TenderDekho Logo
Get OEM Verified in 20 Days Apply
GEM

Indian Army Air Conditioner Tender Ganjam Odisha 2026 - 2 Ton/1.5 Ton ACs, Copper Pipe, AC Stand, Water Outlet Pipe

Bid Publish Date

30-Jun-2026, 7:30 pm

Bid End Date

10-Jul-2026, 8:00 pm

Progress

Issue30-Jun-2026, 7:30 pm
AwardPending
Explore all 4 tabs to view complete tender details

Quantity

7

Category

Air Conditioner 2 Ton

Bid Type

Single Packet Bid

Tender Overview

The Indian Army (Department of Military Affairs) invites bids for Air Conditioners (2 Ton and 1.5 Ton) along with ancillary items such as Copper Pipe, AC Stand, Water Outlet Pipe for installation at GOVALPUR ARMY AD RECORDS, GOPALPUR, GANJAM, ODISHA 761052. The procurement scope covers multiple product categories with a combined installation and commissioning consideration at the specified site. Bidders should be prepared to accommodate a potential quantity adjustment up to 25% during contract execution, with delivery timing linked to the original delivery window and extended periods as defined in the option clause. The address and on-site conditions are critical for site survey and planning. A clear emphasis on compliance with government procurement norms and dependable delivery performance is expected to be demonstrated by bidders. The BOQ shows five items, though detailed quantities are not listed, implying a bundled supply/installation package for air conditioning equipment and related piping & accessories. The tender prioritizes suppliers with prior govt experience, OEM capability, and robust financial standing. The optional site visit offers bidders the chance to verify installation constraints and refine bid estimates before submission.

Technical Specifications & Requirements

  • Items: Air Conditioners (2 Ton and 1.5 Ton), Copper Pipe, AC Stand, Water Outlet Pipe. No explicit technical specs published in the available data.
  • Delivery Location: ARMY AD RECORDS, GOPALPUR MILITARY STATION, GOPALPUR, GANJAM, ODISHA 761052. On-site commissioning may be in scope as per tender terms.
  • Experience: Minimum 3 years of regularly manufactured and supplied similar category products to Central/State Govt/PSU. Attach contracts demonstrating annual quantity during each year.
  • Option Clause: Up to 25% quantity variation allowed during/after contract at contracted rates; minimum extension time calculation requires careful scheduling.
  • Site Visit: Optional, with bidder bearing all costs and accepting site access conditions.

Terms, Conditions & Eligibility

  • EMD/Financial: Not explicitly listed; bidders must address financial standing and provide an undertaking against liquidation or bankruptcy.
  • Documents Required: PAN Card, GSTIN, Cancelled Cheque, EFT Mandate (certified by bank) to be uploaded with bid for Vendor Code Creation.
  • Delivery & Installation: Actual delivery and installation (if in scope) to be at the specified GOPALPUR address with adherence to delivery windows.
  • Payment Terms: Not specified; bidders should seek clarity during bid process.
  • Warranties & Penalties: Not specified in the data; ensure all terms align with government procurement norms during final bid.

Key Specifications

  • Air Conditioners: 2 Ton and 1.5 Ton

  • Ancillary items: Copper Pipe, AC Stand, Water Outlet Pipe

  • Delivery site: GOPALPUR MILITARY STATION, GANJAM, Odisha

  • Experience criterion: 3 years in govt supply of similar category products

  • Option clause: 25% quantity variation at contracted rates

  • Site visit: Optional, bidder bears visit costs

Terms & Conditions

  • EMD and detailed payment terms to be clarified in bid documents

  • Delivery extended timelines governed by option clause with minimum 30 days

  • 3 years govt supply experience mandatory with contract copies

Important Clauses

Payment Terms

Not specified in provided data; bidders must obtain explicit terms during tender briefing

Delivery Schedule

Delivery period starts from last date of original delivery order; extended time may be computed as (Increased quantity ÷ Original quantity) × Original delivery period with minimum 30 days

Penalties/Liquidated Damages

Not explicitly stated; expect standard govt procurement LD terms to be applied in final bid

Bidder Eligibility

  • Regularly manufactured and supplied similar Govt category products for 3 years

  • No liquidation or bankruptcy status; undertaking required

  • GSTIN, PAN, and EFT mandate documentation ready for Vendor Code Creation

Additional Tender Data

Commercial Details

Tender Category

Goods

Bid To RA

No

Bid To RA Enabled

No

Item Category

Air Conditioner 2 Ton , Air Conditioner 1.5 Ton , Copper Pipe , AC Stand , Water Outlet Pipe

Authority Records

MINISTRY OF DEFENCEMILITARY AFFAIRS DEPARTMENT

BID & GeM Expert Consultancy

End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.

