Indian Army Piston Ring Set & Mechanical Parts Tender 2026 in India - IS/IS0 Standards Not Specified
Indian Army
Bid Publish Date
06-Feb-2026, 5:44 pm
Bid End Date
16-Feb-2026, 6:00 pm
Location
Progress
Quantity
165
Category
Fuel filter Primary and secondary
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a broad catalogue of spare parts including fuel filters, tubes, fuses, ignition switches, alternators, hoses, bearings, O rings, clamps, wires, valves, gear levers, seals, and related accessories. Estimated value not disclosed; 65 items listed in the BOQ, with supply and installation scope across multiple item types. Key differentiators include a requirement for Detailed Design Drawings approval within 5 days of contract award and an option clause enabling quantity adjustments of up to ±25% at contracted rates. The procurement emphasizes availability of non-obsolete products with 2+ years residual market life and strict compliance with OEM applicability.
65 BOQ items spanning fuel filters, tubes, fuses, ignition switches, alternators, hoses, bearings, O rings, clamps, wires, valves, oil seals, shafts and related components
Delivery terms tied to approval of Detailed Design Drawings within 5 days of award
Option clause enabling ±25% quantity variation with extended delivery period formula
Bidder must demonstrate 3 years of government/PSU supply experience with relevant contracts
Products must not be declared end-of-life by OEM for at least 2 years from bid opening
Option clause allows up to 25% quantity change at contracted rates
Approval of Detailed Design Drawings within 5 days post-award
3 years govt/PSU supply experience required
Not specified in tender text; standard government terms likely apply per contract
Delivery timeline linked to approved drawings; extended delivery period calculated as (increased quantity ÷ original quantity) × original delivery period, minimum 30 days
Not explicitly stated; LD terms usually defined in contract following approval of drawings
3 years of regular manufacture/supply of similar category products to Central/State Govt Organizations or PSUs
No liquidation or bankruptcy status; valid undertaking
Not obsolete products; minimum 2 years residual market life per OEM
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
Indian Army
JHANSI, UTTAR PRADESH
Indian Army
TINSUKIA, ASSAM
Indian Army
BUDGAM, JAMMU & KASHMIR
Indian Army
BUDGAM, JAMMU & KASHMIR
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Fuel filter Primary and secondary | Fuel filter Primary and secondary | 1 | set | pranayraj | 30 |
| 2 | Tube for wheel | Tube for wheel | 1 | nos | pranayraj | 30 |
| 3 | Fuse 15Amp | Fuse 15Amp | 5 | nos | pranayraj | 30 |
| 4 | Fuse 20Amp | Fuse 20Amp | 5 | nos | pranayraj | 30 |
| 5 | Accelerator wire | Accelerator wire | 1 | nos | pranayraj | 30 |
| 6 | Alternator 12V | Alternator 12V | 1 | nos | pranayraj | 30 |
| 7 | Suction Valve NRV | Suction Valve NRV | 1 | nos | pranayraj | 30 |
| 8 | Starter Relay 220V | Starter Relay 220V | 1 | nos | pranayraj | 30 |
| 9 | Hose clamp | Hose clamp | 2 | nos | pranayraj | 30 |
| 10 | Oil cooler hose pipe outlet | Oil cooler hose pipe outlet | 4 | nos | pranayraj | 30 |
| 11 | Oil cooler hose pipe inlet | Oil cooler hose pipe inlet | 4 | nos | pranayraj | 30 |
| 12 | Iron tray for test beds | Iron tray for test beds | 2 | nos | pranayraj | 30 |
| 13 | Flexible pipe | Flexible pipe | 10 | mtr | pranayraj | 30 |
| 14 | Suction filter assy | Suction filter assy | 1 | nos | pranayraj | 30 |
| 15 | Winch rope | Winch rope | 7 | mtr | pranayraj | 30 |
| 16 | O ring | O ring | 4 | nos | pranayraj | 30 |
| 17 | Coupling | Coupling | 1 | nos | pranayraj | 30 |
| 18 | Ignition switch | Ignition switch | 1 | nos | pranayraj | 30 |
| 19 | PCB plate | PCB plate | 1 | nos | pranayraj | 30 |
| 20 | On off switch 30 Amp | Oil seal with O ring and washer | 1 | nos | pranayraj | 30 |
| 21 | Nozzle with adaptor | Nozzle with adaptor | 1 | nos | pranayraj | 30 |
| 22 | High Pressure Hose R 1600 long | High Pressure Hose R 1600 long | 1 | nos | pranayraj | 30 |
| 23 | Ball bearing 6204 | Ball bearing 6204 | 2 | nos | pranayraj | 30 |
| 24 | Valve | Valve | 1 | nos | pranayraj | 30 |
| 25 | Clamp | Clamp | 1 | nos | pranayraj | 30 |
| 26 | Calibration oil | Calibration oil | 60 | ltr | pranayraj | 30 |
| 27 | Armature with bearing | Armature with bearing | 1 | nos | pranayraj | 30 |
| 28 | Carbon brush | Carbon brush | 1 | set | pranayraj | 30 |
| 29 | Gear lever Small | Gear lever Small | 1 | nos | pranayraj | 30 |
| 30 | Oil filter | Oil filter | 1 | nos | pranayraj | 30 |
| 31 | Bush with bearing | Bush with bearing | 1 | nos | pranayraj | 30 |
| 32 | Kilometer head | Kilometer head | 1 | nos | pranayraj | 30 |
| 33 | Kilometer cable | Kilometer cable | 1 | nos | pranayraj | 30 |
| 34 | Gear lever big | Gear lever big | 1 | nos | pranayraj | 30 |
| 35 | Horn | Horn | 1 | nos | pranayraj | 30 |
| 36 | Head light | Head light | 2 | nos | pranayraj | 30 |
| 37 | Clutch plate | Clutch plate | 1 | nos | pranayraj | 30 |
| 38 | Washer special tie bolt | Washer special tie bolt | 2 | nos | pranayraj | 30 |
| 39 | Tie bolt | Tie bolt | 1 | nos | pranayraj | 30 |
| 40 | Bearing washer tie bolt | Bearing washer tie bolt | 1 | nos | pranayraj | 30 |
| 41 | Bearing cup tie bolt | Bearing cup tie bolt | 1 | nos | pranayraj | 30 |
| 42 | Nut 48x3 | Nut 48x3 | 2 | nos | pranayraj | 30 |
| 43 | Disc 15 Ton | Disc 15 Ton | 1 | nos | pranayraj | 30 |
| 44 | Thrust bearing T12 RIAT | Thrust bearing T12 RIAT | 1 | nos | pranayraj | 30 |
| 45 | Oil seal with O ring and washer | Oil seal with O ring and washer | 1 | nos | pranayraj | 30 |
| 46 | Tie bolt spring | Tie bolt spring | 1 | nos | pranayraj | 30 |
| 47 | Pin | Pin | 1 | nos | pranayraj | 30 |
| 48 | Castle nut M 30 | Castle nut M 30 | 1 | nos | pranayraj | 30 |
| 49 | Washer | Washer | 1 | nos | pranayraj | 30 |
| 50 | Cotter pin | Cotter pin | 1 | nos | pranayraj | 30 |
| 51 | Thrust washer | Thrust washer | 1 | nos | pranayraj | 30 |
| 52 | Cut out | Cut out | 1 | nos | pranayraj | 30 |
| 53 | Alternator cover | Alternator cover | 2 | nos | pranayraj | 30 |
| 54 | Electrical laminated wood plate | Electrical laminated wood plate | 1 | nos | pranayraj | 30 |
| 55 | High Pressure Hose small | High Pressure Hose small | 2 | nos | pranayraj | 30 |
| 56 | Hyd hose large | Hyd hose large | 1 | nos | pranayraj | 30 |
| 57 | Ball bearing | Ball bearing | 2 | nos | pranayraj | 30 |
| 58 | Armature with bearing | Armature with bearing | 1 | nos | pranayraj | 30 |
| 59 | Field coil | Field coil | 1 | nos | pranayraj | 30 |
| 60 | Carbon brush | Carbon brush | 1 | set | pranayraj | 30 |
| 61 | Paint gun | Paint gun | 1 | nos | pranayraj | 30 |
| 62 | Safety valve | Safety valve | 1 | nos | pranayraj | 30 |
| 63 | Paint container gasket | Paint container gasket | 1 | nos | pranayraj | 30 |
| 64 | Square iron rod | Square iron rod | 1 | nos | pranayraj | 30 |
| 65 | Fuel filter Primary and secondary | Fuel filter Primary and secondary | 1 | set | pranayraj | 30 |
Discover companies most likely to bid on this tender
Copy of PAN Card
Copy of GSTIN
Copy of Cancelled Cheque
Copy of EFT Mandate duly certified by Bank
Evidence of 3 years govt/PSU supply experience (contracts) with copies
Details of Detailed Design Drawings approval process
OEM authorization or proof of manufacturing capabilities
Any installation/maintenance capability proof
Key insights about UTTAR PRADESH tender market
Bidders must submit PAN, GST, cancelled cheque, EFT mandate, and evidence of 3 years govt/PSU supply experience. Include OEM authorizations if applicable, and demonstrate non-obsolete products with 2 years residual market life. Ensure Detailed Design Drawings approval within 5 days of award and comply with the option clause for quantity variations.
Required documents include PAN, GSTIN, cancelled cheque, EFT mandate, evidence of prior govt/PSU supply contracts (3 years), OEM authorization or manufacturing capability, and technical bid documents detailing compliance with OEM specifications and proposed delivery plan tied to approved drawings.
Delivery timing begins after final approval of Detailed Design Drawings. If the buyer delays approval, the delivery period is refixed without liquidated damages. The option clause may extend delivery by (increased quantity ÷ original quantity) × original period, with a minimum 30 days.
Bidder must demonstrate 3 years of regular manufacturing/supply to central/state govt or PSU, provide contract copies for each year, and ensure products are not end-of-life for at least 2 years from bid opening. Non-obsolete product compliance is mandatory.
The tender lists 65 items including fuel filters, hoses, ignition switches, and bearings. Specific technical standards not provided; bidders should rely on OEM specifications and ensure components are compatible with Indian Army equipment, with drawings approved before fabrication.
The option clause allows up to ±25% quantity change at contracted rates during contract and currency, with delivery time adjustments calculated to maintain project continuity, ensuring flexibility for demand fluctuations while protecting supplier interests.
The tender text does not specify LDs; penalties, if any, would be defined in the final contract. Delays caused by late drawing approvals are not penalized; instead, the delivery period is refixed. Ensure timely drawing submissions to minimize risk.
Prepare government-grade credentials: PAN, GST, EFT mandate, and bank details; prove 3-year govt/PSU experience via contracts; submit OEM authorization; provide non-obsolete product evidence; ensure drawings are ready for quick approval within 5 days post-award.
Central Mine Planning And Design Institute Limited
Indian Army
📍 Ajmer, RAJASTHAN
Hindustan Petroleum Corporation Ltd
📍 SANGLI, MAHARASHTRA
National Seeds Corporation Limited (nsc)
Indian Army
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS