Armature Assy,Battery Cut off Switch,Brush Gear Assy,Field Coil Assy,Hub Front Wheel,Cover Assy,Elb
Indian Army
DEHRADUN, UTTARAKHAND
Bid Publish Date
23-Jan-2026, 1:59 pm
Bid End Date
02-Feb-2026, 2:00 pm
Location
Progress
Quantity
40
Category
ARMATURE
Bid Type
Two Packet Bid
The Indian Army, Department Of Military Affairs, invites bids for a broad range of electrical components and assemblies, including ARMATURE, ISOLATOR SWITCH, BRUSH CARRIER ASSEMBLY, REGULATOR, STARTER ASSEMBLY, RELAY 12V, GEAR PRIMARY DRIVE, HOSE FRONT FLEXIBLE, and related items. The BoQ lists 29 items, though specific quantities and unit measures are not disclosed. The procurement is conducted under an open tender framework with an ATC/ATC-uploaded document referenced by the buyer. An important feature is a flexible quantity option clause allowing up to 25% increase in bid quantity and 25% variation during contract execution at contracted rates. Delivery timing is tied to last delivery order date, with a minimum extension period of 30 days when options are exercised.
Option Clause permits ±25% quantity variation at contract and during currency
Delivery extension rules apply with minimum 30 days; formula-based time increase
Review and comply with Buyer Uploaded ATC/ATC document for full specs
Not specified in data; bidders must consult ATC for payment milestones and schedule
Delivery period linked to last date of original delivery order; extended period when option is exercised
Not specified in data; check ATC for LD/penalty terms
Experience in supplying electrical components and assemblies to government or military procurement
Demonstrated financial capacity through audited statements
Compliance with OEM authorizations and applicable standards as per ATC
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Indian Army
DEHRADUN, UTTARAKHAND
Indian Army
RANCHI, JHARKHAND
Indian Army
RANCHI, JHARKHAND
Indian Army
JAMMU, JAMMU & KASHMIR
Indian Army
JAISALMER, RAJASTHAN
Tender Results
Loading results...
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) |
|---|---|---|---|---|---|---|
| 1 | ARMATURE | ARMATURE | 1 | pieces | [email protected] | 21 |
| 2 | ISOLATOR SWITCH | ISOLATOR SWITCH | 2 | pieces | [email protected] | 21 |
| 3 | BRUSH CARRIER ASSY | BRUSH CARRIER ASSY | 1 | pieces | [email protected] | 21 |
| 4 | POLE SCREW | POLE SCREW | 8 | pieces | [email protected] | 21 |
| 5 | SOLENOID | SOLENOID | 1 | pieces | [email protected] | 21 |
| 6 | REPAIR KIT | REPAIR KIT | 1 | pieces | [email protected] | 21 |
| 7 | BUSH | BUSH | 1 | pieces | [email protected] | 21 |
| 8 | REGULATOR ENGINE GENERATOR | REGULATOR ENGINE GENERATOR | 1 | pieces | [email protected] | 21 |
| 9 | STARTER ASSY | STARTER ASSY | 1 | pieces | [email protected] | 21 |
| 10 | REGULATOR | REGULATOR | 1 | pieces | [email protected] | 21 |
| 11 | PARTS KIT POWER STEERING | PARTS KIT POWER STEERING | 1 | pieces | [email protected] | 21 |
| 12 | REGULATOR SR 60 | REGULATOR SR 60 | 1 | pieces | [email protected] | 21 |
| 13 | HORN LOW | HORN LOW | 1 | pieces | [email protected] | 21 |
| 14 | ROLLER COMP CAM CHAIN GUIDE | ROLLER COMP CAM CHAIN GUIDE | 1 | pieces | [email protected] | 21 |
| 15 | GEAR PRIMARY DRIVE | GEAR PRIMARY DRIVE | 1 | pieces | [email protected] | 21 |
| 16 | CHAIN DRIVE | CHAIN DRIVE | 2 | pieces | [email protected] | 21 |
| 17 | HOSE FRONT FLEXIBLE | HOSE FRONT FLEXIBLE | 1 | pieces | [email protected] | 21 |
| 18 | COMBINATION SWITCH | COMBINATION SWITCH | 1 | pieces | [email protected] | 21 |
