• Design and Planning: Develop detailed engineering drawings and project plans based on tender specifications.
• Procurement: Acquire all necessary materials, including 600 mm diameter DI pipes, fittings, and accessories, complying with technical standards.
• Construction: Execute trench excavation, pipe laying, jointing, and backfilling as per approved drawings.
• Installation: Ensure proper alignment, slope, and connection to existing sewer network.
• Testing and Commissioning: Conduct pressure tests, leak detection, and quality assurance before final commissioning.
The process involves:
- Pre-construction survey and site preparation
- Material delivery and storage
- Pipe installation and jointing
- Backfilling and surface restoration
- Final testing and handover
| Key Specifications |
Details |
| Pipe Diameter |
600 mm DI pipes |
| Length of Main |
Approx. based on site survey |
| Construction Period |
12 months |
| Completion Deadline |
16-12-2026 |
All work must adhere to safety standards, environmental regulations, and technical guidelines specified in the tender documents.