TenderDekho Logo
GEM

NMDC Steel Limited Bearings Category 1 Lot 10 Tender Nagarnar Bastar Chhattisgarh 2026

Bid Publish Date

02-May-2026, 3:16 pm

Bid End Date

05-Jun-2026, 4:00 pm

EMD

₹962

Generate Docs

Progress

Issue02-May-2026, 3:16 pm
Corrigendum22-May-2026
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

7564

Category

1600197642 7316

Bid Type

Two Packet Bid

Tender Overview

NMDC Steel Limited, Nagarnar, Jagdalpur, Bastar, Chhattisgarh, invites online GeM tenders for the supply of Bearings on Category 1 (Lot 10). The procurement uses a two-bid system via the GeM Portal with a bid submission deadline of 23.05.2026 at 18:00 IST and technical bid opening on the same day at 18:30 IST. The EMD amount is ₹962.0. The scope covers 181 total items in the BOQ, though specific itemwise quantities are not disclosed. A flexible quantity clause allows up to ±25% variation. This procurement is aligned with NMDC Steel Limited’s bearings category requirements and includes integrity pact annexures and ATC terms.

Technical Specifications & Requirements

  • Description: Supply of Bearings on Category 1 (Lot 10) for NMDC Steel Limited (NSL), Bastar district, 494001.
  • Platform: GeM Portal, two-bid submission, CTCA/Integrity Pact compliance.
  • BOQ: 181 total items listed in Annexure I; precise quantities not disclosed in the供 tender extract.
  • EMD: ₹962.0 provided as security.
  • ATC/Drawings: Annexure IV contains technical specifications and drawings; Annexure V–VI cover general terms and MII compliance.
  • Key terms: Online tender, corrigenda on GeM portal, deliverable within negotiated periods, option quantity clause, and acceptance of extended delivery time rules.

Terms & Eligibility

  • Quantity variation: Purchaser may increase/decrease up to 25% of bid quantity at contract placement and during currency at contracted rates.
  • Delivery timing: Additional time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days.
  • Bid process: Submit offers in TWO-BID system through GeM; last date 23.05.2026; technical bid opening 18:30 IST on the same day.
  • Documentation: Annexures include Integrity Pact, Technical Specifications, General Terms, and MII Compliance; bidders must comply with these terms and visit GeM portal for corrigenda.

Key Specifications

  • Product/service names: Bearings (Category 1, Lot 10) for NMDC Steel Limited

  • Quantity/BOQ: 181 items listed; exact quantities not disclosed in extract

  • EMD/Value: ₹962.0

  • Delivery scope: Offshore of last mile delivery to NMDC NSL Nagarnar site (Nagarnar, Bastar, Chhattisgarh 494001)

  • Standards/Compliance: Annexure IV (Technical Specifications) attached; General Terms Annexure V/VI; Integrity Pact

  • Experience: Not explicitly specified in extract; bidders must adhere to ATC terms and MII compliance

  • Delivery terms: Option clause allows ±25% quantity changes with proportionate delivery time

Terms & Conditions

  • EMD of ₹962.0 must accompany bid; payment mechanics per terms not detailed in extract

  • Up to 25% quantity variation at contract placement and during currency at contracted rates

  • Two-bid GeM submission with technical bid opening on 23.05.2026 at 18:30 IST

Important Clauses

Delivery Terms

Delivery period starts from the last date of the original delivery order; extended time calculated as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days

Payment Terms

Payment terms are not fully specified in extract; bidders should refer to Annexures and ATC for exact terms and schedule

Penalty/Liquidated Damages

Not explicitly stated in extract; refer to General Terms Annexure for LD/penalty provisions

Bidder Eligibility

  • Participation via GeM two-bid system without external portals

  • Compliance with Integrity Pact as per Annexure II/III

  • Submission of EMD ₹962.0 and technical/commercial bids per Annexure IV–VI

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Authority Records

MINISTRY OF STEEL
Free Trial Available

Win more tenders with
real-time intelligence

Trusted by 5,000+ companies to find, track, and win government tenders.

Smart Alerts
Daily matched tenders to your inbox
Bid Results
See L1 winners & actual prices paid
Competitor Intel
Track rival companies & win patterns
Price Intelligence
BOQ rate trends to benchmark your bid
Book a Free Demo

See TenderDekho in action

Our team will walk you through the platform and help set up your profile — free, no commitment.

Callback within 24 hrs No credit card needed

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 11

GeM-Bidding-9274492.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Other Documents

OTHER

Buyer uploaded ATC document

ATC

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

1600302649,1600466493,1600466492,1600666673,1600653918

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 20 August 2025
Closed: 16 September 2025
GEM

1600481090,1600667400,1600667401,1600667271,1600667272

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 3 October 2025
Closed: 18 October 2025
GEM

1600499712,1600500366,1600508763,1600499598,1600508762,1600500359,1600500362

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 23 December 2024
Closed: 28 January 2025
GEM

NMDC Steel Limited Tender 2025 Goods Supply Bastar Chhattisgarh ISD Compliance and OEM Authorization

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 17 October 2025
Closed: 7 November 2025
GEM

1600277024,1600286823,1600277023,1600277022,1600282882

Nmdc Steel Limited

BASTAR, CHHATTISGARH

Posted: 21 April 2025
Closed: 12 May 2025
GEM

Bill of Quantities (BOQ) 181 Items Sign in for GEM prices

#1

1600197642 7316

As per technical specification

12 no Delivery: 120 days
#2

1600205333 29426

As per technical specification

11 no Delivery: 120 days
#3

1600202883 6580 6535

As per technical specification

12 no Delivery: 120 days
#4

1600197859 22232 SMB

As per technical specification

9 no Delivery: 120 days
#5

1600196474 6005 ZZR

As per technical specification

37 no Delivery: 120 days
#6

1600196466 6313 ZZ C3

As per technical specification

4 no Delivery: 120 days
#7

1600196461 6319 ZZ

As per technical specification

18 no Delivery: 120 days
#8

1600196456 7314 BMP

As per technical specification

5 no Delivery: 120 days
#9

1600205837 32206

As per technical specification

21 no Delivery: 120 days
#10

1600197805 7308 BECBJ

As per technical specification

14 no Delivery: 120 days
#11

1600197801 NU 308 ECJ

As per technical specification

15 no Delivery: 120 days
#12

1600197799 6205 2RS

As per technical specification

4 no Delivery: 120 days
#13

1600197794 16026

As per technical specification

9 no Delivery: 120 days
#14

1600041839 6010

As per technical specification

28 no Delivery: 120 days
#15

1600041838 6011

As per technical specification

4 no Delivery: 120 days
#16

1600041837 6024

As per technical specification

7 no Delivery: 120 days
#17

1600196971 22208 E

As per technical specification

5 no Delivery: 120 days
#18

1600041823 22210 E

As per technical specification

5 no Delivery: 120 days
#19

1600045127 22216 CC

As per technical specification

9 no Delivery: 120 days
#20

1600045623 22216 E

As per technical specification

4 no Delivery: 120 days
#21

1600196970 22232 CC C3

As per technical specification

16 no Delivery: 120 days
#22

1600045626 22332 CC W33

As per technical specification

7 no Delivery: 120 days
#23

1600045620 23022 CC W33

As per technical specification

30 no Delivery: 120 days
#24

1600045615 23028 CC W33

As per technical specification

4 no Delivery: 120 days
#25

1600045606 23124 CC W33

As per technical specification

6 no Delivery: 120 days
#26

1600191162 3309 BG

As per technical specification

4 no Delivery: 120 days
#27

1600196966 3310 C3

As per technical specification

18 no Delivery: 120 days
#28

1600196964 6000 Z

As per technical specification

8 no Delivery: 120 days
#29

1600196963 6010 Z

As per technical specification

18 no Delivery: 120 days
#30

1600196962 6200 Z

As per technical specification

7 no Delivery: 120 days
#31

1600196961 6210 Z

As per technical specification

4 no Delivery: 120 days
#32

1600191161 NU 1013 MI

As per technical specification

30 no Delivery: 120 days
#33

1600196541 NU 307

As per technical specification

6 no Delivery: 120 days
#34

1600196525 6411

As per technical specification

4 no Delivery: 120 days
#35

1600196955 22218 E C3

As per technical specification

13 no Delivery: 120 days
#36

1600196523 6310 ZZ C3

As per technical specification

59 no Delivery: 120 days
#37

1600196953 6313 JC3

As per technical specification

6 no Delivery: 120 days
#38

1600196952 7315 B MUA

As per technical specification

4 no Delivery: 120 days
#39

1600196520 NU 315 C3

As per technical specification

4 no Delivery: 120 days
#40

1600045112 32319

As per technical specification

9 no Delivery: 120 days
#41

1600045093 22222 CC W33

As per technical specification

17 no Delivery: 120 days
#42

1600045092 22224 CC W33

As per technical specification

6 no Delivery: 120 days
#43

1600196183 6030 C3

As per technical specification

4 no Delivery: 120 days
#44

1600196573 NU 1030 M

As per technical specification

4 no Delivery: 120 days
#45

1600197149 6004

As per technical specification

14 no Delivery: 120 days
#46

1600197729 3307 A

As per technical specification

6 no Delivery: 120 days
#47

1600197728 6201 ZZ

As per technical specification

199 no Delivery: 120 days
#48

1600198888 NU 306

As per technical specification

40 no Delivery: 120 days
#49

1600200270 22211 CCK H311

As per technical specification

20 no Delivery: 120 days
#50

1600051512 22218 E

As per technical specification

21 no Delivery: 120 days
#51

1600200260 22222 CC C3

As per technical specification

6 no Delivery: 120 days
#52

1600200259 22226 EK W33 H3126

As per technical specification

9 no Delivery: 120 days
#53

1600200258 22230 CCK W33 H3130

As per technical specification

13 no Delivery: 120 days
#54

1600200253 23068 CCK W33 C3 AOH03068 G

As per technical specification

4 no Delivery: 120 days
#55

1600200250 23134 CCK W33 H3134

As per technical specification

27 no Delivery: 120 days
#56

1600200396 23140 CC W33

As per technical specification

20 no Delivery: 120 days
#57

1600200390 30220 A

As per technical specification

162 no Delivery: 120 days
#58

1600200388 6006

As per technical specification

11 no Delivery: 120 days
#59

1600200385 51208

As per technical specification

6 no Delivery: 120 days
#60

1600200381 22226 E

As per technical specification

86 no Delivery: 120 days
#61

1600200802 23230 CC W33 C3

As per technical specification

38 no Delivery: 120 days
#62

1600200799 24040 CC W33 C4

As per technical specification

18 no Delivery: 120 days
#63

1600196935 3316 A

As per technical specification

9 no Delivery: 120 days
#64

1600196930 6205 2RSH

As per technical specification

400 no Delivery: 120 days
#65

1600196925 6330 C3

As per technical specification

5 no Delivery: 120 days
#66

1600196924 7215 BE

As per technical specification

7 no Delivery: 120 days
#67

1600197720 23024 CC W33

As per technical specification

4 no Delivery: 120 days
#68

1600202880 23220 CC W33 C3

As per technical specification

22 no Delivery: 120 days
#69

1600200304 24132 CC W33 C4

As per technical specification

20 no Delivery: 120 days
#70

1600196512 6204 RSH

As per technical specification

5 no Delivery: 120 days
#71

1600041840 6008

As per technical specification

19 no Delivery: 120 days
#72

1600041820 6210

As per technical specification

27 no Delivery: 120 days
#73

1600041834 6216

As per technical specification

19 no Delivery: 120 days
#74

1600196454 6226

As per technical specification

24 no Delivery: 120 days
#75

1600041831 6306

As per technical specification

24 no Delivery: 120 days
#76

1600041830 6308

As per technical specification

6 no Delivery: 120 days
#77

1600041828 6313

As per technical specification

51 no Delivery: 120 days
#78

1600045572 6319

As per technical specification

17 no Delivery: 120 days
#79

1600045571 22214

As per technical specification

14 no Delivery: 120 days
#80

1600196439 22220

As per technical specification

28 no Delivery: 120 days
#81

1600196449 22226

As per technical specification

98 no Delivery: 120 days
#82

1600196447 22326

As per technical specification

42 no Delivery: 120 days
#83

1600196446 22211 EK H311

As per technical specification

12 no Delivery: 120 days
#84

1600196440 22217 EK H317

As per technical specification

11 no Delivery: 120 days
#85

1600195564 22232 CC W33

As per technical specification

13 no Delivery: 120 days
#86

1600045080 22324 CC W33

As per technical specification

19 no Delivery: 120 days
#87

1600045612 23032 CC W33

As per technical specification

7 no Delivery: 120 days
#88

1600045078 23048 CC W33

As per technical specification

4 no Delivery: 120 days
#89

1600195560 23226 CC W33

As per technical specification

44 no Delivery: 120 days
#90

1600195551 6003 ZZ

As per technical specification

37 no Delivery: 120 days
#91

1600195549 6204 ZZ

As per technical specification

183 no Delivery: 120 days
#92

1600198384 6205 ZZ C3

As per technical specification

198 no Delivery: 120 days
#93

1600196061 6208 ZZ C3

As per technical specification

214 no Delivery: 120 days
#94

1600195524 6208 C3

As per technical specification

17 no Delivery: 120 days
#95

1600198487 6209 C3

As per technical specification

39 no Delivery: 120 days
#96

1600198486 6209 ZZ C3

As per technical specification

63 no Delivery: 120 days
#97

1600198458 6210 C3

As per technical specification

6 no Delivery: 120 days
#98

1600200409 6210 ZZ

As per technical specification

22 no Delivery: 120 days
#99

1600200408 6210 ZZ C3

As per technical specification

54 no Delivery: 120 days
#100

1600200405 6215 C3

As per technical specification

9 no Delivery: 120 days
#101

1600200404 6218 C3

As per technical specification

21 no Delivery: 120 days
#102

1600200403 6220 C3

As per technical specification

17 no Delivery: 120 days
#103

1600200398 6305 ZZ

As per technical specification

53 no Delivery: 120 days
#104

1600200338 6306 ZZ

As per technical specification

328 no Delivery: 120 days
#105

1600200335 6308 ZZ C3

As per technical specification

66 no Delivery: 120 days
#106

1600199096 6309 2RS

As per technical specification

9 no Delivery: 120 days
#107

1600199094 6309 C3

As per technical specification

36 no Delivery: 120 days
#108

1600200331 6309 ZZ

As per technical specification

29 no Delivery: 120 days
#109

1600200330 6309 ZZ C3

As per technical specification

43 no Delivery: 120 days
#110

1600199088 6310 C3

As per technical specification

43 no Delivery: 120 days
#111

1600200329 6310 ZZ

As per technical specification

27 no Delivery: 120 days
#112

1600200326 6311 ZZ C3

As per technical specification

24 no Delivery: 120 days
#113

1600198753 6312 C3

As per technical specification

35 no Delivery: 120 days
#114

1600200324 6312 ZZ

As per technical specification

4 no Delivery: 120 days
#115

1600198693 6314 C3

As per technical specification

23 no Delivery: 120 days
#116

1600198692 6315 C3

As per technical specification

17 no Delivery: 120 days
#117

1600199054 6316 C3

As per technical specification

24 no Delivery: 120 days
#118

1600200321 6316 ZZ

As per technical specification

5 no Delivery: 120 days
#119

1600199040 6319 C3

As per technical specification

67 no Delivery: 120 days
#120

1600199039 6322 C3

As per technical specification

16 no Delivery: 120 days
#121

1600198993 6324 C3

As per technical specification

9 no Delivery: 120 days
#122

1600198913 NU 208

As per technical specification

8 no Delivery: 120 days
#123

1600200320 NU 208 EC C3

As per technical specification

57 no Delivery: 120 days
#124

1600198889 NU 230 C3

As per technical specification

4 no Delivery: 120 days
#125

1600197645 NU 309

As per technical specification

86 no Delivery: 120 days
#126

1600198819 NU 309 C3

As per technical specification

60 no Delivery: 120 days
#127

1600198697 NU 312 C3

As per technical specification

5 no Delivery: 120 days
#128

1600197626 NU 313

As per technical specification

27 no Delivery: 120 days
#129

1600198665 NU 319 C3

As per technical specification

16 no Delivery: 120 days
#130

1600198890 NU 224 C3

As per technical specification

8 no Delivery: 120 days
#131

1600200255 22326 CCJA W33 VA405 C4

As per technical specification

45 no Delivery: 120 days
#132

1600198666 NU 319

As per technical specification

28 no Delivery: 120 days
#133

1600300116 22228 CK H3128

As per technical specification

31 no Delivery: 120 days
#134

1600195526 6206 ZZ

As per technical specification

1,423 no Delivery: 120 days
#135

1600196967 24136 CC W33

As per technical specification

16 no Delivery: 120 days
#136

1600045109 32324

As per technical specification

4 no Delivery: 120 days
#137

1600196475 6206 C3

As per technical specification

1,127 no Delivery: 120 days
#138

1600196319 6207 ZZ

As per technical specification

100 no Delivery: 120 days
#139

1600315184 608

As per technical specification

5 no Delivery: 120 days
#140

1600200542 6212 2RS

As per technical specification

17 no Delivery: 120 days
#141

1600315284 6405 2RS

As per technical specification

10 no Delivery: 120 days
#142

1600045172 16012 C3

As per technical specification

5 no Delivery: 120 days
#143

1600600362 22228 K H3128

As per technical specification

5 no Delivery: 120 days
#144

1600315338 22316 E

As per technical specification

8 no Delivery: 120 days
#145

1600200391 23164 K MB C4 AH3164

As per technical specification

4 no Delivery: 120 days
#146

1600377938 22222 CK H322

As per technical specification

54 no Delivery: 120 days
#147

1600250886 22324 EM W33 W800C4

As per technical specification

8 no Delivery: 120 days
#148

1600300102 22226 ESK H3126

As per technical specification

6 no Delivery: 120 days
#149

1600379487 NJ 226

As per technical specification

6 no Delivery: 120 days
#150

1600379489 NU 1026

As per technical specification

12 no Delivery: 120 days
#151

1600379495 7213

As per technical specification

9 no Delivery: 120 days
#152

1600316141 7308 BG

As per technical specification

5 no Delivery: 120 days
#153

1600319278 6208 2RS

As per technical specification

5 no Delivery: 120 days
#154

1600370595 6320

As per technical specification

11 no Delivery: 120 days
#155

1600045600 23136 CC W33

As per technical specification

20 no Delivery: 120 days
#156

1600377933 22326 CC W33

As per technical specification

4 no Delivery: 120 days
#157

1600300120 22220 CK H320

As per technical specification

64 no Delivery: 120 days
#158

1600300119 22220 ESK H320

As per technical specification

5 no Delivery: 120 days
#159

1600397035 22232 ESK TVPB H3132

As per technical specification

26 no Delivery: 120 days
#160

1600300115 22230 CK H3130

As per technical specification

11 no Delivery: 120 days
#161

1600300117 22224 CK H3124

As per technical specification

30 no Delivery: 120 days
#162

1600600364 22226 EK H3126

As per technical specification

31 no Delivery: 120 days
#163

1600379493 22219 E1 XL K H319

As per technical specification

10 no Delivery: 120 days
#164

1600045121 23218 CCK W33 H2318

As per technical specification

9 no Delivery: 120 days
#165

1600045119 23222 CCK W33 H2322

As per technical specification

8 no Delivery: 120 days
#166

1600397029 NU 218

As per technical specification

7 no Delivery: 120 days
#167

1600379491 NU 222

As per technical specification

6 no Delivery: 120 days
#168

1600377902 NU 324 C3

As per technical specification

4 no Delivery: 120 days
#169

1600377946 6321 C3

As per technical specification

17 no Delivery: 120 days
#170

1600200905 NU 218 ECJ

As per technical specification

6 no Delivery: 120 days
#171

1600411676 NU 1030 M 6030 C3

As per technical specification

8 no Delivery: 120 days
#172

1600223804 N 206

As per technical specification

5 no Delivery: 120 days
#173

1600377909 NU 208 C3

As per technical specification

33 no Delivery: 120 days
#174

1600316137 30215 J2 Q

As per technical specification

11 no Delivery: 120 days
#175

1600191166 24136 BS C3

As per technical specification

9 no Delivery: 120 days
#176

1600202872 23120 2CS2 VT143B C4

As per technical specification

30 no Delivery: 120 days
#177

1600045118 23228 CCK W33 H2328

As per technical specification

7 no Delivery: 120 days
#178

1600045126 22336 CCK W33 H2336

As per technical specification

4 no Delivery: 120 days
#179

1600377906 NU 217

As per technical specification

4 no Delivery: 120 days
#180

1600300116 22228 CK H3128

As per technical specification

45 no Delivery: 120 days
#181

1600368323 1215 K H215

As per technical specification

25 no Delivery: 120 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

GST Registration Certificate

2

PAN Card

3

Experience Certificates for Bearings procurement

4

Financial Statements (latest available)

5

EMD Submission Proof (₹962.0)

6

Technical Compliance Certificates (as per Annexure IV)

7

OEM Authorization (if non-OEM bidder)

8

Integrity Pact signed (Annexure II & III)

9

Bidder's Bank Details for payment routing

Corrigendum Updates

1 Update
#1

Update

22-May-2026

Extended Deadline

05-Jun-2026, 4:00 pm

Opening Date

05-Jun-2026, 4:30 pm

Frequently Asked Questions

Key insights about CHHATTISGARH tender market

How to bid for bearings tender in Bastar NMDC 2026?

Bidders must submit a TWO-BID offer via the GeM portal by 23.05.2026, 06:00 PM IST. Ensure EMD of ₹962.0 is ready, attach Annexure IV technical specs, and sign Integrity Pact (Annexures II, III). Technical bid opens 18:30 IST the same day; corrigenda appear only on GeM.

What documents are required for NMDC bearing procurement in Bastar?

Submit GST Registration, PAN, latest financial statements, experience certificates for bearings supply, EMD payment proof, OEM authorization if applicable, Technical compliance documents (Annexure IV), and Integrity Pact (Annexures II/III). Ensure GeM bid submissions match Annexure VI MII compliance.

What are the delivery terms for Category 1 Lot 10 bearings?

Delivery starts after the original delivery order; option quantity up to 25% allows extended delivery time calculated as (Increased quantity/original quantity) × original period, minimum 30 days. Extensions may apply within the contract timeframe as per ATC terms.

Which standards or drawings govern NMDC bearings tender 2026?

Annexure IV contains the Technical Specifications and drawings. Bidders must comply with these specifications and ensure all bearings meet category 1 Lot 10 requirements, along with ISI/ISO standards if specified in Annexure IV.

When is the bid submission deadline for NMDC NSL bearings?

The last date for bid submission is 23.05.2026, 06:00 PM IST. Technical bid opening occurs at 06:30 PM IST on the same day; corrigenda will be posted on the GeM portal.

What is the scope of items in the NMDC bearing BOQ?

BOQ lists 181 total items for Category 1 (Lot 10); precise item-wise quantities are not disclosed in the extract. Bidders should review Annexure-I Schedule of Tender for item descriptions and counts.

What payment terms apply to NMDC bearings procurement?

Payment terms are detailed in Annexure VI MII/General Terms; the extract does not specify exact schedules. Bidders should review Annexures for advance, milestone, or post-delivery payment conditions and any performance guarantees.

How to verify integrity pact and ATC requirements for GeM tender?

Download and sign Annexure-II/III Integrity Pact, and follow ATC instructions in Annexure-V, VI. GeM portal ensures online submission; ensure compliance before bid submission and monitor for any corrigenda on GeM.

Similar Tenders

5 found

NMDC Steel Limited Tender Procurement of Goods Supply in Bastar Chhattisgarh 25% Quantity Option Clause 2026

Nmdc Steel Limited

📍 BASTAR, CHHATTISGARH

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

1700392616,1700392615,1700392614,1600670094,1600628128,1700377232,1600628127

Nmdc Steel Limited

📍 BASTAR, CHHATTISGARH

⏰ Deadline: 3 weeks left
🛒 Type: Goods
View GEM

1600674215,1600674212,1600674211,1600670777,1600671401,1600674206,1600671403,1600671429,1600674217,

Nmdc Steel Limited

📍 BASTAR, CHHATTISGARH

EMD: ₹5,310
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM

1600668146,1600210918,1700081534,1700081530,1700009196,1700009197,1700009199,1700081528

Nmdc Steel Limited

📍 BASTAR, CHHATTISGARH

EMD: ₹1,920
Est: ₹18.6 L
⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

NMDC Steel Limited Drill Machine and Mud Gun Consumables Tender Bastar Chhattisgarh 2026

Nmdc Steel Limited

📍 BASTAR, CHHATTISGARH

⏰ Deadline: 5 days left
🛒 Type: Goods
View GEM
Chat with us