Bid Preparation GeM Registration Document Filing

Free consultation · 24h response

Documents 4

GeM-Bidding-9540403.pdf

Main Document

BOQ Document

BOQ

BOQ Document

BOQ

GEM General Terms and Conditions Document

GEM_GENERAL_TERMS_AND_CONDITIONS

Past Similar Tenders (Historical Results)

5 found

Indian Army Air Conditioner & Accessories Tender Odisha 2026 - ISI/AC Standards, 3 Years Govt Experience, 25% Quantity Option

Indian Army

GANJAM, ODISHA

Posted: 23 April 2026
Closed: 4 May 2026
GEM

Air Conditioner,AC Stand,Copper Pipe,Outer Pipe,Installation

Indian Army

GANJAM, ODISHA

Posted: 18 August 2025
Closed: 28 August 2025
GEM

Air Conditioner 2 Ton,Air Conditioner one and half Ton,Installation,Uninstallation,Copper pipe

Indian Army

LUCKNOW, UTTAR PRADESH

Posted: 22 February 2025
Closed: 15 March 2025
GEM

AIR CONDITIONER 1.5 TON,AIR CONDITIONER 1 TON,AIR CONDITIONER OUTDOOR STAND,MODULAR AC BOX WITH MCB

Indian Air Force

JODHPUR, RAJASTHAN

Posted: 11 September 2025
Closed: 23 September 2025
GEM

AIR CONDITIONER 1.5 TON,AIR CONDITIONER 1 TON,AIR CONDITIONER OUTDOOR STAND,MODULAR AC BOX WITH MCB

Indian Air Force

JODHPUR, RAJASTHAN

Posted: 6 January 2026
Closed: 20 January 2026
GEM

Bill of Quantities (BOQ) 5 Items Sign in for GEM prices

#1

Air Conditioner 2 Ton

2 Ton Split

1 pieces Delivery: 15 days
#2

Air Conditioner 1.5 Ton

1.5 Ton Split

1 pieces Delivery: 15 days
#3

Copper Pipe

Copper Pipe Insulated

1 pieces Delivery: 15 days
#4

AC Stand

Iron Stand

1 pieces Delivery: 15 days
#5

Water Outlet Pipe

Plastic Pipe

3 pieces Delivery: 15 days

🤖 AI-Powered Bidder Prediction

Discover companies most likely to bid on this tender

Live AI
Historical Data

Required Documents

1

Copy of PAN Card

2

Copy of GSTIN

3

Copy of Cancelled Cheque

4

Copy of EFT Mandate certified by Bank

5

Experience certificates for similar govt supply

6

Contract copies demonstrating prior yearly quantities

7

OEM authorizations (if applicable)

8

Any undertaking on bidder financial standing

Frequently Asked Questions

Key insights about ODISHA tender market

How to bid for air conditioner tender in Ganjam Odisha 2026?

Bidders must submit PAN, GSTIN, cancelled cheque, and EFT mandate with bid. Demonstrate 3 years govt supply experience via contract copies. Ensure compliance with the option clause allowing up to 25% quantity variation and provide site visit readiness if needed. Detailed terms will be issued in the bid document.

What documents are required for govt air conditioner procurement in Odisha?

Required documents include PAN, GSTIN, cancelled cheque, EFT mandate certified by bank, and copies of contracts proving govt supply experience for 3 years. OEM authorizations may be needed for branded AC units and copper pipe supplies, along with financial statements if requested.

What are the technical specs for 2 Ton and 1.5 Ton AC in this tender?

Specific performance specs are not published in the data. Bidders should expect standard govt procurement norms and ensure ISI/ISI-like certifications if required, compatibility with copper piping and supporting accessories, and installation readiness at GOPALPUR MILITARY STATION.

When is the delivery deadline for the Army AC package in Odisha?

Delivery timing is governed by the original delivery order and extended period as per the option clause. The calculated extension uses (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum of 30 days, and may extend to the original delivery window during contract execution.

What are the eligibility criteria for govt suppliers of air conditioners in Odisha?

Eligibility requires 3 years of regular govt supply experience for the same or similar products, with contract copies for each year. Bidder must be financially solvent, not under liquidation, and must provide PAN, GSTIN, and EFT mandate documentation for vendor code creation.

What are the key terms for delivery and installation at GOPALPUR?

Delivery and installation, if within scope, must be at ARMY AD RECORDS, GOPALPUR, GANJAM, Odisha 761052. Optional site visit allows verification, with bidder bearing costs. On-site access is permitted under indemnity terms; installation quality should comply with govt standards.

Which items comprise the BOM for this Army procurement in Odisha?

The BOM includes Air Conditioners (2 Ton and 1.5 Ton), Copper Pipe, AC Stand, and Water Outlet Pipe. The BoQ lists five items but detailed quantities are not provided in the data. Bidders should prepare for bundled supply and installation.

Similar Tenders

5 found

Indian Army Window Air Conditioner 1.5 Ton Tender 2026 – Stabilizer, Drainage Pipe, Installation & Stand

Indian Army

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

Air Conditioner 2 Ton,Split Air Conditioner 1.5 Ton,Stabilizer for 2 Ton,Stabilizer for 1.5 Ton,Cop

Indian Army

Est: ₹1.3
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM

Bank Of Baroda Air Conditioning Tender Darjeeling West Bengal 1.5 Ton Five Star Split A/C Installation 2026

Bank Of Baroda

📍 DARJEELING, WEST BENGAL

⏰ Deadline: 2 weeks left
🛒 Type: Goods
View GEM
Urgent

AC,AC.,INSTALLATION,COPPER PIPE,DRAIN PIPE,UNINSTALLATION,WALL STAND

Union Bank Of India (ubi)

📍 AGRA, UTTAR PRADESH

EMD: ₹17,000
Est: ₹8.5 L
⏰ Deadline: 2 days left
🛒 Type: Goods
View GEM
Urgent

Stand,copper pipe 10 mtr,Ac 2 ton,Stabilizer,Installation charges

Director General Of National Cadet Corps (dgncc)

📍 CHANDAULI, UTTAR PRADESH

⏰ Deadline: 4 days left
🛒 Type: Goods
View GEM