Spare1,Spare2,Spare3,Spare4,Spare5,Spare6,Spare7,Spare8,Spare9,Spare10,Spare11,Spare12,Spare13,Spar
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Bid Publish Date
12-Jun-2026, 12:49 am
Bid End Date
27-Jun-2026, 11:00 am
Location
Progress
Quantity
90
Category
SPARE1
Bid Type
Single Packet Bid
Organization: Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (UPRVUNL), Lucknow. Procurement: Supply of spare parts (26 items listed as SPARE1 through SPARE26) with delivery via road, door delivery basis to DTPS Anpara area, Sonbhadra, Uttar Pradesh. Scope: Only supply of goods; bidders must acknowledge PO and provide required certificates. Financials: No explicit EMD amount published; payment terms specify 100% payment against Tax Invoice through RTGS/NEFT after material inspection at Central Store. Warranty: 12 months from commissioning or 18 months from supply, whichever comes first. Delivery flexibility: Option clause allows up to 25% quantity variation during contract, with extended delivery time calculated as (Additional quantity / Original quantity) × Original delivery period, minimum 30 days. Unique terms include road transport insurance and proper packing.
Spare parts procurement: 26 items (SPARE1–SPARE26)
Delivery: door delivery to DTPS Anpara, Sonbhadra, UP
Warranty: 12 months from commissioning or 18 months from supply
Penalties: Liquidated Damages 0.5% per week, max 10%
Payment: 100% on Tax Invoice via RTGS/NEFT after verification
Certificates: Interchangeability, Guarantee/Warranty
Option to increase/decrease quantity up to 25% at contract time
All payments on invoice through RTGS/NEFT after inspection
Mandatory certificates: Interchangeability and Warranty documents
100% payment against Tax Invoice via RTGS/NEFT after receipt and verification at Central Store, DTPS Anpara
Door delivery via road transport; extension for additional quantity calculated with minimum 30 days
LD at 0.5% per week, maximum 10% on undelivered portions
Capable of supplying 26 specified spare items to DTPS Anpara, UP
Compliance with RTGS/NEFT payment flow and bank details provision
Submission of Interchangeability & Warranty Certificates with bid
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
No
Item Category
SPARE1 , SPARE2 , SPARE3 , SPARE4 , SPARE5 , SPARE6 , SPARE7 , SPARE8 , SPARE9 , SPARE10 , SPARE11 , SPARE12 , SPARE13 , SPARE14 , SPARE15 , SPARE16 , SPARE17 , SPARE18 , SPARE19 , SPARE20 , SPARE21 , SPARE22 , SPARE23 , SPARE24 , SPARE25 , SPARE26
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Odisha Power Generation Corporation Limited
JHARSUGUDA, ODISHA
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Nuclear Power Corporation Of India Limited
CHITTORGARH, RAJASTHAN
Tender Results
Loading results...
SPARE1
Thrust bearing with Race set, SA30A32
SPARE2
THERMAL OLR SA30AF32
SPARE3
Mechanical POS IND, SA30A32
SPARE4
Oil Seal Kit, SA30A32
SPARE5
Reversing Contactor, SA30A32
SPARE6
Power module E-Pac unit 2
SPARE7
Limit switch 2NO/NC, SA30A32
SPARE8
Torque switch drive assembly, SA30A32
SPARE9
Limit Switch Drive Assembly, SA30A32
SPARE10
Thrust bearing with Race set, SA 50 AB32
SPARE11
Thermal Overload Relay, SA 50 AB32
SPARE12
Mechanical POS IND, SA50 AB32
SPARE13
Oil Seal Kit, Part No 13 & 14, SA 50 AB32
SPARE14
Reversing Contactor, SA 50 AB32
SPARE15
CONTROL UNIT COMPLETE
SPARE16
COMPLETE E PACK SA60A904053513029/SA60A90
SPARE17
Torque switch drive assembly, SA 50 AB32
SPARE18
Limit Switch Drive Assy. (Auma- SA50E)
SPARE19
360301 COMPLETE ACTUATOR SA100E125 AUMA SA100E125
SPARE20
CONTROL UNIT COMPLETE
SPARE21
36030101 THRUST BRG RACE Auma SA100
SPARE22
Thermal OLR (3RU1136B0)-36-45 Amp
SPARE23
Oil Seal Kit for SA100 Actuator ANK200.372
SPARE24
Contactor
SPARE25
Power module E-Pac unit 2
SPARE26
Torque switch assembly for SMB-000
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | SPARE1 | Thrust bearing with Race set, SA30A32 | 4 | pieces | con6.uprvu.up | 30 | |
| 2 | SPARE2 | THERMAL OLR SA30AF32 | 4 | pieces | con6.uprvu.up | 30 | |
| 3 | SPARE3 | Mechanical POS IND, SA30A32 | 2 | pieces | con6.uprvu.up | 30 | |
| 4 | SPARE4 | Oil Seal Kit, SA30A32 | 4 | pieces | con6.uprvu.up | 30 | |
| 5 | SPARE5 | Reversing Contactor, SA30A32 | 4 | pieces | con6.uprvu.up | 30 | |
| 6 | SPARE6 | Power module E-Pac unit 2 | 5 | pieces | con6.uprvu.up | 30 | |
| 7 | SPARE7 | Limit switch 2NO/NC, SA30A32 | 4 | pieces | con6.uprvu.up | 30 | |
| 8 | SPARE8 | Torque switch drive assembly, SA30A32 | 4 | pieces | con6.uprvu.up | 30 | |
| 9 | SPARE9 | Limit Switch Drive Assembly, SA30A32 | 2 | pieces | con6.uprvu.up | 30 | |
| 10 | SPARE10 | Thrust bearing with Race set, SA 50 AB32 | 3 | pieces | con6.uprvu.up | 30 | |
| 11 | SPARE11 | Thermal Overload Relay, SA 50 AB32 | 3 | pieces | con6.uprvu.up | 30 | |
| 12 | SPARE12 | Mechanical POS IND, SA50 AB32 | 2 | pieces | con6.uprvu.up | 30 | |
| 13 | SPARE13 | Oil Seal Kit, Part No 13 & 14, SA 50 AB32 | 4 | pieces | con6.uprvu.up | 30 | |
| 14 | SPARE14 | Reversing Contactor, SA 50 AB32 | 4 | pieces | con6.uprvu.up | 30 | |
| 15 | SPARE15 | CONTROL UNIT COMPLETE | 4 | pieces | con6.uprvu.up | 30 | |
| 16 | SPARE16 | COMPLETE E PACK SA60A904053513029/SA60A90 | 2 | pieces | con6.uprvu.up | 30 | |
| 17 | SPARE17 | Torque switch drive assembly, SA 50 AB32 | 4 | pieces | con6.uprvu.up | 30 | |
| 18 | SPARE18 | Limit Switch Drive Assy. (Auma- SA50E) | 5 | pieces | con6.uprvu.up | 30 | |
| 19 | SPARE19 | 360301 COMPLETE ACTUATOR SA100E125 AUMA SA100E125 | 1 | pieces | con6.uprvu.up | 30 | |
| 20 | SPARE20 | CONTROL UNIT COMPLETE | 4 | pieces | con6.uprvu.up | 30 | |
| 21 | SPARE21 | 36030101 THRUST BRG RACE Auma SA100 | 4 | pieces | con6.uprvu.up | 30 | |
| 22 | SPARE22 | Thermal OLR (3RU1136B0)-36-45 Amp | 3 | pieces | con6.uprvu.up | 30 | |
| 23 | SPARE23 | Oil Seal Kit for SA100 Actuator ANK200.372 | 4 | pieces | con6.uprvu.up | 30 | |
| 24 | SPARE24 | Contactor | 3 | pieces | con6.uprvu.up | 30 | |
| 25 | SPARE25 | Power module E-Pac unit 2 | 3 | pieces | con6.uprvu.up | 30 | |
| 26 | SPARE26 | Torque switch assembly for SMB-000 | 4 | pieces | con6.uprvu.up | 30 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Interchangeability Certificate
Guarantee/Warranty Certificate
Tax Invoice acknowledgment
OEM authorization (if applicable)
Any other certificates requested in terms/ATC
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, Interchangeability and Warranty certificates, and a Tax Invoice backed by RTGS/NEFT payment details. The contract allows up to 25% quantity variation and requires door-delivery to DTPS Anpara with insured road transport. Ensure you upload all requested certificates in the bid documents.
Required documents include GST certificate, PAN card, Interchangeability Certificate, Guarantee/Warranty Certificate, Tax Invoice acknowledgment, and any OEM authorizations if applicable. Ensure submission with bid, along with PO acknowledgment and proper packing details for door-delivery to Anpara.
Payment is 100% against Tax Invoice through RTGS/NEFT after receipt and inspection at the Central Store, DTPS Anpara. Include complete bank details (account, IFSC, MICR, bank name) with the invoice to avoid payment delays.
Goods must be dispatched by road transport, insured for transit risk, with door delivery to DTPS Anpara, Sonbhadra. The option clause allows up to 25% quantity variation and extended delivery time calculated with a minimum 30 days; ensure packaging meets road transport standards.
Warranty runs for 12 months from commissioning or 18 months from supply, whichever occurs earlier. The warranty certificate must be provided; non-conforming items may be subject to penalties per the LD clause.
The purchaser may increase/decrease quantity up to 25% of bid quantity at contract, and during currency up to 25% at contracted rates. Additional time is calculated as (Additional / Original) × Original delivery period, with a minimum of 30 days.
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited (uprvunl) Lucknow
📍 SONBHADRA, UTTAR PRADESH
Sign up now to access all documents
Main Document
BOQ
BOQ
BOQ
OTHER
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS