MANUFACTURE AND SUPPLY OF TOOL KIT FOR AKU 58AE, D7.9187. 1000. I, TSR/25/20/1.
Hindustan Aeronautics Limited (hal)
NASHIK, MAHARASHTRA
Bid Publish Date
09-Jul-2026, 8:16 am
Bid End Date
20-Jul-2026, 5:00 pm
Location
Progress
Quantity
71
Bid Type
Single Packet Bid
Hindustan Aeronautics Limited, under the Department Of Defence Production, seeks the manufacture and supply of a tool kit for AKU 58AE. The tender mentions a potential quantity variation of up to 25% of the bid quantity during contract execution, with delivery time adjustments calculated as (additional quantity/original quantity) × original period, minimum 30 days. The procurement operates on a single bid, linewise and established source basis, with price details to be entered on the GeM portal only. No BOQ items are listed, indicating a compact or stand-alone kit scope. This tender emphasizes strict adherence to the specified delivery and option clause, and requires bidders to follow updated drawings and SOPs.
Option quantity clause allows ±25% change with calculated delivery extension and minimum 30 days
Pricing must be entered exclusively on GeM portal; no prices in technical/commercial bid documents
Upload of required certificates/documents is mandatory to avoid bid rejection
Not specified in provided data; ensure any HAL terms are followed per ATC if disclosed in full tender
Delivery starts from last date of original order; option qty may extend delivery time; minimum 30 days; time formula: (additional/original) × original period
Not detailed in available data; bidders should assume standard HAL penalties and confirm during bid submission
Eligibility to participate requires compliance with Part-A and Part-B technical/commercial sheets
Demonstrated experience in supplying tool kits for defense/aerospace equipment
OEM authorization or identity as an established supplier with credible background
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
MANUFACTURE AND SUPPLY OF TOOL KIT FOR AKU 58AE, D7.9187. 1000. I, TSR/26/4/1.
Payment Timelines
Payments shall be made to the Seller within 30 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC)
Max Delivery Days
120
Delivery Locations
1
Delivery Cities
Nashik
| Consignee | Address | City | State | Pincode | Quantity | Delivery Days | Additional Requirement |
|---|---|---|---|---|---|---|---|
| - | Nashik | Nashik | - | - | 71 | 120 | - |
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS
Hindustan Aeronautics Limited (hal)
NASHIK, MAHARASHTRA
Hindustan Aeronautics Limited (hal)
Advanced Weapons And Equipment India Limited
N/A
THIRUVANANTHAPURAM, KERALA
Indian Army
JABALPUR, MADHYA PRADESH
Tender Results
Loading results...
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar tool kit supply
Financial statements or turnover evidence
EMD/Security deposit documents (per tender terms)
Technical compliance certificates for AKU 58AE tool kit
OEM authorizations or licenses (if applicable)
Part-A Technical Compliance Sheet
Part-B Commercial Compliance Sheet
Annexure-I undertaking for compliance of Part A, Part B & Annexure-I
Key insights about MAHARASHTRA tender market
Bidders must prepare Part-A (Technical Compliance) and Part-B (Commercial Compliance) with Annexure-I, upload all required certificates, and submit pricing on the GeM portal. Ensure compliance with the option quantity clause and delivery time calculations; follow latest drawings and SOPs provided after eligibility confirmation.
Required documents include GST registration, PAN, experience certificates for defense tool kit supply, financial statements, EMD/security documents, OEM authorizations, and technical/commercial compliance sheets (Part-A & Part-B) with Annexure-I undertakings.
The tender lists AKU 58AE tool kit but provides no detailed technical specs in the data; bidders must rely on Part-A technical compliance, latest drawings, SOPs, PAT, and PTGHE references to demonstrate conformity and performance criteria.
Delivery starts from the last date of the original delivery order; if quantity increases by up to 25%, the additional time is calculated as (increased quantity/original quantity) × original delivery period, with a minimum extension of 30 days.
Pricing must be entered exclusively on the GeM portal; the technical bid (Part-A) should not include any pricing details; any deviation will lead to rejection and disqualification from evaluation.
Bidders must meet eligibility by submitting Part-A & Part-B compliance, provide necessary certifications, demonstrate defense-tool-kit supply experience, and adhere to the single bid, established-source basis as per ATC and corrigendum.
Submit Undertaking for compliance of Part A, Part B & Annexure-I, along with required technical certificates, OEM authorizations, and SOPs; ensure all uploaded documents align with Buyer Added Terms and the latest drawings referenced in PO precedents.
Hindustan Aeronautics Limited (hal)
📍 NASHIK, MAHARASHTRA
Armoured Vehicles Nigam Limited
📍 THANE, MAHARASHTRA
Hmt Machine Tools Limited
📍 BANGALORE, KARNATAKA
Advanced Weapons And Equipment India Limited
Kiocl Limited
📍 DAKSHINA KANNADA, KARNATAKA
Sign up now to access all documents
Main Document
OTHER
GEM_GENERAL_TERMS_AND_CONDITIONS