The project involves high-voltage live line work on 400KV transmission lines. The insulators used must meet IS standards for 400KV systems. The fault locater kits and tools employed should be calibrated and certified, with documentation submitted during bid. The technical process includes site verification, mobilization, execution of hot line replacement, and testing. Equipment used must be compliant with safety standards, including insulated tools and live line work gear. The work sequence involves initial site assessment, safety setup, execution of insulator replacement, and final testing. All technical parameters must conform to GETCO specifications, ensuring reliability and safety during live line operations.
| Technical Parameter |
Specification |
| Voltage Level |
400KV |
| Insulator Type |
Suspension/Line Insulator |
| Tools |
Fault locators, calibrated tools |
| Safety Gear |
Insulated suits, gloves |
| Testing |
Post-installation testing and commissioning |
The process is sequential, starting with site verification, followed by equipment setup, live line work, testing, and documentation.