TenderDekho Logo
GEM

Panchayati Raj Department Bihar Sanitary Napkins Incinerator Machine with Smoke Control Unit Tender PURNIA 2026

Bid Publish Date

11-Jun-2026, 8:56 pm

Bid End Date

22-Jun-2026, 10:00 am

Location

Progress

Issue11-Jun-2026, 8:56 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

1

Bid Type

Two Packet Bid

Categories 3

Tender Overview

Organization: Panchayati Raj Department Bihar, Location: PURNIA, BIHAR, Category: Sanitary Napkins Incinerator Machine with Smoke Control Unit. Estimated value and EMD are not disclosed; scope focuses on a complete incinerator system with integrated Smoke Control Unit (SCU) and related control features. The tender emphasizes metal housing, insulation, and emission filtration compliance, with optional comprehensive warranty. The project vehicle is to enhance sanitary waste management within local Panchayat facilities, requiring fabrication with specified materials and safety features. A notable differentiator is the inclusion of a programmable automatic temperature and time controller and SCU with multi-filter carbon and odour chambers.

Technical Specifications & Requirements

  • Stand provided for the main unit
  • Dimensions of main unit include insulation thickness, chamber sheet thickness, machine weight, door insulation, and flexible outlet pipe diameter
  • Materials: housing cabinet, burning chamber, and thermal insulation materials must be specified
  • Control & Functional Features: temperature indicator, minimum burning temperature, daily and per-batch napkin burning capacity, and maximum burn time
  • Electrical & Safety: automatic digital controller for time and temperature
  • Smoke Control Unit (SCU): housing material, carbon and odour filtration chambers, filters count for carbon and odour chambers, SCU blower RPM
  • Performance: warranty option available through bidding and preferred as comprehensive warranty if offered
  • The data lacks explicit numeric values, so bidders must rely on the BOQ/technical schedule and provide compliant specifications accordingly.

Terms & Eligibility

  • The buyer reserves an option to adjust order quantity by ±25% during contract and delivery periods with extension rules based on the original delivery schedule
  • Mandatory documentation includes GST, PAN, UID, experience certificates, turnover proof (last 2 years, INR 50 Lakh/year), OEM authorization, ISO certification, sample submission, GSTR-3B, notarized non-blacklist affidavit, ITRs, and colorful item catalogues
  • Additional ATC clauses require prior similar works and CARC certificates, and submission of prior project completion certificates
  • The procurement emphasizes compliance with local government tender practices and strict submit/allowances for variations while preserving contract rates and delivery timelines

Key Specifications

  • Product/service names: Sanitary Napkins Incinerator Machine with Smoke Control Unit

  • Estimated value: Not disclosed; EMD amount: Not disclosed

  • Category: General incineration system with SCU

  • Key requirements: automatic digital controllers for time and temperature, SCU with carbon and odour filtration

  • Standards/certifications: Not explicitly stated; ISO/GST related documents listed in ATC

  • Delivery/location: PURNIA, BIHAR

  • Experience: Similar work experience certificates required

  • Warranty: Option for comprehensive warranty via bidding

Terms & Conditions

  • Option to increase/decrease quantity by up to 25%

  • Delivery period adjustments tied to original/extended delivery timeline

  • Bidder must attach GST, PAN, UID, turnover proof, and sample along with bid

Important Clauses

Payment Terms

Not specified in tender data; ATC references standard government terms requiring submission of financial documents and compliance with contract terms

Delivery Schedule

Delivery timelines tied to order date; option clause allows extended delivery period with calculated time extension formula

Penalties/Liquidated Damages

Not explicitly stated; implied through delivery extensions and performance expectations within ATC terms

Bidder Eligibility

  • Must provide GST registration, PAN, UID, and self-attested documents

  • Similar work experience certificate required (recent projects in public procurement)

  • Turnover proof for last 2 financial years (minimum INR 50 Lakh per year)

  • Authorization certificate from OEM and ISO certificate related work

  • Sample submission before bid deadline and CARC/previous work completion certificates

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Sanitary Napkins Incinerator Machine with Smoke Control Unit (Q3)

Authority Records

PANCHAYAT RAJ DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 3

GeM-Bidding-9457353.pdf

Main Document

CATALOG-Specification-1

CATALOG Specification

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Sanitary Napkins Incinerator Machine with Smoke Control Unit

Panchayati Raj Department

PURNIA, BIHAR

Posted: 2 June 2026
Closed: 12 June 2026
GEM

Sanitary Napkins Incinerator Machine with Smoke Control Unit

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

SANT RAVIDAS NAGAR, UTTAR PRADESH

Posted: 12 May 2026
Closed: 23 May 2026
GEM

Sanitary Napkins Incinerator Machine with Smoke Control Unit

N/a

ALLAHABAD, UTTAR PRADESH

Posted: 29 May 2026
Closed: 12 June 2026
GEM

Sanitary Napkins Incinerator Machine with Smoke Control Unit

Southern Railway

THIRUVANANTHAPURAM, KERALA

Posted: 26 May 2026
Closed: 11 June 2026
GEM

Sanitary Napkins Incinetator Machine with Smoke Control Unit

Sitamarhi District Panchayats

SHEOHAR, BIHAR

Posted: 21 February 2026
Closed: 3 March 2026
GEM

Technical Specifications 1 Item

Item #1 Details

View Catalog
Category Specification Requirement
GENERAL Stand provided Yes, No
DIMENSIONS OF MAIN UNIT Thickness of thermal Insulation material (mm) 25, 40
DIMENSIONS OF MAIN UNIT Thickness of MS/SS sheet of burning chamber (internal) (mm) (Min) 3, 5, 1 Or higher
DIMENSIONS OF MAIN UNIT Machine Weight(kg) 5-15, 16-30, 31-50, 51-250
DIMENSIONS OF MAIN UNIT Thickness of door including insulation (mm) 20, 25, 40, 50, 60
DIMENSIONS OF MAIN UNIT Flexible emission Outlet pipe dia (mm) 25, 40, 50, 63, 76
MATERIAL OF MACHINE UNIT Material of Housing cabinet (External) Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade
MATERIAL OF MACHINE UNIT Material of Burning chamber (Internal) Mild Steel(CRCA) sheet, Stainless Steel sheet of SS-304 grade
MATERIAL OF MACHINE UNIT Material of Thermal Insulation High Density Ceramic Fiber sheet, High Density Ceramic Board
CONTROL & FUNCTIONAL FEATURES Temperature indicator provided Yes, No
CONTROL & FUNCTIONAL FEATURES Minimum Burning temperature (degree C) 800, 950
CONTROL & FUNCTIONAL FEATURES Burning Capacity per day (Number of Napkins) 15-50, 51-100, 100-200, 200-500, 500-700, 700-1000, 1000-1250
CONTROL & FUNCTIONAL FEATURES Burning Capacity at a time (Number of Napkins) 1-15, 16-25, 26-50
CONTROL & FUNCTIONAL FEATURES Burning time of full capacity Napkins/pads (minutes) (Max) 5, 10, 15, 20, 25, 30, 35, 40, 45, 50, 55, 60, 3
ELECTRICAL AND SAFETY FEATURES Automatic digital controller for time Yes, No
ELECTRICAL AND SAFETY FEATURES Automatic digital controller for temperature Yes, No
SMOKE CONTROL UNIT (SCU) Type of SCU (Smoke Control Unit) Top mounted, Side Mounted, Separate unit, Not Required
SMOKE CONTROL UNIT (SCU) Material of housing of Smoke Control Unit (SCU) Mild Steel(CRCA) cabinet, Stainless Steel of SS-304 grade, NA
SMOKE CONTROL UNIT (SCU) Both carbon Control and Foul odour Control Chambers for filteration of smoke emission Yes, Not Required
SMOKE CONTROL UNIT (SCU) Number of filters in Carbon control chamber One, Two, Three, Not Required
SMOKE CONTROL UNIT (SCU) Type of filters in Carbon control chamber Teflon filter, Activated Carbon filter, Steel mesh filterr, Teflon filter & Activated Carbon filter, Teflon filter, Activated Carbon filter & Steel mesh filter, Ceramic blanket as a filter, Not Required
SMOKE CONTROL UNIT (SCU) Number of filters in Odour control chamber One, Two, Three, Not Required
SMOKE CONTROL UNIT (SCU) Blower RPM 1800, 2700, 0
PERFORMANCE REQUIREMENTS Warranty in Years (Option of comprehensive warranty is available through bidding only, which if opted will supersede normal warranty in the catalogue) 1, 2, 3, 4, 5 Or higher

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Experience Criteria

2

Past Performance

3

Bidder Turnover

4

Certificate (Requested in ATC)

5

OEM Authorization Certificate

6

OEM Annual Turnover *In case any bidder is seeking exemption from Experience / Turnover Criteria

7

the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer

Frequently Asked Questions

Key insights about BIHAR tender market

How to bid for the sanitary napkins incinerator tender in PURNIA?

Bidders should prepare GST, PAN, UID, and turnover proof for last 2 years (₹50 Lakh per year minimum). Submit OEM authorization, ISO certificate, and sample before the bid deadline. Ensure SPVs include SCU details, automatic controllers, and carbon/odour filtration specifications.

What documents are required for PURNIA incinerator procurement bid?

Required documents include GST Return (current year), GSTR-3B, PAN, UID, turnover certificates, experience certificates for similar work, OEM authorization, notary affidavit of no blacklist, ITRs for 2023-24 to 2025-26, and colorful item catalogues. Sample submission is mandatory.

What are the technical requirements for SCU in this tender?

SCU must include carbon control and odour control chambers with specified filters counts. SCU housing material, blower RPM, and integration with automatic temperature controller are required. The bid favors ISI/ISO compliant components where applicable and a robust filtration sequence for emission control.

What is the delivery flexibility for quantity variation in this tender?

The buyer allows +/-25% quantity adjustment at award and during contract execution. Delivery time extensions are calculated by (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and may extend up to the original delivery period.

What are the warranty options for the incinerator procurement?

The tender permits an optional comprehensive warranty through bidding. If opted, it supersedes the catalogue warranty. Bidders should clearly state warranty duration and coverage for parts, labor, and service in the bid proposal.

What standards or certifications must be demonstrated in PURNIA bid submissions?

Submit ISO certificates related to work, OEM authorizations, GST compliance, and relevant experience certificates. While IS/IS 550 or BIS codes are referenced in related lines, explicit mandatory standards are not stated; bidders should provide best-fit certified components and document conformity.

How is sample submission handled for this PURNIA tender?

Sample submission is mandatory before the bid deadline. Include a complete demo unit or representative model demonstrating SCU filtration, temperature control, and safe operation within the specified construction materials. Ensure documentation aligns with the OEM and ISO requirements.

What is the minimum turnover requirement for eligibility in this Bihar tender?

Turnover should be at least INR 50 Lakh per year for the last two financial years. Submit turnover certificates for both years to demonstrate financial stability and bid readiness, along with supporting VAT/GST filings.

Similar Tenders

5 found
Urgent

Rural Development Department Bihar Sanitary Napkins Incinerator Machine Tender 2026 - Smoke Control Unit, IS/Standards, 3rd Quarter

Rural Development Department

📍 EAST CHAMPARAN, BIHAR

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Rural Development Department Bihar Sanitary Napkins Incinerator Machine with Smoke Control Tender 2026

Rural Development Department

📍 EAST CHAMPARAN, BIHAR

⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Sanitary Napkins Incinerator Machine with Smoke Control Unit

Nagar Panchayat Bansdih Ballia

📍 BALLIA, UTTAR PRADESH

EMD: ₹22,400
Est: ₹11.2 L
⏰ Deadline: 1 day left
🛒 Type: Goods
View GEM

Sanitary Napkins Incinerator Machine with Smoke Control Unit

E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh

📍 Hamirpur, UTTAR PRADESH

EMD: ₹9,000
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Sanitary Napkins Incinerator Machine with Smoke Control Unit

N/a

📍 BULANDSHAHR, UTTAR PRADESH

EMD: ₹15,500
Est: ₹7.8 L
⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM