Indian Army Department of Military Affairs Starter Motor 24V 89KW Water Proof Alwar Rajasthan Tender 2026
Indian Army
ALWAR, RAJASTHAN
Bid Publish Date
23-Jan-2026, 4:24 pm
Bid End Date
03-Feb-2026, 5:00 pm
EMD
₹84,646
Value
₹42,32,344
Location
Progress
Quantity
34
Category
Electro Magnetic Water Flowmetre pipe dia 100mm and Meter size 80mm
Bid Type
Two Packet Bid
Organization: North Eastern Electric Power Corporation Limited ( Hydro Power ). Location: West Tripura, Tripura 799001. Procurement scope: Electro Magnetic Water Flowmeters (pipe dia 100mm and meter size 80mm; pipe dia 80mm with meter size 80mm), ITC of Flow Meter, and Telemetry system for 10 nos of flow meters plus 2 existing level sensors. AMC requirements cover 1st–4th year. Estimated value: ₹4,232,344; EMD: ₹84,646. 8 BOQ items are listed but detailed quantities/units are not provided. Tender emphasizes integration of flowmeters with telemetry and ongoing maintenance commitment. This procurement targets reliable irrigation/hydroelectric monitoring equipment with supplier responsibility for ITC compliance and long-term service. Unique aspects include telemetric integration for multiple meters and staged AMC across four years.
Electro Magnetic Water Flowmeters: pipe diameters 100mm and 80mm, meter size 80mm
Telemetry system for 10 flow meters and 2 existing level sensors
AMC coverage: Year 1 through Year 4
Estimated project value ₹42,32,344 and EMD ₹84,646
On-site installation in West Tripura, Tripura
EMD: ₹84,646; must be submitted with bid
4-year AMC requirement (Years 1-4) with on-site support
Telemetry integration for 10 meters and 2 level sensors
Payment terms to be defined in contract; likely milestone-based or post-delivery within 30 days of invoice
On-site delivery and commissioning in West Tripura; exact dates to be specified in ATC
LD provisions for delays or non-conformance; details to be clarified in ATC
Experience in supplying flowmeters and telemetry systems for hydro/utility projects
Financial capability to support a ₹42 Lakh project and AMC commitments
Authorized OEM distributor or evidence of capability for EM flowmeters
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
ALWAR, RAJASTHAN
Indian Army
WEST DELHI, DELHI
Indian Army
BARAMULLA, JAMMU & KASHMIR
Controller General Of Defence Accounts
BIKANER, RAJASTHAN
Indian Army
EAST KHASI HILLS, MEGHALAYA
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | Electro Magnetic Water Flowmetre pipe dia 100mm and Meter size 80mm | Electro Magnetic Water Flowmetre including Mating Flanges and Expander Reducer in CS along with fasteners and RTU cum Protection panel pipe dia 100 mm, Meter size 80mm | 7 | nos | storeswingagtccpp | 84 |
| 2 | Electro Magnetic Water Flowmetre pipe dia 80mm and Meter size 80mm | Electro Magnetic Water Flowmetre including Mating Flanges and Expander Reducer in CS along with fasteners and RTU cum Protection panel pipe dia 80 mm, Meter size 80mm | 3 | nos | storeswingagtccpp | 84 |
| 3 | ITC of Flow meter | Installation,testing and Commissioning of Flow Meter | 10 | nos | eciwingagtccpp | 100 |
| 4 | Telemetry system for 10 nos of flow meter and 2 nos of existing level sensor | Telemetry system for 10 nos of flow meter and 2 nos of existing level sensor for 4 years cloud service | 10 | nos | eciwingagtccpp | 100 |
| 5 | AMC 1st Year | AMC from the end of warranty date for 1st year for flow meter 2 visits per year | 1 | nos | eciwingagtccpp | 814 |
| 6 | AMC 2nd Year | AMC from the end of warranty date for 2nd year for flow meter (2 visits per year) | 1 | nos | eciwingagtccpp | 1,179 |
| 7 | AMC 3rd Year | AMC from the end of warranty date for 3rd year for flow meter (2 visits per year) | 1 | nos | eciwingagtccpp | 1,544 |
| 8 | AMC 4th Year | AMC from the end of warranty date for 4th year for flow meter (2 visits per year) | 1 | nos | eciwingagtccpp | 1,909 |
Discover companies most likely to bid on this tender
GST registration certificate
Permanent Account Number (PAN) card
Experience certificates for similar flowmeter/telemetry projects
Financial statements (last 2-3 years)
EMD submission proof
Technical bid documents and compliance certificates
OEM authorizations (if applicable) for EM flowmeters
Installation/commissioning reports from prior projects
Key insights about TRIPURA tender market
Bidders should submit the technical and commercial bids with GST, PAN, and EMD ₹84,646. Provide prior experience in EM flowmeters and telemetry systems, OEM authorizations if applicable, and AMC capability for Years 1–4. Ensure on-site deployment readiness and compliance with ITC requirements for flowmeters.
Required documents include GST certificate, PAN, company profile, 2–3 years financial statements, experience certificates for similar deployments, EMD proof of ₹84,646, technical bid, and OEM authorizations or substantiated capability for EM flowmeters and telemetry equipment.
The scope includes EM flowmeters with pipe diameters 100mm and 80mm, and meter size 80mm; telemetery system for 10 meters and 2 level sensors; ITC compliance for flowmeters; on-site installation in West Tripura; and AMC for four consecutive years.
AMC spans Years 1 through 4 of contract: Year 1, Year 2, Year 3, and Year 4. Bidders must propose maintenance, spares, and on-site support accordingly; exact service levels will be defined in the contract terms.
EMD is ₹84,646 and the estimated contract value is ₹42,32,344. Bidders must submit EMD per tender rules and price bids reflecting scope for EM flowmeters, ITC, telemetry, and multi-year AMC.
Bidders must demonstrate telemetry compatibility with 2 existing level sensors, including data communication interfaces and integration with NEPCL monitoring framework; provide installation and commissioning plan and commissioning test results.
On-site delivery and commissioning are required in West Tripura, Tripura. Precise delivery dates are specified in the ATC; bidders should allocate resources for site readiness, transportation to West Tripura, and on-site testing.
Bidders should provide GST, PAN, and relevant experience certificates; OEM authorization for EM flowmeters is preferred; compliance with ITC for flowmeters and telemetry devices, plus warranty and service commitments for four-year AMC.
N/a
Indian Army
📍 KOLKATA, WEST BENGAL
Indian Army
📍 SONITPUR, ASSAM
Indian Army
📍 SONITPUR, ASSAM
Indian Army
📍 AMRITSAR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS