Carriage of PCC and STP poles 8.5, 11 and 13 Mtr,Carriage of line material,Erection of PCC and STP
Uttar Pradesh Power Corporation Limited (uppcl)
ALIGARH, UTTAR PRADESH
Bid Publish Date
06-Apr-2026, 6:30 pm
Bid End Date
11-May-2026, 3:00 pm
EMD
₹20,000
Location
Progress
Quantity
32394
Category
25 KVA Transformer
Bid Type
Two Packet Bid
The Uttar Pradesh Power Corporation Limited (UPPCL) invites bidders for a comprehensive transmission and distribution works package in Aligarh, Uttar Pradesh. The scope spans PCC and STP poles of 8.5, 11 and 13 meters, carriage of line material, installation and fixing of 11 KV TPMO, erection and grouting of stay sets, and installation of ACSR conductors including Weasal, Rabbit, Dog, and ABC variants. Additional items cover transformers from 25 KVA to 400 KVA, dismantling old PCC/STP poles, under/overhead cable laying, and both guarding of 11 KV lines and earthing rod fixing. Estimated value is not disclosed; EMD is ₹20,000. The contract allows a quantity variation cap of 25%, with delivery timelines linked to the original delivery order. Location-specific execution is in Aligarh, Uttar Pradesh, 202001.
PCC/STP poles: 8.5m, 11m, 13m
Conductor types: ACSR Weasal, Rabbit, Dog; ABC conductor
Transformers: 25 KVA, 63 KVA, 100 KVA, 400 KVA
Erection, fixing, and grouting of stay sets
Underground and overhead cable laying
Earthing rod fixation and clamps for LT
Dismantling of old PCC/STP poles and associated works
Guarding of 11 KV line; tree trimming/branch chopping
EMD: ₹20,000; 25% quantity variation allowed
Delivery period linked to original order; extended time rules apply
Submission under ATC; OEM/technical compliance required
Delivery period starts from last date of original delivery order; if quantity increases, time is scaled as (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days; extensions allowed per contract
EMD amount of ₹20,000; terms for security deposit as per conditions in ATC; ensure submission with bid
Purchaser may increase/decrease quantity up to 25% at contracted rates during or after contract; bidders must comply
Experience in electrical transmission/POLE erection and line work
Demonstrated capability to install transformers (25–400 KVA)
Financial stability evidenced by recent financial statements
Tender Category
Goods
Bid To RA
No
Bid To RA Enabled
Yes
Item Category
PCC and STP poles 8.5, 11 and 13 Mtr , Carriage of line material , Installation and fixing of 11 KV TPMO. , Erection and Grouting of stay set , Providing and fixing , ACSR Weasal, Rabbit and Dog Conductor. , ABC Conductor , Grouting of PCC and STP poles , plinth , Fixing of earthing rod , Chopping of tree branches , Providing and Fixing of Clamps of LT , Providing and Fixing , 25 KVA Transformer , 63 KVA Transformer , 100 KVA Transformer , 400 KVA Transformer , Dismentling of old PCC and STP poles , Dismantling and removal , Erection of section , Carriage and Installation , Provding and Fixing, Filling , Safe carriage , Laying of under ground cable , Laying of Overhead cable , Guarding of 11 KV Line by laying two nos , Safe Carriage and Installation , Safe carriage and Installation , Provding and Fixing Wearing
End-to-end support — bid preparation, GeM registration, document filing & compliance by industry experts.
Free consultation · 24h response
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS
Uttar Pradesh Power Corporation Limited (uppcl)
ALIGARH, UTTAR PRADESH
Uttar Pradesh Power Corporation Limited (uppcl)
ALIGARH, UTTAR PRADESH
Uttar Pradesh Power Corporation Limited (uppcl)
ETAH, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
GORAKHPUR, UTTAR PRADESH
Bharat Sanchar Nigam Limited Portal(bsnl)
PATNA, BIHAR
Tender Results
Loading results...
PCC and STP poles 8.5, 11 and 13 Mtr
Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms
Carriage of line material
Carriage of line material viz LT Cable, Conductor, GI earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms
PCC and STP poles 8.5, 11 and 13 Mtr
Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work
PCC and STP poles 8.5, 11 and 13 Mtr
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Installation and fixing of 11 KV TPMO.
Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work
Erection and Grouting of stay set
Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work
Providing and fixing
Providing and fixing of stay insulator
ACSR Weasal, Rabbit and Dog Conductor.
Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work
ABC Conductor
ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm
Grouting of PCC and STP poles
Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms
plinth
Making the plinth of Steel poles
Fixing of earthing rod
Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T and P etc Required for proper completion of work
Chopping of tree branches
Chopping of tree branches which are touching to HT and LT lines
Providing and Fixing of Clamps of LT
Providing and Fixing of Clamps of LT, Cross Arm Holding, F Clamp, Stay Clamp, Danger board clamp and all type clamps with Nut and Bolts as per actual site requirement
Providing and Fixing
Providing and Fixing of LT shackle insulator
Providing and Fixing
Providing and Fixing of missing Nut bolts and washer
25 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
63 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
100 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
400 KVA Transformer
Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work
Dismentling of old PCC and STP poles
Dismentling of old PCC and STP poles for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T and P carrier etc required for proper completion of work
Dismantling and removal
Dismantling and removal of existing conductor, cable, GI Wire from the various area preparing their coils and then stacking in the respective JEOs Store as per direction of Supervising Engineer It includes the work of cartage, cost of labour, T nad P carrier etc required for proper completion of work
Erection of section
Erection of section Tee pole including fixing of all fittings as per RESPO norms
Carriage and Installation
Carriage and Installation of LT distribution box three phase distribution box from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESSPO norms
Provding and Fixing, Filling
Provding and Fixing and Filling of 3x70,3x120,3X185 11 KV XLPE heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour T and P carrier etc for proper completion of work
Safe carriage
Safe carriage of 3x70,3x120,3X185,3x300 Sqmm 33 KV by 11 KV XLPE Cable from Store Center to respective site of work including loading and unloading at both ends for proper completion of work
Laying of under ground cable
Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling Spare cable shall be left and buried in the trench in the shape of rings at both ends All material except cable, labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost
Laying of Overhead cable
Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV Overhead cable work includes labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost
Guarding of 11 KV Line by laying two nos
Guarding of 11 KV Line by laying two nos GI wire parallel and fixing of lacings tilli at a distance at 2 to 3 Mtr as per RESPO manual and also including the cost of arragement of labour, T and P etc required for proper completion of work
Safe Carriage and Installation
Safe Carriage and Installation of 33KV by 11 KV CT and PT Pole Mounted metering unit on double pole after fixing of channel with M S Clamps and nuts bolts for holding the channel angle etc The unit body shall be earthed by connecting M S strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 KV line shall be connected to unit as per instructions of SDO and AE M The M S Strip and earth rod shall be included in the scope of work
Safe carriage and Installation
Safe carriage and Installation of 33KV by 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work
Provding and Fixing Wearing
Provding and Fixing Wearing GI pipe 6 O dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply
| Item # | Title | Description | Quantity | Unit | Consignee | Delivery (Days) | Price Trends |
|---|---|---|---|---|---|---|---|
| 1 | PCC and STP poles 8.5, 11 and 13 Mtr | Carriage of following poles from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading & unloading at the respective ends, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms | 270 | nos | edcaligarh2consignee | 21 | |
| 2 | Carriage of line material | Carriage of line material viz LT Cable, Conductor, GI earth wire, Barbed wire, Cross Arm, Angle, Channel, Insulator, various Clamps, XLPE cable, Cable, Stone pad and other line material from Store centre or from any other place to the respective site of work through the Kachha Pacca road including the work of its loading and unloading at the respective end, also including the work of dragging etc and also including the cost of labour, T and P carrier etc required for proper completion of work Dist 0 to 50 Kms | 7,000 | kg | edcaligarh2consignee | 21 | |
| 3 | PCC and STP poles 8.5, 11 and 13 Mtr | Erection of single support including complete H.T and L.T fittings with drilling and cutting as per RESSPO manual and as per direction of Engineer incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 134 | nos | edcaligarh2consignee | 21 | |
| 4 | PCC and STP poles 8.5, 11 and 13 Mtr | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling and cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 64 | nos | edcaligarh2consignee | 21 | |
| 5 | Installation and fixing of 11 KV TPMO. | Erection of double and Section pole on following poles including including complete H.T and L.T fittings with drilling & cutting and the work of complete line as per RESSPO norms manual and as per direction of Engineer Incharge including the cost of labour, T and P and carrier etc required for proper completion of work | 64 | nos | edcaligarh2consignee | 21 | |
| 6 | Erection and Grouting of stay set | Erection and Grouting of stay set including the work of nozzling etc as per RESSPO manual and also including the cost of arrangement of all grouting material, labour, T and P etc required for proper completion of work | 140 | nos | edcaligarh2consignee | 21 | |
| 7 | Providing and fixing | Providing and fixing of stay insulator | 140 | nos | edcaligarh2consignee | 21 | |
| 8 | ACSR Weasal, Rabbit and Dog Conductor. | Laying, sagging, stringing, binding and jumpering etc of line conductor on the newly erected pole as per RESSPO manual and as per direction of supervising engineer, including the cost of arrangement of labour, T and P carrier etc required for proper completion of work | 20,000 | mtr | edcaligarh2consignee | 21 | |
| 9 | ABC Conductor | ABC Conductor 3x50+1x35+1x16 Sqmm and 3x95+1x70+1x16 Sqmm and 3x120+1x95+1x16 Sqmm and 1x16+1x25 Sqmm | 800 | mtr | edcaligarh2consignee | 21 | |
| 10 | Grouting of PCC and STP poles | Grouting of PCC and STP poles 8.5, 11 and 13 Mtr Long as per RESSPO norms | 260 | nos | edcaligarh2consignee | 21 | |
| 11 | plinth | Making the plinth of Steel poles | 12 | nos | edcaligarh2consignee | 21 | |
| 12 | Fixing of earthing rod | Fixing of earthing rod as per RESSPO manual and as per direction of supervising engineer including the cost of labour, T and P etc Required for proper completion of work | 270 | nos | edcaligarh2consignee | 21 | |
| 13 | Chopping of tree branches | Chopping of tree branches which are touching to HT and LT lines | 40 | nos | edcaligarh2consignee | 21 | |
| 14 | Providing and Fixing of Clamps of LT | Providing and Fixing of Clamps of LT, Cross Arm Holding, F Clamp, Stay Clamp, Danger board clamp and all type clamps with Nut and Bolts as per actual site requirement | 320 | nos | edcaligarh2consignee | 21 | |
| 15 | Providing and Fixing | Providing and Fixing of LT shackle insulator | 20 | nos | edcaligarh2consignee | 21 | |
| 16 | Providing and Fixing | Providing and Fixing of missing Nut bolts and washer | 120 | kg | edcaligarh2consignee | 21 | |
| 17 | 25 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 48 | nos | edcaligarh2consignee | 21 | |
| 18 | 63 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 12 | nos | edcaligarh2consignee | 21 | |
| 19 | 100 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 10 | nos | edcaligarh2consignee | 21 | |
| 20 | 400 KVA Transformer | Carriage and Installation from site to Store and store to site following capacity transformer including the work of its loading and unloading, dragging etc and also including the cost of labour and T and P etc required for proper completion earthing and Jumphering of work | 4 | nos | edcaligarh2consignee | 21 | |
| 21 | Dismentling of old PCC and STP poles | Dismentling of old PCC and STP poles for shifting after dismentling of all accessories. It includes the work of cartage, cost of labour, T and P carrier etc required for proper completion of work | 4 | nos | edcaligarh2consignee | 21 | |
| 22 | Dismantling and removal | Dismantling and removal of existing conductor, cable, GI Wire from the various area preparing their coils and then stacking in the respective JEOs Store as per direction of Supervising Engineer It includes the work of cartage, cost of labour, T nad P carrier etc required for proper completion of work | 200 | mtr | edcaligarh2consignee | 21 | |
| 23 | Erection of section | Erection of section Tee pole including fixing of all fittings as per RESPO norms | 8 | nos | edcaligarh2consignee | 21 | |
| 24 | Carriage and Installation | Carriage and Installation of LT distribution box three phase distribution box from store centre Sarsol to pit site including loading and unloading at both ends mounting and fixing on pole also by making connections as per RESSPO norms | 32 | nos | edcaligarh2consignee | 21 | |
| 25 | Provding and Fixing, Filling | Provding and Fixing and Filling of 3x70,3x120,3X185 11 KV XLPE heat shrinkable cable jointing kits indoor and outdoor type including the cost of labour T and P carrier etc for proper completion of work | 10 | nos | edcaligarh2consignee | 21 | |
| 26 | Safe carriage | Safe carriage of 3x70,3x120,3X185,3x300 Sqmm 33 KV by 11 KV XLPE Cable from Store Center to respective site of work including loading and unloading at both ends for proper completion of work | 800 | mtr | edcaligarh2consignee | 21 | |
| 27 | Laying of under ground cable | Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV under ground cable by straight through after digging trench of 600 mm wide, 1500 mm deep, providing the fine sand cushion beneath and above the cable The cable shall be duly protected by Ist class bricks, two on either side and third on top of the cable, laid in series one after the other. The work includes supplying of fine sand and bricks, filling and ramming of the left out soil, closing the trench and levelling Spare cable shall be left and buried in the trench in the shape of rings at both ends All material except cable, labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost | 800 | mtr | edcaligarh2consignee | 21 | |
| 28 | Laying of Overhead cable | Laying of 3x70,3x120,3X185,3x300 Sqmm 33 KV and 11 KV Overhead cable work includes labour, T and P carrier etc, required for proper completion of work will be arranged by the contractor at his own cost | 100 | mtr | edcaligarh2consignee | 21 | |
| 29 | Guarding of 11 KV Line by laying two nos | Guarding of 11 KV Line by laying two nos GI wire parallel and fixing of lacings tilli at a distance at 2 to 3 Mtr as per RESPO manual and also including the cost of arragement of labour, T and P etc required for proper completion of work | 700 | mtr | edcaligarh2consignee | 21 | |
| 30 | Safe Carriage and Installation | Safe Carriage and Installation of 33KV by 11 KV CT and PT Pole Mounted metering unit on double pole after fixing of channel with M S Clamps and nuts bolts for holding the channel angle etc The unit body shall be earthed by connecting M S strip of size 1,8x1 finally connected to earthing rod of size 20mm x2540 mm 11 KV line shall be connected to unit as per instructions of SDO and AE M The M S Strip and earth rod shall be included in the scope of work | 4 | nos | edcaligarh2consignee | 21 | |
| 31 | Safe carriage and Installation | Safe carriage and Installation of 33KV by 11 KV pilfer proof metering cubicle from store centre, Sarsol to site of work | 4 | nos | edcaligarh2consignee | 21 | |
| 32 | Provding and Fixing Wearing | Provding and Fixing Wearing GI pipe 6 O dia on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable with boxes on the feeder double pole structure and making connections including supply | 4 | job | edcaligarh2consignee | 21 |
Discover companies most likely to bid on this tender
GST registration certificate
PAN card
Experience certificates for similar electrical transmission projects
Financial statements (last 2–3 years)
EMD submission proof (₹20,000)
Technical bid documents and compliance certificates
OEM authorization/authorizations for equipment supplied
Any bidder-specific declarations or affidavits as per ATC
Extended Deadline
11-May-2026, 3:00 pm
Opening Date
11-May-2026, 3:30 pm
Extended Deadline
07-May-2026, 3:00 pm
Opening Date
07-May-2026, 3:30 pm
Extended Deadline
04-May-2026, 3:00 pm
Opening Date
04-May-2026, 3:30 pm
Key insights about UTTAR PRADESH tender market
Bidders must submit GST, PAN, experience certificates, financials, and ₹20,000 EMD. Ensure OEM authorizations and technical compliance are supplied. The tender allows a 25% quantity variation, so prepare unit rates for potential adjustments and confirm delivery timelines per original order plus extended period formula.
Required documents include GST certificate, PAN card, experience certificates for similar works, financial statements for last 2–3 years, EMD submission proof, technical bid documents, and any OEM authorizations. ATC may demand additional compliance certificates; prepare in advance.
The scope covers transformers from 25 KVA to 400 KVA; bidders should demonstrate capability for installation, mounting, grounding, and related civil works as described in the terms. Include installation protocols and testing for each transformer category.
The data provided does not specify a hard deadline. Bidders should monitor the ATC document for the exact bid submission date and ensure compliance with EMD, OEM authorizations, and technical bid requirements before submission.
The EMD amount is ₹20,000. Prepare payment as per the payment mode stated in the ATC, and attach receipt or proof with the bid. EMD safeguards bid seriousness and enables bid withdrawal only under standard terms.
While IS standards are not explicitly listed, bidders should verify compliance with relevant IS/IEC standards for poles, transformers, and conductors, and supply ISI/ISO certifications if referenced in the ATC. Prepare documents demonstrating standard compliance where applicable.
If awarded, quantity may vary up to 25%, with delivery timing adjusted by the formula: (Increased quantity ÷ Original quantity) × Original delivery period, minimum 30 days. Bidder must price accordingly and state acceptance in the bid.
The contract includes laying underground and overhead cables, along with guarding of 11 KV lines, tree branch clearance, and associated installation of clamps, earthing, and protective measures. Provide detailed method statements and material specs in the technical bid.
Uttar Pradesh Power Corporation Limited (uppcl)
📍 ETAH, UTTAR PRADESH
Uttar Pradesh Power Corporation Limited (uppcl)
📍 ETAH, UTTAR PRADESH
E-municipalities - Eservices To Citizens And Employees Of Urban Local Bodies Of Uttar Pradesh
📍 GORAKHPUR, UTTAR PRADESH
Urban Administration And Devlopment
📍 BHIND, MADHYA PRADESH
Office Of Dg (mss)
Sign up now to access all documents
Main Document
BOQ
BOQ
ATC
GEM_GENERAL_TERMS_AND_CONDITIONS