid submission and any extensions.

What are the delivery terms for quantity adjustments in UP RUVNL tender

The purchaser may adjust quantity by ±25% at contract award and during currency. Delivery time is recalculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days; extensions may continue up to the original delivery period.

What standards or certifications are required for this UP tender

No specific standards are listed in the available data; ATC may require standard compliance or OEM certifications. Prepare to provide compliance statements and any applicable ISI/ISO credentials if requested in the ATC.

How is payment expected after delivery for this UP tender 2026

Payment terms are not explicitly stated in the provided data. Bidder should refer to the ATC for a detailed payment schedule, including stages such as delivery acceptance, performance checks, and schedule of payments post-acceptance.

What is the scope of the 176-item BoQ in the UP tender

BoQ lists 176 items; item-level details are not disclosed here. Bidders should seek the ATC or clarifications to map items to standard specifications and align procurement capacity with the 25% option clause and delivery expectations.

Similar Tenders

5 found

Bearing Housing Block,C. I. Pulley (Complete)

Central Board Of Excise And Customs (cbec)

📍 GHAZIPUR, UTTAR PRADESH

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM
Urgent

Bids are Invited For (1) COMPLETE REWINDING/REPAIRING OF 120 HP,440 VOLT,1485 RPM,MAKE SIMENS TYPE-FLP,SL.NO.64522625 AND REPAIRING/MACHINING AND MOTOR SHAFT BOTH SIDE AND THREADING KEY SIZE MAKING OF BEARING in DHANBAD, JHARKHAND

Bharat Coking Coal Limited

📍 DHANBAD, JHARKHAND

EMD: ₹6,800
Est: ₹5.4 L
⏰ Deadline: 6 days left
🛒 Type: Works
View EPROCURE
Urgent

Omega 77 EP Bearing and Chassis grease (Standard 5 Kg Bucket)

Nuclear Power Corporation Of India Limited

📍 UTTARA KANNADA, KARNATAKA

⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM
Urgent

Indian Army Bearings and Mechanical Components Tender Jammu Jammu & Kashmir 2026

Indian Army

📍 JAMMU, JAMMU & KASHMIR

⏰ Deadline: 7 days left
🛒 Type: Goods
View GEM

NMDC Steel Limited Bearing Block Assemblies Tender 2026 – 25% Quantity Flexibility, EMD ₹20,000

Nmdc Steel Limited

📍 BASTAR, CHHATTISGARH

EMD: ₹20,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM