Urban Development Department Uttar Pradesh Rope Light Tender IS 10322 Ambedkar Nagar 2025
N/a
AMBEDKAR NAGAR, UTTAR PRADESH
Bid Publish Date
09-Jan-2026, 4:20 pm
Bid End Date
30-Jan-2026, 6:00 pm
EMD
₹20,400
Value
₹6,80,000
Location
Progress
Quantity
340
Bid Type
Two Packet Bid
A tender has been published for Nagar Panchayat Bhairamgarh LED Luminaire for Road and Street Lights (V2) Conforming to IS 10322 (Part 5 / Section 3) (Q3) in BIJAPUR, CHHATTISGARH. Quantity: 340 by. Submission Deadline: 30-01-2026 18: 00: 00. Check eligibility and apply.
N/a
AMBEDKAR NAGAR, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
PILIBHIT, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
GORAKHPUR, UTTAR PRADESH
South Central Railway
HYDERABAD, TELANGANA
E-nagar Palika Government Of Madhya Pradesh
SHAJAPUR, MADHYA PRADESH
Tender Results
Loading results...
| Category | Specification | Requirement |
|---|---|---|
| LED RATING | LED Rating (in Watts)/ System Wattage/ Rated Power | 18, 24, 30, 36, 40, 45, 48, 60, 70, 72, 90, 100, 110, 120, 140, 150, 180, 200 |
| LED RATING | LED luminaire luminous Efficacy (Lumen/watt) (Hint: Total Lumen Calculation: Example: 18 W LED Rating x 100 Lumen/Watt = 1800 Lumens, 18 W LED Rating x 120 Lumen / Watt = 2160 Lumens, 18 W LED Rating x 140 Lumen/Watt = 2520 Lumens) | 100, 120, 140 Or higher |
| ELECTRICAL CHARACTERISTIC | Input operating voltage range and frequency | 90 to 300 Volts AC at 50 Hz +/-2, 140 to 270 Volts AC at 50 Hz +/-2 |
| CONTROL GEAR | Number of electronic control gear in the luminaire (power supplies) | 1, 2 Or higher |
| LUMINAIRE | Provision of luminaire connecting wire along with the supply of material | 40 cm (ISI marked to IS 9968), 50 cm (ISI marked to IS 9968), 100 cm (ISI marked to IS 9968) |
| REPORTS AND CERTIFICATIONS | Warranty for free replacement (in years) | 2, 3, 4, 5 Or higher |
Discover companies most likely to bid on this tender
Experience Criteria
Past Performance
Bidder Turnover
Certificate (Requested in ATC)
OEM Authorization Certificate
OEM Annual Turnover
Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience / Turnover Criteria
the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer
Urban Administration And Devlopment
📍 SAGAR, MADHYA PRADESH
Urban Administration And Devlopment
📍 SAGAR, MADHYA PRADESH
Institute Of Liver And Biliary Sciences
📍 SOUTH DELHI, DELHI
Rail Coach Factory Kapurthala
📍 KAPURTHALA, PUNJAB
N/a
Sign up now to access all documents
Main Document
CATALOG Specification
GEM_GENERAL_TERMS_AND_CONDITIONS