| 19 | REPAIR KIT FOR ACCESORIES WIPER | REPAIR KIT FOR ACCESORIES WIPER | 2 | pieces | [email protected] | 21 |
| 20 | ARMATURE ASSY | ARMATURE ASSY | 1 | pieces | [email protected] | 21 |
| 21 | FIELD COIL | FIELD COIL | 1 | pieces | [email protected] | 21 |
| 22 | BRUSH CARRIER ASSY | BRUSH CARRIER ASSY | 1 | pieces | [email protected] | 21 |
| 23 | PINION DRIVE | PINION DRIVE | 1 | pieces | [email protected] | 21 |
| 24 | BRUSH CARRIER ASSY | BRUSH CARRIER ASSY | 1 | pieces | [email protected] | 21 |
| 25 | FIELD COIL ASSY | FIELD COIL ASSY | 1 | pieces | [email protected] | 21 |
| 26 | RELAY 12V | RELAY 12V | 1 | pieces | [email protected] | 21 |
| 27 | BRG CLUTCH RELEASE | BRG CLUTCH RELEASE | 2 | pieces | [email protected] | 21 |
| 28 | CONE ROLLER FRONT WHEEL BRG INNER FRONT | CONE ROLLER FRONT WHEEL BRG INNER FRONT | 1 | pieces | [email protected] | 21 |
| 29 | OIL SEAL | OIL SEAL | 1 | pieces | [email protected] | 21 |
Discover companies most likely to bid on this tender
GST certificate
Permanent Account Number (PAN) card
Experience certificates for similar electrical component supply
Financial statements (profit & loss, balance sheet or audited statements)
EMD/Security deposit details (as per ATC)
Technical bid documents demonstrating compliance with listed item categories
OEM authorizations (where applicable for specific brands)
Any technical compliance certificates or IS/ISO certifications as required by ATC
Key insights about UTTARAKHAND tender market
Bidders should review the ATC document uploaded by the buyer, register on the official tender portal, submit GST and PAN, provide experience in similar supply, financial statements, EMD as per ATC, and OEM authorizations where required. Ensure compliance with the 25% optional quantity clause and delivery-extension formula.
Required documents include GST certificate, PAN, experience certificates for similar electrical components, financial statements, EMD details, technical bid demonstrating compliance with listed item categories, and OEM authorizations where applicable. The ATC may specify additional certifications and testing reports.
Categories include ARMATURE, ISOLATOR SWITCH, BRUSH CARRIER ASSEMBLY, REGULATOR, STARTER ASSEMBLY, RELAY 12V, FIELD COIL, and OIL SEAL, among 29 items. Exact quantities and specs are provided in the ATC; bidders must review the document for item-wise requirements.
Delivery extensions occur when the option clause is exercised, calculated as (Increased quantity ÷ Original quantity) × Original delivery period, with a minimum extension of 30 days. If the original period is under 30 days, the extension equals the original period.
The tender data does not list explicit standards; bidders should verify in the ATC and OEM documentation for IS, ISI, ISO, or other standards, along with any testing or quality certification requirements mandated by the Indian Army procurement process.
BoQ comprises 29 item lines covering electrical components and related assemblies, including armature, regulator, relay, and mechanical parts. Specific quantities and unit measures are not disclosed in the public data and must be obtained from the ATC document.
The payment terms are not specified in the available data. Bidders must consult the ATC for payment milestones, advance/retention terms, and any conditional payments tied to delivery or milestones as per Army procurement norms.
Assam Rifles
Hindustan Petroleum Corporation Ltd
📍 SANGLI, MAHARASHTRA
Indian Army
📍 BIKANER, RAJASTHAN
Indian Army
📍 TINSUKIA, ASSAM
Indian Army
📍 GURDASPUR, PUNJAB
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS