East Central Railway Online UPS 10 KVA with Battery Tender IS 16242 Part 1 2025
East Central Railway
Bid Publish Date
01-Jan-2026, 5:41 pm
Bid End Date
12-Jan-2026, 6:00 pm
Progress
Quantity
1
Bid Type
Two Packet Bid
Organization: Saha Institute Of Nuclear Physics (Department Of Atomic Energy) seeks an Online UPS 10 KVA with battery conforming to IS 16242 (Part 1). The scope includes Supply, Installation, Testing and Commissioning with an estimated contract value not disclosed. Delivery must occur within 30 days of GeM contract issuance. Bid validity is 120 days. The equipment must support 50 Hz input/output and include an inbuilt isolation transformer if specified. Unique emphasis on service capability and post-installation support distinguishes this tender. This procurement is issued via GeM for rapid government sourcing, targeting qualified UPS suppliers with IS 16242 compliance and robust service networks.
10 KVA UPS unit with IS 16242 (Part 1) compliance
Input/Output: AC 50 Hz
Inbuilt isolation transformer (if specified in build)
Battery type: specified by vendor per IS 16242; backup time as per configuration
Delivery/installation within 30 days; 100% payment after acceptance
12 months onsite warranty; 24 months battery replacement warranty
Delivery/installation within 30 days of GeM contract
100% payment after final acceptance
12 months UPS warranty and 24 months battery replacement warranty
100% payment after delivery, successful installation and acceptance
Delivery and installation must be completed within 30 days from GeM contract issuance
Not specified in provided data
Proven experience in supplying and installing UPS systems (10 KVA scale) for government or large institutional clients
Demonstrated IS 16242 (Part 1) compliance
Availability of service centers or ability to establish within 30 days of award
East Central Railway
South Western Railway
Accountant General, Sikkim
Indian Air Force
AMRITSAR, PUNJAB
Airports Authority Of India
COIMBATORE, TAMIL NADU
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| Performance Parameters | Rating (in KVA) | 6 |
| Performance Parameters | Input Voltage (AC, 50 Hz) | Single Phase, 160V - 260V |
| Performance Parameters | Output Voltage (AC, 50 Hz) | Single Phase, 230V±1%, |
| Construction | Availability of Inbuilt Isolation Transformer | Yes |
| Battery/Backup Bank | Type of Battery | SMF-VRLA (Sealed Maintenance Free-Valve Regulated Lead Acid) / Stationary Lead Acid Batteries |
| Battery/Backup Bank | Backup Time | 240.0 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar UPS installations
Financial statements demonstrating financial stability
EMD/Security deposit (if applicable to tender via GeM)
Technical bid documents confirming IS 16242 compliance
OEM authorization/parts availability
Evidence of functional service centre or plan to establish within 30 days
Bidders must demonstrate IS 16242 (Part 1) compliance, provide experience with 10 KVA UPS installations, possess GST and PAN, and show ability to establish a service centre within 30 days of award. A 120-day bid validity and 30-day delivery window apply, with 100% payment on acceptance.
Prepare bid with IS 16242 compliance documents, OEM authorization, service centre evidence, and financial statements. Include detailed delivery plan of 30 days, installation/commissioning schedule, and warranty terms: 12 months onsite for UPS, 24 months battery replacement.
Submit GST certificate, PAN card, experience certificates for UPS installations, financial statements, technical compliance certificates, OEM authorizations, and evidence of a functional service centre or plan to establish within 30 days of award.
Units must be 10 KVA, with input/output 50 Hz AC, possible inbuilt isolation transformer, and specified battery type. Backup time varies by configuration; ensure IS 16242 (Part 1) compliance and provide testing/commissioning results at delivery.
The tender data does not specify a fixed EMD amount; bidders should refer to GeM general terms for EMD requirements and ensure compliance with any security deposit as per GeM guidelines and organization-specific ATCs.
Delivery and installation must be completed within 30 days from the date of GeM contract issuance. Successful installation and acceptance trigger 100% payment terms; ensure readiness of installation teams and site access.
The tender requires 12 months onsite warranty for the UPS unit and 24 months replacement warranty for batteries from installation/acceptance date. Replacement during warranty should be at no cost and timely at site.
Bidder must have a dedicated toll-free service line and a clear escalation matrix. If no local service centre, establish one within 30 days of award and provide documentary evidence before payment milestones.
N/a
📍 ROHTAK, HARYANA
Central Board Of Direct Taxes (cbdt)
📍 JAIPUR, RAJASTHAN
Southern Railway
📍 CHENNAI, TAMIL NADU
N/a
📍 NORTH DELHI, DELHI
N/a
📍 IDUKKI, KERALA
Sign up now to access all documents
Main Document
CATALOG Specification
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS